Technical Corrigendum dated 16.01.2020-Supply, installation, testing and commissioning of 2500 Amps pantograph, double break and centre break isolator's current carrying parts on the existing structures Technical Corrigendum dated 16.01.2020-Supply, installation, testing and commissioning of 2500 Amps pantograph, double break and centre break isolator's current carrying parts on the existing structures

Technical Corrigendum dated 16.01.2020-Supply, Installation, testing and commissioning of 2500 Amps pantograph, double break and centre break isolator's current carrying parts on the existing structures for capacity enhancement of 2KZAR #1, 2 and 3 feeder bays, Bus coupler and Transfer Bus coupler bays at 220 kV Substation, Areekode.

PAC = Rs. 1,55,41,400/-