Laying of Earth mat for extension of 110kV yard at Poringalkuthu Power House 06 March 2017
Construction of Indoor control room and cable trench at 33kV Substation, Kuttiyattoor 04 March 2017
E- Re tender-Sabarigiri-Edamon II and III 220KV feeders- Clearing thick and thorny jungle, felling trees and cutting and chopping of hanging tree branches within the ROW of 35mtrs between location 29 to 80 03 March 2017
Constructing 5.2 km line, Installing 2 Nos. of 100kVA transformer, Constructing 4.5 km LT 3 ph, 6.5km LT sp line at Memary ST Tribal colony as Total Electrification under Electrical Section Upputhara 03 March 2017
IHEP – Upkeep and maintenance of Circuit House, Circuit House Annex and Inspection Bungalow at Moolamattom for the year 2017-18 – Supply of labourers for the period 01.04.2017 to 31.03.2018 02 March 2017
Construction of 11 KV Power Cable Trench at 110 KV Substation, Chalakudy 02 March 2017
Construction of 2.8Km 11KV line, 0.1Km. LT line and installation of 4 numbers of 100KVA Transformers at different locations of Electrical section Chempu 02 March 2017
Painting of the Towers of Koothattukulam- Thodupuzha feeder (loc No. 1 to 61) 02 March 2017
Painting of the Towers of Moolamattom- Kuyilimala portion of 66kV Sengulam- Moolamattom feeder (loc No. 45-83) 02 March 2017
Drawing 11KV ABC from Azheekal Samithi Junction to the Ice Plant in favour of SMT Kasturi Bai under Electrical Section, Oachira 01 March 2017
220 kV Substation Kaniyambetta – Yard structure painting work 01 March 2017
Drawing 650M 11KV ABC from Oachira P&T Transformer towards East up to Water Treatment Plant at Memana under Electrical Section, Oachira under Matsyagramam Project 25 February 2017
e-Re Tender-Pallivasal Extension Scheme- Modification and repairs to G1 A&B quarters in Munnar Colony 25 February 2017
Constructing 2.7km 11kV line from Kurisinkal to Azhikanni and installing 100kVA transformer under Electrical Section, Kollappally 23 February 2017
Construction of new 11 KV feeder from 33 KV Methala Substation to Kodungallur for 3.5 Km along the existing line route, under Electrical Section, Kodungallur No.2, using departmentally supplied ABC cable of size 3x120 sqmm+1x95 sqmm 23 February 2017
Constructing 1.9Km LT Three phase 5 wire line and dismantling existing HT/LT line from Cicily Jetty to Thandassery due to road widening in favour of GIDA under Electrical Section Vypin 22 February 2017
Kuttiady HEP (Part-IV)-Construction of Security cabin and gate at the entrance of Kakkayam Reservoir (at the end of PWD Kakkayam dam road) 22 February 2017
Corrigendum No. 1-O & M of 220 KV Sabarigiri – Pothencode (SBPC) feeder Cutting and clearing jungle growth along the line route from location No 1 to 30 22 February 2017
Construction of 4.45Km 11KV line, 0.15Km. LT line and installation of 3 numbers of 100KVA Transformers at different locations of Electrical section Vaikom 22 February 2017
Laying of 815m Under Ground Cable using 3x300 sq.mm XLPE Cable under Electrical Section, Chalakudy (Open trench – 400m & HDD -415m) 22 February 2017
IHEP- Upkeep and maintenance of Moolamattom colony -Jungle clearance at Moolamattom colony, Switchyard, PH entrance, Tailrace channel area for the year 2017-18 18 February 2017
IHEP – Upkeep and maintenance of Moolamattom colony for 2017-18 -Sanitary arrangements 18 February 2017
220 kV solar substation Ambalathara- Control Room -Providing Aluminum Composite Panel Cladding on main entrance side of the building and false Ceiling inside the building 15 February 2017
Construction of 11kv Power Cable Trench at 110KV Substation, Chalakudy 15 February 2017
O&M work of EHT lines - Providing Additional earthing, Counter poise earthing and earth conductor earthing for towers of 220kV Kayamkulam - Kundara and Edamon - Kundara LILO feeders (2KYKD & 2EMKD) feeders 13 February 2017
Conversion of the single Tension/Suspension insulator string into double Tension/Suspension insulator string at main road crossing, river crossings and thickly populated areas, and restringing of conductors for maintaining statutory ground clearance 13 February 2017
Painting compound wall, Basement, Gate, Fencing post and Painting of Control Room, Temporary Shed, Security Cabin etc. and repair and maintenance of bath room, sanitation, water supply at 110KV Substation Erumely 13 February 2017
Erection of 110KV and 11KV panels, laying dressing, wiring and termination of Control cable at 110kV Substation, Erumely 13 February 2017
HT Line Works-Installation of Transformer 4Nos. & Construction of 11 KV Line 2.55Km under DDUGJY of Electrical Section Thalayolaparambu 13 February 2017
110KV Substation, Kinalur-Construction of Road Yard fencing, Yard mettaling and compound wall on the front side 13 February 2017