Capacity -3.75MW
Brief History:
Kuttiadi Tail Race Power house is a Small Hydro Power Project which utilise the tail race water of KHEP & KES power houses. The project with an installed capacity of 3x1.25MW. The project is situated at Kozhikode District near Kakkayam Power house.
Salient Features:
Location with district :Kakkayam,Kozhikode
Category : Hydro Power Project
Capacity : 3.75 MW (3 x1.25MW)
River : Tail Race Project
Dam : NA
Annual Energy Potential : 17.1MU
Reservoir :
Catchment Area : ……….. Sq. K.M (………. Sq. Miles) : NA
Gross Storage :…. MCM : NA
Generation per MCM : 0.043MU
Design Head : 20.176 Mts.
Full Reservoir level (FRL) :…… Ft. (……… M) : NA
Min. Draw Down Level (MDDL) :………Ft. : NA
Design Disch. through Machine : 24.36 m3/sec
Date of Commissioning:
Unit – 1 : 19-06-2008
Unit – 2 : 22-06-2008
Unit – 3 : 23-10-2009