Hydro Projects - Renewable Energy
Sl. No.
|
Stations
|
Installed capacity |
TOTAL |
I |
Small Hydro (KSEB) |
1 |
Kallada |
15 |
2 |
Peppara |
3 |
3 |
Malankara |
10.5 |
4 |
Madupetty |
2 |
5 |
Chembukadavu |
6.45 |
6 |
Urumi |
6.15 |
7 |
Malampuzha |
2.5 |
8 |
Lower Meenmutty |
3.5 |
9 |
Kuttiyadi Tailrace |
3.75 |
10 |
Poringalkuthu LBE |
16 |
11 |
Neriamangalam Extension |
25 |
12 |
Poozhithode |
4.8 |
13 |
Ranni Perunad |
4 |
14 |
Peechi |
1.25 |
15 |
Vilangad |
7.5 |
16 |
Chimmony |
2.5 |
17 |
Adyanpara |
3.5 |
18 |
Barapole |
15 |
19 |
Vellathooval |
3.6 |
20 |
Poringalkuthu Micro |
0.011 |
21 |
Perunthenaruvi |
6 |
22 |
Kakkayam |
3 |
23 |
Mankulam GP IPP hydel |
0.11 |
24 |
Deviyar MHEP |
0.05 |
|
Small Hydro (KSEB) Total |
145.171 |
II |
Small Hydro (CPP) |
1 |
Maniyar |
12 |
2 |
Kuthungal |
21 |
|
Small Hydro (CPP) -Total |
33 |
III |
Small Hydro (IPP) |
1 |
Ullunkal |
7 |
2 |
Iruttukkanam |
4.5 |
3 |
Kaarikkayam |
15 |
4 |
Meenvallom |
3 |
5 |
Kallar |
0.05 |
6 |
Pathankayam |
8 |
|
|
37.55 |