- 1912 or +91471 2555544

Download details
Amendment No. 2 dated 02/09/2019-TransGrid 2.0 Project: Sabari Lines Package and Thrissivaperur Line Strengthening Package(Phase II) on Turnkey Basis Amendment No. 2 dated 02/09/2019-TransGrid 2.0 Project: Sabari Lines Package and Thrissivaperur Line Strengthening Package(Phase II) on Turnkey Basis

Amendment No. 2 dated 02/09/2019-TransGrid 2.0 Project: Sabari Lines Package and Thrissivaperur Line Strengthening Package(Phase II) on Turnkey Basis.

PAC = Rs.203,21,81,085/- (GST exclusive)

 

Data

Size523.12 KB
Downloads63
Created03-09-2019
Changed03-09-2019

Download