Capacity - 2MW
This is the power house situated at the highest level in Kerala at 1556 m above MSL and constructed in 1997-98 as Dam toe power house of Maduppetty Reservoir. The 2 MW generator generates at 11 kV and is connected to the 11 kV Tata feeder. The station uses horizontal shaft francis turbine. The 275 rpm turbine and 750 rpm generator are coupled through a speed increasing gear box. The discharged water from this power station is heading towards Ramaswamy Iyer headworks for further power production at Pallivasal Powerhouse. The annual Generation Capability of Maduppaty Power house is 6.40 MU. M/s Jyoti Ltd. Baroda-Gujarat has executed the project for Kerala State Electricity Board.
Salient Features:
Location with district: Madupetty, IDUKKI
Category: Hydro Power Project
Capacity: 2 MW
River: Muthirapuzha
Dam: Madupetty
Annual Energy Potential (Designed): Firm 4.3 MU
: Seasonal 2.05 MU
Total : 6.35 MU
Reservoir:
Catchment Area: 105 Sq. K.M (40.54 Sq. Miles)
Gross Storage: 55.23 MCM
Generation per MCM: 0.0678 MU
Design Head: 29.3 Mts.
Full Reservoir level (FRL):5248 Ft. (1599.59 M)
Min. Draw down Level (MDDL): 5146.33 Ft.
Design Disch. Through Machine: 8.193 M3
Date of Commissioning:
Unit – 1: March 1998
Technical:
1. TURBINE
a) Type: Reaction Type (Horizontal Francis)
b) Make: Jyothi LTD, Baroda
c) Design Net Head: 29.3 Mts.
d) Rated Output: 2.137MW
e) Output Max./ Min :2.0 MW/ 0.5 MW ( Running )
f) Normal Speed: 275 RPM
g) Runway speed: 640 RPM
h) Disc. Through Machine: 8.193 M3/sec
2. GENERATOR
a) Type: Rotating Salient Pole
b) Make: Jyothi LTD, Baroda
c) Rated Voltage: 11000 V
d) Rated Output: 2353 KVA
f) Speed: 750 RPM
g) Power Factor:
3. Power evacuation
a) Feeder Name with voltage level
Madupetty Feeder (11 KV)