- 1912 or +91471 2555544

Engaging Consultancy for the Implementation & Certification of ISO 9001:2008 for all Offices under & including System Operation Circle, Kannur 13 January 2017
Maintenance work of Store Building of TMR Division Shoranur 12 January 2017
Construction of 33kV containerized Substation at Kachery, Attingal-Construction of mat foundation cum fire wall for Transformers, mat foundation for Container control Room, Cable Trench and Oil pit for containerized substation 11 January 2017
DDUGJY: Replacement of faulty meters and mechanical meters with new meters under Electrical Section Moolamattom 07 January 2017
110KV Substation, Kubanoor- Providing 110KV supply to 110/25KV traction substation at Uppala - constructing foundation for equipment structure 07 January 2017
DRIP- Sholayar HEP- Providing underground power cabling system including fixing of Generator switch board, Distribution boards ...etc at Sholayar dam premises 06 January 2017
DRIP-Idamalayar HEP-Construction of a retaining wall and platform for evaporimeter & rain gauge station near the renovated Research & Dam Safety office building at Idamalayar 06 January 2017
Fitting and Errecting 20 DP structures and Installing 100 KVA Transformers at different places under Electrical section Pala 06 January 2017
Drawing 10 Km 11 KV OH line using PSC pole and A type poles, 30 DP structures and Fitting 10 AB Switches 06 January 2017
Metering Works-Replacing faulty SP and 3P energy meter including dismantling of old meter, connecting of new meter/giving electric connection including conveyance of new meter to the site and returning old meters to section store and connect CT meters 06 January 2017
Fabrication Erection and testing of the air cooler main inlet and outlet 6” ring pipes, Turbine Guide Bearing & Shaft seal cooling water pipes and damaged portion of LGB outlet pipes of Unit#1 60MW Generator at Lower Periyar Power House, Karimanal 05 January 2017
Kuttiady Augmentation Scheme- (Part-III)- Widening the existing concrete deck slab-Fabrication, supply and erection of steel walkway 04 January 2017
Corrigendum-Time Extension-Constructing 5.5 KMt 11 KV Line from Koottikal to Yendayar under Electrical Section Koottickal 04 January 2017
Construction of foundation for yard and equipment structures and errection of yard and equipments, stringing bus bars and earth shielding in connection with the Upgradation work of 66 KV Substation, Mundakkayam 04 January 2017
Construction of Power Cable Trench for 11KV Indoor Panel Set at 66KV Substation Kannampully 03 January 2017
Construction of front side compound wall and gate at 110KV GIS Substation, Kollam 03 January 2017
220 KV Substation Edamon – Construction of 2nd double bus- Construction of yard fencing 31 December 2016
220 KV Substation Edamon – Construction of 2nd double bus- Yard metalling of new yard 31 December 2016
Overhauling of 220/110 KV, 200 MVA # 3 Transformer bank at 220 KV Substation, Kalamassery 31 December 2016
Laying of 2.5 km of LT 2 wire XLPE armoured UG cable for Electrifying 10 Tribal Settlement Colonies, under Electrical Section, Aryanad, in Electrical Division, Kattakada, under Electrical Circle, Kattakada Thiruvananthapuram 29 December 2016
Constructing 2 Km 11 KV line (HT/LT), 5.35 KM 3 phase 4 wire line, 5.5 Km single phase 2 wire line, and installing 2 Nos 100 KVA Transformers for Electrification of Rosemala 28 December 2016
Erection of 1400 Nos of LT PSC Poles for constructing LT 3 phase ABC for Electrifying 10 Tribal Settlement Colonies, under Electrical Section, Aryanad, in Electrical Division, Kattakada, under Electrical Circle, Thiruvananthapuram 28 December 2016
E Tender Extension Notice-Conversion of 110 kV Malaparamba – Ramapuram DC line to Multi circuit – Balance works 24 December 2016
Laying 8 km, 3X120 sqmm 11 kV XLPE UG Cable for Electrifying 10 Tribal Settlement Colonies, under Electrical Section, Aryanad, in Electrical Division, Kattakada, under Electrical Circle, Thiruvananthapuram 24 December 2016
DRIP: Rehabilitation including remedial measures and basic facilities of Idukki Hydro Electric Project – Electrification of Idukki dam (Part IV -works) 21 December 2016
Installation of 33/11kV 5MVA Transformer at 110kV Substation Kurumassery-construction of yard structure & equipment foundation and erection of yard structure and cable trench 21 December 2016
Drawal of 2.5km Arial bunched cable at various locations under Electrical Section, Eachur 21 December 2016
Erection of 110kV towers in connection with the reconductoring work of 66kV Kuthumunda -Thamarassery feeder 21 December 2016
Formation and paving concrete tile in the road at 33kV Substation, Manimala 21 December 2016
Constructing 5.5 Kmt 11 KV Line from Koottikal to Yendayar under Electrical Section Koottickal 21 December 2016