- 1912 or +91471 2555544

BSHTC – Wayand – Letting out space on revenue sharing basis for The running of water ball games for the tourists 18 March 2017
Construction of 110 kV Substation Muttom – Electrification of Control Room Building 10 March 2017
DRIP- Construction of Generator room at Moozhiyar dam premises under Kakkad HEP 08 March 2017
Construction of 33 kV Substation, Pattoor – Erection of 2x5 MVA 33/11kV Transformers at 33 kV substation, Pattoor including Loading, Unloading, Assembly and Hot oil circulation 23 February 2017
Construction of 220kV Substation, Kattakada: -Erection of 2 nos of 66.67MVA, 220kV/110kV Transformer at 220kV Substation, Kattakada 16 February 2017
Construction of 33 kV Substation Kumily- Electrification of Control Room Building 06 February 2017
Disposal of unserviceable items available at Electrical Sections Kesavadasapuram and Vattappara under Electrical Division, Kazhakuttom 01 February 2017
Constructing 1.3kV HT/LT line for interlinking CHMM college to Ezhippuram for interlinking Kedakulam and Palayamkunnu feeder at Location CK 40 to CK 71 under the Electrical Section, Kedakulam of Electrical Sub Division Varkala 13 January 2017
Construction of 33 kV Containerised GIS Substation - Laying Earth Mat 12 January 2017
BDPP – Conducting Ambient Air Quality Monitoring work at BDPP site including collection of Data, Laboratory analysis and submission of the test report for a period of 1 year 10 January 2017
Sale of numbered Trees exisitng at Cheruvally Estate along the route of 110kV Kanjirapally – Erumely Proposed line facilitating constructing the 110kV lne from Kanjirapally to Erumely 07 January 2017
Sale of various scrap materials stacked at Circle Store, Kattoor under Electrical Circle, Irinjalakuda 22 December 2016
Re-Tender Cum Auction Notice-Disposal of old and unserviceable items in various Substations under Transmission Circle, Thrissur 19 December 2016
Disposal of old and unserviceable items stacked at respective destinations under Transmission Circle Kannur 14 December 2016
110 KV Substation, Kasaragod – Construction of black topped road inside the yard 07 December 2016
110 KV Substation, Kasaragod – Repair and maintenance of Staff Quarter No. D1 07 December 2016
Construction of Foundation of yard and equipment Structures Erection of yard and Equipment Structures, Erection of Equipments, Equipment Inter connection, Laying power cable & Earth wire stringing of 33kV Substation Manimala 30 November 2016
Brahmapuram Diesel Power Plant – Sale of fuel oil-water sludge 23 November 2016
33 kV Substation Vannappuram-11 kV Yard mettalling 02 November 2016
Constructing 0.6Km 11kV 3x300Sqmm XLPE UG Cable dedicated feeder to Civil Station, District Panchayath and Court Complex from 110kV Sub Station Vidhyanagar & Constructing 0.510Km 11kV 3x300Sqmm XLPE UG Cable Circuit 27 October 2016
Construction of a platform for Sub Regional Store, Tirur 04 October 2016
BDPP - Re-construction of damaged portion of compound wall in IOC area and providing gates at Deputy Chief Engineer's office and quarry area 01 October 2016
Disposal of scrap stored at Sub Regional Store, Perumbavoor situated at Aluva and Disposal of PSC/RCC/A/Tubular Post lying at different locations of various section offices under Electrical Division, Perumbavoor and Angamaly 30 September 2016
BDPP- Special repair to Quarter No.9 26 September 2016
Capital work for 110kV Substation Aroor-Providing 66 kV Bus PT and Construction of stair case using angle iron and GI pipes at 110kV substation, Thycattussery 24 September 2016
Renovation of computer room attached to Office of the Financial Adviser at Vydyuthi Bhavanam, Pattom, Thiruvananthapuram 20 September 2016
Renovation works to old Regional Store Building at Aluva for accommodating APTS office and Construction of coloured aluminium roofing at roof top of society building and repairing toilet block of Electrical Circle, Perumbavoor 09 September 2016
Leasing out of open parking space owned by KSE Board Ltd in & around the Sun Moon Valley Boating Centre (Madupetty Dam Main Entrance Area (Old & New), Munnar on 11 months lease basis 09 September 2016
Renovation works of Meter lab in TMR Division, Pallom by providing and fixing aluminium partition and gypsum false ceiling 06 September 2016
Paving Interlock concrete blocks to the front and side yard of Vydyuthi Bhavanam Vatakara 06 September 2016