Time Extension up to 21-12-2017-Supplying, testing, installing and commissioning of 21.5 Km HT Aerial Bunched Cable of size 3x150+1x120 Sq.mm on existing poles on Turnkey basis in IPDS scheme under Electrical Section, Neyyattinkara, Kammukincode 14 December 2017
Re E-Tender-Drawing 30 km, 1.1kV, LT Aerial Bunched Cable of size 3 x 95sq.mm + 1 x 16 sq.mm(Street Light) + 1 x 70 sq.mm (Insulated messenger) on existing poles in Turnkey basis for the Electrification of the Neyyattinkara Town 13 December 2017
Construction of D & E type flats at 110kV substation compound, Chalakudy 12 December 2017
Upgradation of 66kV Substation Neyyattinkara to 110kV – Construction of foundation of yard structure and equipments 08 December 2017
Supply, Laying, testing and commissioning of HT / LT UG cable including installation of feeder pillar box in connection with modification of distribution network around Sree Padmanabha Swamy temple(West & South Nada) on deposit work basis 06 December 2017
Supply, Laying, testing and commissioning of HT / LT UG cable including installation of feeder pillar box in connection with modification of distribution network around Sree Padmanabha Swamy temple(East & North Nada) on deposit work basis 06 December 2017
Tender Extension Notice-Drawing 13.8 Km HT ABC & 1.6Km LT ABC in IPDS Kayamkulam scheme under Electrical Section, Kayamkulam East, Kayamkulam West and Krishnapuram on turnkey basis 05 December 2017
Supplying, testing, installing and commissioning of 17Km LT Aerial Bunched Cable of size 3x95+1x70 +1x16 Sq.mm on existing poles on Turnkey basis in IPDS scheme in Electrical Section, Attingal under Electrical Division, Attingal 04 December 2017
Supplying, testing, installing and commissioning of 11 Km HT Aerial Bunched Cable of size 3x150+1x120 Sq.mm on existing poles on Turnkey basis in DDUGJY scheme (SAGY) at Anchuthengu Gramapanchayath in Electrical Section, Kadakkavoor 01 December 2017
Laying, Testing and Commissioning of 13 km of 11kV 3x300mm2 XLPE Aluminium UG Cable on Contract basis at various locations under Electrical Section Tirur East and Tirur West in Malappuram District 29 November 2017
Time Extension-Construction of 16Km, 1.1kV LT Aerial Bunched Cable of size 3x95sq.mm + 1x 16 sq.mm (Street Light) + 1x70sq.mm (Insulated messenger) on existing poles in Turnkey basis, for the Electrification of the coastal area at Adimalathura 24 November 2017
Supplying, Testing, Installing and Commissioning of 12km, 1.1kV LT Aerial Bunched Cable of size 3Cx95sqmm + 1x16sqmm (Street Light) + 1x70sqmm (Insulated messenger), on proposed poles, at various locations under Electrical Section, Nedumangad 23 November 2017
Supplying, testing, installing and commissioning of 21.5 Km HT Aerial Bunched Cable of size 3x150+1x120 Sq.mm on existing poles on Turnkey basis in IPDS scheme under Electrical Section, Neyyattinkara, Kammukincode and Udiyankulangara 22 November 2017
Drawing 30 Km of LT ABC of size 3X70 + 1X50 +1X16 on 8 m supports with an average span of 20-25 mts at various locations under Electrical Division Alappuzha & Cherthala under DDUGJY Scheme on turnkey basis 20 November 2017
Drawing 13.8km HT ABC & 1.6km of LT ABC in IPDS Kayamkulam Scheme under Electrical Section, Kayamkulam East, Kayamkulam West and Krishnapuram on turnkey basis 19 November 2017
Design, manufacture, supply, installation, testing and commissioning of 33/11kV containerised substation with 33kV RMU &11KV GIS, other accessories and cable termination kits and supply of 33kV and 11kV NCTs for Proposed 33 kV Substation at Blangad 18 November 2017
Appointment of EPC contractor for the design as per site conditions erection testing commissioning of Grid Tied Rooftop Solar PV Power plants on the Roof of buildings owned by LSGD District Panchayath Kozhikode with a total installed capacity of 480 kWp 18 November 2017
Supplying, testing, installing and commissioning of 13Km (9Km in Attingal Section and 4Km in Avanavanchery Section) HT Aerial Bunched Cable of size 3x150+1x120 Sq.mm on existing poles on Turnkey basis in IPDS scheme under Electrical Division, Attingal 16 November 2017
Time Extension-Construction of 16Km, 1.1kV LT Aerial Bunched Cable of size 3Cx50sq.mm + 1x 16 sq.mm (Street Light) + 1x35sq.mm (Insulated messenger) on existing poles in Turnkey basis, for the Electrification of the coastal area at Adimalathura 16 November 2017
Supplying, Testing, Installing and Commissioning of 13km HT ABC of size 3x150 + 1x120 sqmm on proposed 9mtr PSC pole and A-Poe supports, with an average span of 20-25mtr in Turnkey basis, at various location under Electrical Section, Nedumangad 15 November 2017
Supplying, testing, installing and commissioning of 17 Km HT Aerial Bunched Cable of size 3x150+1x120 Sq.mm on existing poles on Turnkey basis in IPDS scheme in Electrical Section, Varkala under Electrical Division, Attingal 10 November 2017
Corrigendum-Extension of E-Tender-Supplying, Testing, Installing and Commissioning of 16.5 km 1.1 Kv LT AB Cable of size 3x70 sq.mm + 1x16 sq.mm(street light) + 1x50 sq.mm (Insulated messenger) at various locations-Kaviyode, Cherukulam- Maanamoodu 07 November 2017
Drawing 11.5 Km 11 KV line using Aerial Bunched Cable along the east side of highway from Changankulangara to Oachira under DDUGJY Scheme under Electrical Section, Oachira 02 November 2017
Supplying, Testing, Installing and Commissioning of 12km, 1.1kV LT Aerial Bunched Cable of size 3Cx95sqmm + 1x16sqmm (Street Light) + 1x70sqmm (Insulated messenger), on proposed poles in Turnkey basis 02 November 2017
Supplying, testing, installing and commissioning of 11 Km HT Aerial Bunched Cable of size 3x150+1x120 Sq.mm on existing poles on Turnkey basis in DDUGJY scheme (SAGY) at Anchuthengu Gramapanchayath in Electrical Section, Kadakkavoor 31 October 2017
Supplying, testing, installing and commissioning of 17Km LT Aerial Bunched Cable of size 3x95+1x70 +1x16 Sq.mm on existing poles on Turnkey basis in IPDS scheme in Electrical Section, Attingal under Electrical Division, Attingal 26 October 2017
Construction of 16Km, 1.1kV, LT Aerial Bunched Cable of size 3Cx50sq.mm + 1x 16 sq.mm (Street Light) + 1x35sq.mm (Insulated messenger) on existing poles in Turnkey basis, for the Electrification of the coastal area at Adimalathura 26 October 2017
Construction of 110kV Double circuit line from 220kV Substation, Palakkad to 110kV Substation Malampuzha (Item Rate) 23 October 2017
Supplying, Testing, Installing and Commissioning of 16.5 Km 1.1 KV LT AB Cable of size 3 x 70sq.mm + 1 x 16 sq.mm(Street Light) + 1 x 50 sq.mm (Insulated Messenger) at various locations Kaviyakode, Cherukulam- Maanamoodu, Lourdesgiri, Thumbumkonam 21 October 2017
Supply, Construction, testing and Commissioning 18.45 Km of HT line with ABC of size 3x120Sqmm + 1x95Sqmm insulated messenger on 9 m supports with an average span of 20-25 mts at various locations of Electrical Division Thiruvalla 18 October 2017