Constructing 0.55km 11 kv OH line from Chettikkunnu to Paragon, Re routing 1km exising HT line from Paddy field to Main road, LT conversion 4.4km – Muttom – Mariappally area, Replacing 100 KVA Tfr- 5 Nos, Replacing 160 KVA TFR – 1 No under IPDS Scheme 24 March 2017
110kV Substation Kuthuparamba- Feeder bay for LILO arrangement and balance work of Nedumpoyil and KSIDC feeder bays – Foundation works for Columns and Equipments 23 March 2017
Fabrication and painting of 450Nos special type 33 kV 'A' poles of 14m length at MF1 Angamaly for the year 2016-17 (Transmission Target – 3rd phase) 22 March 2017
IHEP – Upkeep and maintenance of Moolamattom colony for the year 2017-18 – Repairs to buildings 20 March 2017
O&M of control shaft, Kuttiyadi saddle dam gate and hoisting equipment's and tunnel structure for the year 2017-18 20 March 2017
Construction of Double bus at 220KV Substation, Edamon – Equipment earthing phase 2 under PSDF Scheme 17 March 2017
DDUGJY: Electrification of Kaithapara area under Electrical Section, Kanjikuzhy 17 March 2017
DDUGJY: Electrification of Manayathadam area under Electrical Section, Kanjikuzhy 17 March 2017
DDUGJY: Electrification of Kallemadamkudy area under Electrical Section Painavu 15 March 2017
DDUGJY: Electrification of Anganavady – Kurisupally area under Electrical Section Painavu 15 March 2017
Maintenance work of office building of Electrical Division office Chittur, Palakkad 15 March 2017
Conversion of 2 KM existing L T O H Lines to ABC cable at GHANDI SMARAKAM ROAD(450MTR), KATHIPARATHADAM ROAD(1.55KM) in DDUGJY Scheme under Electrical section, Kanjikuzhi 15 March 2017
DDUGJY: Construction of 3 KM 11 KV line from Power House to Kanjikuzhi under Electrical Section, Kanjikuzhy 15 March 2017
Electrification of Makkuvally 14 March 2017
Power evacuation from 110kV Substation, Rayonpuram to Kanjoor area under Electrical section, Kanjoor 14 March 2017
Construction of 110 kV Substation Marady - Construction of Yard Structure Foundations, Cable Trench and Erection of Yard Structures 13 March 2017
Construction of 1 No. Transformer Bay of 33/11KV, 5MVA Transformer at 33KV Koduvayur substation under IPDS Scheme 13 March 2017
CORRIGENDUM -1-Tender Extension Notice-DRIP-Idamalayar HEP- Laying 11KV UG cable from Idamalayar colony to Dam Top at Idamalayar 13 March 2017
Drawing 1.3 Km 11 Kv ABC from Upputhara Sub Station to Thonithadi with A pole supports 13 March 2017
Constructing 1KM HT Line, Installing 1 No 100KVA Transformer, Reconductoring 1KM LT 3 Phase line and constructing 1KM LT single phase line under Electrical Section Erattayar under DDUGJY Scheme 10 March 2017
Electrification of Veloor Kara by constructing 3559 m LT single phase 2 wire line, constructing 2107 m LT 3 phase 4 wire line and 200 m single phase to 3 phase conversion under DDUGJY scheme under Electrical Section Karimannoor 09 March 2017
Construction of 2Km 11KV line, 0.05Km. LT line and installation of 4 numbers of 100KVA Transformers at different locations of Electrical section Thalayazham 09 March 2017
Constructing 3.85 KM (3.5 KM fresh line & 350 M drawing on existing poles) from Manimala 33 kV Substation to Kaddorkadavu under Electrical Section Vaipur 08 March 2017
Maintenance of Vydyuthi Bhavanam Vatakara 08 March 2017
Electrification of Arekkap (Kappayam) Tribal Colony (49 Households) in Athirappilly Gramapanchayath under deposit work scheme of SC/ST Department under Electrical Section, Pariyaram 06 March 2017
Laying of Earth mat for extension of 110kV yard at Poringalkuthu Power House 06 March 2017
Construction of Indoor control room and cable trench at 33kV Substation, Kuttiyattoor 04 March 2017
E- Re tender-Sabarigiri-Edamon II and III 220KV feeders- Clearing thick and thorny jungle, felling trees and cutting and chopping of hanging tree branches within the ROW of 35mtrs between location 29 to 80 03 March 2017
Constructing 5.2 km line, Installing 2 Nos. of 100kVA transformer, Constructing 4.5 km LT 3 ph, 6.5km LT sp line at Memary ST Tribal colony as Total Electrification under Electrical Section Upputhara 03 March 2017
IHEP – Upkeep and maintenance of Circuit House, Circuit House Annex and Inspection Bungalow at Moolamattom for the year 2017-18 – Supply of labourers for the period 01.04.2017 to 31.03.2018 02 March 2017