- 1912 or +91471 2555544

Download details
Procurement of 200 MW Solar Power from ground mounted grid connected solar PV power plants within the State of Kerala on long term basis (25 years). The supply of power shall commence not later than 1 st April 2021 Procurement of 200 MW Solar Power from ground mounted grid connected solar PV power plants within the State of Kerala on long term basis (25 years). The supply of power shall commence not later than 1 st April 2021

Procurement of 200 MW Solar Power from ground mounted grid connected solar PV power plants within the State of Kerala on long term basis (25 years). The supply of power shall commence not later than 1 st April 2021. Last date for submission of both non financial and price bids : 15.00 hrs on 17-04-2019.

Data

Size508.59 KB
Downloads340
Created02-03-2019
Changed02-03-2019

Download