- 1912 or +91471 2555544

Work tenders with PAC between 50 Lakhs & 1 Crore

Target II- Second Phase - Fabrication of lattice structures (C type) at Fabrication Shop, C.M.Division, Pallom for the year 2016-17 23-05-2017
DRIP-Improvement of basic facilities under Kuttiady Augmentation Scheme (Part-III)-Renovation of IB at Padinjarathara & Fabrication, supply and erection of steel walkway at Banasurasagar dam top 17-05-2017
Proposed 33kV Substation, Kelakam – Construction of control room building, compound wall cable trench and road 15-05-2017
Renovation of Substation LT Auxiliary Distribution System at 220kV Substation Kalamassery 11-05-2017
Tender extension notice-220 kV Substation, Edamon - Construction of 2nd Double Bus - Balance protection works on South side up to main entrance of the substation - works under PSDF Scheme 08-05-2017
IHEP - Repairs to damaged portions of the main road and various roads in Moolamattom KSEB colony 28-04-2017
220 kV Substation, Edamon - Construction of 2nd Double Bus - Balance protection works on South side up to Main entrance of the Substation- works under PSDF Scheme 27-04-2017
Extension to the Office of Transmission Circle Kalamassery 12-04-2017
110kV SUBSTATION ERAMALLOOR – Site Levelling, Construction of compound wall and allied works 01-04-2017
Conversion of Malaparamba-Ramapuram DC Line to Multi circuit – Balance works 31-03-2017
Execution of Idukki Augmentation - Vadakkepuzha Extension Scheme (0.70 Mu) 28-03-2017
Extension to the Office of Transmission Circle Kalamassery 24-03-2017
Construction of 66 kV Substation Odakkali- Construction of Retaining Wall and Compound Wall 23-03-2017
Addendum No.1-Stringing 3.5 km 3 phase 4 wire HT Aerial Bunched Cable of size 3x150 sq.mm. and insulated messenger 1 x 120 sq.mm. through the 11 KV line on Turnkey basis at Electrical Section, Kanjiramkuzhy under Electrical Division, Kollam DDUGJY Scheme 22-03-2017
Extension of last date of submission and date of opening of bid-Stringing 3.5 km 3 phase 4 wire HT Aerial Bunched Cable of size 3x150 sq.mm. and insulated messenger 1 x 120 sq.mm. through the 11 KV line on Turnkey basis 22-03-2017
DRIP: Idukki Hydro Electric Project -Rehabilitation including remedial measures and basic facilities of Kallar & Erattayar dams 02-03-2017
Supply and drawing of 2.75 km of 33kV 3 x 95 sq mm Arial Bunched Cable using 1 X 70 sq.mm AAAC insulated messenger wire from 33kv Vydhyuthi Bhavanam substation to proposed 33kV substation Olavakkode 01-03-2017
220 kV Substation, Edamon – Construction of 2nd Double Bus – Protection works required on South & West side of the substation compound 22-02-2017
Stringing 3.5 km 3 Phase 4 wire HT Aerial Bunched Cable of size 3x150 sqmm and insulated messenger 1 x 120 sqmm through the 11 kV line on Turn Key basis at Electrical section Kanjiramkuzhy under Electrical Division Kollam DDUGJY Scheme 17-02-2017
DRIP: Idukki Hydro-Electric Project - Providing concrete blocks along MWL at Ayyappankovil area (Part VI) 07-02-2017