Kuttiyadi Tail Race Power House

Capacity -3.75MW

Brief History:


Kuttiadi Tail Race Power house is a Small Hydro Power Project  which utilise the tail race water of KHEP & KES power houses. The project with an installed capacity of 3x1.25MW. The project is situated at Kozhikode District near Kakkayam Power house.

Salient Features:

Location with district                :Kakkayam,Kozhikode
Category                                    : Hydro Power Project
Capacity                                    : 3.75 MW (3 x1.25MW)
River                                         : Tail Race Project
Dam                                         :  NA
Annual Energy Potential                         : 17.1MU

Reservoir :

Catchment Area : ……….. Sq. K.M (………. Sq. Miles)      : NA
Gross Storage :…. MCM                      : NA
Generation per MCM                              : 0.043MU
Design Head                                     : 20.176 Mts.
Full Reservoir level (FRL) :…… Ft. (……… M)      : NA
Min. Draw Down Level (MDDL) :………Ft.             : NA
Design Disch. through Machine                   : 24.36 m3/sec

Date of Commissioning:

Unit – 1                                   : 19-06-2008
Unit – 2                                   : 22-06-2008
Unit – 3                                   : 23-10-2009