KSEBL Owned Small Hydro Projects
Sl.No
|
Name of Station
|
Installed Capacity of the plant |
Firm annual Gen.Capability |
No. of Generators. X Capacity in (MW) |
Plant Capcity in (MW) |
MU |
1 |
Kallada |
2x7.5 |
15.00 |
65.00 |
2 |
Malankara |
3x3.5 |
10.50 |
65.00 |
3 |
PLBE |
1x16 |
16.00 |
74.00 |
4 |
Peppara |
1x3 |
3.00 |
11.50 |
5 |
Madupatty |
1x2 |
2.00 |
6.40 |
6 |
Malampuzha |
1x2.5 |
2.50 |
5.60 |
7 |
Lower Meenmutty |
(1x0.5 + 2x1.5) |
3.50 |
7.63 |
8 |
Chembukadavu - 1 |
3x0.9 |
2.70 |
6.59 |
9 |
Chembukadavu - 2 |
3x1.25 |
3.75 |
9.03 |
10 |
Urumi -1 |
3x1.25 |
3.75 |
9.72 |
11 |
Urumi -2 |
3x0.8 |
2.40 |
6.28 |
12 |
KTR |
3x1.25 |
3.75 |
17.01 |
13 |
Poozhithode |
3 x 1.6 |
4.80 |
10.97 |
14 |
Ranni-Perinadu |
2x2 |
4.00 |
16.73 |
15 |
Peechi |
1x1.25 |
1.25 |
3.21 |
16 |
Vilangad |
3x2.5 |
7.50 |
22.63 |
17 |
Chimmony |
1x2.5 |
2.50 |
6.70 |
18 |
Adyanpara |
2x1.5+0.5 |
3.50 |
9.01 |
19 |
Barapole |
3x5 |
15.00 |
36.00 |
20 |
Poringalkuthu Micro (Screw Turbine) |
1x 0.011 |
0.01 |
0.082 |
21 |
Vellathooval |
2x1.8 |
3.60 |
12.170 |
22 |
Perunthenaruvi |
2x3 |
6.00 |
25.770 |
23 |
Kakkayam SHEP |
2x1.5 |
3.00 |
|
24 |
Chathankottunada Stage-II |
3x2 |
6.00 |
|
25 |
Upper Kallar |
2x1 |
2.00 |
|
|
Sub Total (SHEP) |
|
128.01 |
427.03 |
|
Total (Hydel) |
|
2066.61 |
7207.30 |