|  Visit Old Website

DMS SCADA under R- APDRP

DMS SCADA under R- APDRP

As part of implementation of Part-A of RAPDRP, SCADA/DMS project for remote controlling and monitoring  distribution systems was successfully implemented in Thiruvananthapuram, Ernakulam and Kozhikode towns. Main features of SCADA/DMS are Control Centers in Trivandrum, Ernakulam & Kozhikode cities for the real time monitoring and control of 11kV distribution network, Remote terminal units (RTU) in 50 substations, Local Data Monitoring system (LDMS) at substations, Feeder Remote Terminal Units (FRTU) in 2994 Ring Main Units (RMU) locations on 11kV feeders, integration with State load dispatch Centre (SLDC), IT Data Centre (ITDC)and Disaster Recovery (DR) center, Advanced distribution management system (ADMS), Schematic and geographical display of 11kV network by integrating with GIS system, Fault location isolation and supply restoration (FLISR) for improved customer service, planned maintenance support, historical storage data for analysis, load flow analysis, etc. The SCADA implementing Agency is M/s Schneider Electric India Pvt. Ltd.. Three control center has been made operational in the respective SCADA Towns viz Trivandrum, Ernakulam and Kozhikode with  50 RTU stations and 2994 FRTUs.
The major key benefits of implementing SCADA project Kerala is listed below : 
1.    By implementing SCADA/DMS in three towns, frequency of Power interruption (SAIFI) and power outage duration (SAIDI) has been drastically reduced. 
2.    Kerala is having a geographically diverse terrain and the implementation of SCADA in 3 towns have benefitted KSEBL for real-time monitoring & control of 11kV distribution network from Control Centre. This have proved very much beneficial to the state, especially during torrential rain & natural calamites. 
3.    KSEBL is one of the few utilities in India where the 11kV distribution network is developed in GIS integrated with SCADA, through CIM/XML from GIS. With this, all the ADMS functionalities envisaged in the RFP are in operation. 
4.    The schematic & geographical display of 11 kV distribution network  including RMU internal diagram is generated for SCADA towns through integration of GIS system. 
5.    By implementation of remote operation & FLISR (fault location isolation & supply restoration), the supply restoration time reduced from Hours to a few minutes.
6.    Integrated 50 SCADA enabled substations with SLDC at Kalamassery through ICCP integration.

A. SCADA DMS – Trivandrum
14 Substations & 1450 RMU locations are covered in Trivandrum Project area . 4 Nos. Remote Video display units(RVDU) locations are installed as part of R-APDRP Project. Project  has been made operational from 17-07-2019. 
B. SCADA DMS- Ernakulam
25 Substations & 750 RMU locations are covered in Ernakulam Project area . 9 Nos. Remote Video display units(RVDU) locations are installed as part of R-APDRP Project. Project  has been made operational from 20-09-2019.
c. SCADA DMS- Kozhikode
11 Substations & 794 RMU locations are covered in the Kozhikode Project area. 3 Nos. Remote Video display units (RVDU) locations are installed as part of R-APDRP Project. Project  has been made operational from 25-08-2019.
 

Rating

Please rate us and give your valuable feedback if you are satisfied with this KSEBL website service.