BACK UP LD CONSTRUCTION
- A new backup Load Despatch is proposed at Pothencode considering the suitability/availability of the land.
- Building construction needs to be completed by the first quarter of 2023 so as to match the timelines of the SCADA-Up project.
- Sanction received for Back Up LD construction (BO:13.06.22)
- Architectural consultancy –Tendered, WO issued to KlimArt on 9.12.2022
- Drawings – Approval issued 4.07.2023
- A preliminary Estimate has been received from Klim Art( 7.07.2023): under verification.