Lower Periyar Hydro Electric Project
Lower Periyar Power House is the fourth biggest genrating station of Kerala and one of the most important tie stations in the power grid of Kerala. The installed capacity of th.. Read More
Achieving self-sufficiency in energy production by utilizing renewable energy opportunities.
Commissioned Poringalkuthu Left Bank additional extension Small Hydro Electric Project on 04.05.2022
2022Commissioned Upper Kallar Small Hydro Electric Project on 30.09.2021
2021Commissioned Chathankottunada Small Hydro Electric Project on 20.02.2021
2021First Floating Solar Project in Banasura Sagar commissioned in 31.03.2019
2019Commissioned of Kakkayam Small Hydro Electric Project on 16.07.2018
2018Commissioned Perunthenaruvi Small Hydro Electric Project on 02.07.2017
2017Commissioned of Vellathooval Small Hydro Electric Project on 15.06.2016
2016Barapole Small Hydro Electric Project commissioned on 29.02.2016
2016Commissioned Adyanpara Small Hydro Electric Project on 03.09.2015
2015First Ground Mounted Solar Power Plant at Kanjikode commissioned in 2015-08-20
2015Commissioned Chimmony Small Hydro Electric Project on 22.05.2015
2015Commissioned Vilangad Small Hydro Electric Project 31-10-2014
2014Commissioned Peechi Hydro Electric Project on 07.01.2013
2013Commissioned of Ranni-Perinad Hydro Electric Project on 16-02-2012
2012Commissioned Poozhithode Small Hydroelectric Project on 25.03.2006
2011Commissioned Lower Meenmutty Small Hydroelectric Project on 25.03.2006
2006Commissioned Malankara Small Hydro Electric Project 23.10.2005
2005Commissioned Urumi Small Hydro Electric Project on 01.09.2003
2003Chembukadavu I &II Small Hydro Electric Project Commissioned on 19.08.2003
2003Commissioned Malampuzha Small Hydro Electric Project on 26.11.2001
2001Kakkad Hydro Electric Project Commissioned in 23.07.1999
1999The Poringalkuthu Left Bank Extension (PLBE) commissioned in 20-03-1999
199901.03.1998 Commissioning of Mattupetty Power house
1998Lower Periyar Power House commissioned in 27-09-1997
1997Diesel Power Plant at Brahmapuram was commissioned on 06.05.1997
1997Kanchikode wind farm was commissioned on 18.05.1995
1995Idamalayar Hydro Electric Project commissioned in 03.02.1987
1987Idukki Power House commissioned in 12.02.1976
1976Kuttiady Hydro Electric Project, commissioned on 11.09.1972
1972Commissioning of Sholayar Powerhouse
1966Sabarigiri Hydro Electric Project (SHEP) is the second largest hydro electric project in Kerala.
1966Panniar project was commissioned on 29/12/1963
1963Neriamangalam Power Station was commissioned with two units (Unit 1 & 2) on 12.04.1961
19613rd power project commissioned in the state of Kerala in 1957
1957Sengulam Hydro Electric Project commissioned in the year 1954
1954On March 19, 1940, Sir C P Ramaswamy Iyer, The Dewan of Travancore inaugurated the first stage of the Pallivasal project
1940A Diesel Power Station was established in 1929
19292022-05-04
The Poringalkuthu Small Hydro-Electric Project (also called as Poringalkuthu Left Bank additional extension Hydro electric project) envisages the utilization of the spill water from the existing Peringalkuthu reservoir by the construction of the water-conducting system of 2 km length and a powerhouse with an installed capacity of 24 MW near to the existing Poringalkuthu Left Bank Extension powerhouse. The project is situated along the Chalakudy River basin in the Chalakudy Taluk of Thrissur District. The water conductor system of the project consists of an Intake Structure, Power tunnel, Surge shaft, Valve house, Pressure shaft and steel penstock leading to the machine of 24 MW capacity in the powerhouse. The power generated from this project is fed into the 110KV switchyard for power evacuation to the system grid. The annual generation target is 45.02MU.The PLBAE power project was officially inaugurated on May 04, 2022, by Sri K. Krishnankutty, the Honorable Minister for Electricity of Kerala. The powerhouse is equipped with a single vertical Francis turbine coupled with a 3-phase 24MW generator. The turbine and Generator were designed and manufactured by M/S Hunan Allonward Hydro Generating Co. Ltd, China. The power generated is transmitted to the Chalakudy 110kV grid substation through two 110kV feeders. The third feeder is connected to the Sholayar power station and the fourth feeder is connected to the Malayattoor 110KV substation.
Lower Periyar Power House is the fourth biggest genrating station of Kerala and one of the most important tie stations in the power grid of Kerala. The installed capacity of th.. Read More
During 1917 Investigation of power generation possibilities of chalakkudy river started by British Westing House Electrical Manufacturing company. In 1951 Preliminary report on economic power generation by diverting sholayar water.. Read More
Overview Peechi Small Hydro Electric Project is a dam toe project located in Panancherry village of Thrissur Taluk in Thrissur district in Kerala State. This project is constructed as a dam.. Read More