- 1912 or +91471 2555544

Download details
Strengthening of 33KV line, 2.1 km from Ollur Sub Station to Puthur Sub Station using A Poles in the flood affected areas of Electrical Section, Puthur under Project Monitoring Unit, Thrissur Strengthening of 33KV line, 2.1 km from Ollur Sub Station to Puthur Sub Station using A Poles in the flood affected areas of Electrical Section, Puthur under Project Monitoring Unit, Thrissur

Strengthening of 33KV line, 2.1 km from Ollur Sub Station to Puthur Sub Station using A Poles in the flood affected areas of Electrical Section, Puthur under Project Monitoring Unit, Thrissur.

PAC = Rs. 6,99,536/-

Click here to visit E-Tender web site 

Data

Size610.13 KB
Downloads39
Created30-09-2019
Changed30-09-2019

Download