- 1912 or +91471 2555544

Download details
Date Extension Corrigendum dated 10.01.2020-Supply, installation, testing and commissioning of 2500 Amps pantograph, double break and centre break isolator’s current carrying parts on the existing structures Date Extension Corrigendum dated 10.01.2020-Supply, installation, testing and commissioning of 2500 Amps pantograph, double break and centre break isolator’s current carrying parts on the existing structures

Date Extension Corrigendum dated 10.01.2020-Supply, installation, testing and commissioning of 2500 Amps pantograph, double break and centre break isolator's current carrying parts on the existing structures for capacity enhancement of 2KZAR #1, 2 and 3 feeder bays. Bus coupler and Transfer Bus coupler bays at 220 kV Substation, Areekode. Last date of submission of bid extended upto : 25-01-2020, 5 PM.

PAC = Rs. 1,55,41,400/-

Click here to visit E-Tender web site

Data

Size246.25 KB
Downloads19
Created13-01-2020
Changed13-01-2020

Download