Generation - Objective

Achieving self-sufficiency in energy production by utilizing renewable energy opportunities.

Important Updates

Milestone

Poringalkuthu Left Bank additional extension Small Hydro Electric Project

Commissioned Poringalkuthu Left Bank additional extension Small Hydro Electric Project on 04.05.2022

2022

Upper Kallar Small Hydro Electric Project:

Commissioned Upper Kallar Small Hydro Electric Project on 30.09.2021

2021

Chathankottunada Small Hydro Electric Project

Commissioned  Chathankottunada Small Hydro Electric Project on   20.02.2021

2021

Commissioning of first Floating Solar Project in Banasura Sagar

First Floating Solar Project in Banasura Sagar commissioned in  31.03.2019

2019

Kakkayam Small Hydro Electric Project:

Commissioned of Kakkayam  Small Hydro Electric Project  on 16.07.2018

2018

Perunthenaruvi Small Hydro Electric Project

Commissioned Perunthenaruvi Small Hydro Electric Project on 02.07.2017

2017

Commissioned Vellathooval Small Hydro Electric Project

Commissioned of Vellathooval Small Hydro Electric Project on 15.06.2016

2016

Barapole Small Hydro Electric Project

Barapole Small Hydro Electric Project commissioned on 29.02.2016

2016

Adyanpara Small Hydro Electric Project

Commissioned  Adyanpara Small Hydro Electric Project on  03.09.2015

2015

Commissioning of first Ground Mounted Solar Power Plant at Kanjikode

First Ground Mounted Solar Power Plant at Kanjikode commissioned in 2015-08-20

2015

Chimmony Small Hydro Electric Project:

Commissioned Chimmony Small Hydro Electric Project  on 22.05.2015

2015

Vilangad Small Hydro Electric Project

Commissioned  Vilangad Small Hydro Electric Project 31-10-2014

2014

Peechi Hydro Electric Project:

Commissioned Peechi Hydro Electric Project on 07.01.2013

2013

Ranni-Perinad Hydro Electric Project

Commissioned of Ranni-Perinad Hydro Electric Project on 16-02-2012

2012

Poozhithode Small Hydroelectric Project

Commissioned  Poozhithode Small Hydroelectric Project on  25.03.2006

2011

Lower Meenmutty Small Hydroelectric Project:

Commissioned  Lower Meenmutty Small Hydroelectric Project on 25.03.2006

2006

Malankara Small Hydro Electric Project

Commissioned  Malankara Small Hydro Electric Project 23.10.2005

2005

Urumi Small Hydro Electric Project:

Commissioned Urumi Small Hydro Electric Project on 01.09.2003

2003

Chembukadavu I &II Small Hydro Electric Project

Chembukadavu I &II Small Hydro Electric Project Commissioned on 19.08.2003

2003

Malampuzha Small Hydro Electric Project:

Commissioned Malampuzha Small Hydro Electric Project on 26.11.2001

2001

Commissioning of Kakkad Hydro Electric Project

Kakkad Hydro Electric Project Commissioned in 23.07.1999

1999

Commissioning of The Poringalkuthu Left Bank Extension (PLBE)

The Poringalkuthu Left Bank Extension (PLBE) commissioned in 20-03-1999

1999

Commissioning of Mattupetty Power house

01.03.1998 Commissioning of Mattupetty Power house

1998

Commissioning of Lower Periyar Power House

 Lower Periyar Power House commissioned in 27-09-1997

1997

Commissioning of Diesel Power Plant at Brahmapuram

Diesel Power Plant at Brahmapuram was commissioned on 06.05.1997

1997

Commissioning of WIND FARM - KANJIKODE

Kanchikode wind farm was commissioned on 18.05.1995      

1995

Commissioning of Idamalayar Hydro Electric Project

 Idamalayar Hydro Electric Project commissioned in  03.02.1987   

1987

Commissioning of Idukki Power House

 Idukki Power House commissioned in  12.02.1976

1976

Kuttiyadi Hydro Electric project, kakkayam

Kuttiady Hydro Electric Project, commissioned on 11.09.1972

1972

Commissioning of Sholayar Powerhouse

Commissioning of Sholayar Powerhouse

1966

Sabarigiri Hydro Electric Project (SHEP)

Sabarigiri Hydro Electric Project (SHEP)  is the second largest hydro electric project in Kerala.

1966

Commissioned Panniyar Power Project

Panniar project was commissioned on 29/12/1963

1963

Commissioned Neriamangalam Power Station

Neriamangalam Power Station was commissioned with two units (Unit 1 & 2) on 12.04.1961  

1961

Commissioning of Poringalkuthu Left Bank Project (PLB)

3rd power project commissioned in the state of Kerala in 1957

1957

Commissioned the Second Hydro Electric Project (Sengulam Hydro Electric Project) in Kerala

Sengulam Hydro Electric Project commissioned in the year 1954

1954

Commissioned the First Hydro Electric Project (first stage of the Pallivasal project) in Kerala

On March 19, 1940, Sir C P Ramaswamy Iyer, The Dewan of Travancore inaugurated the first stage of the Pallivasal project

1940

First Diesel Power Station for commercial production

A Diesel Power Station was established in 1929

1929

Poringalkuthu Left Bank additional extension Small Hydro Electric Project

2022-05-04

Milestone

  The  Poringalkuthu Small Hydro-Electric Project (also called as Poringalkuthu Left Bank additional extension Hydro electric project) envisages the utilization of the spill water from the existing Peringalkuthu reservoir by the construction of the water-conducting system of 2 km length and a powerhouse with an installed capacity of 24 MW near to the existing Poringalkuthu Left Bank Extension powerhouse.  The project is situated along the Chalakudy River basin in the Chalakudy Taluk of Thrissur District. The water conductor system of the project consists of an Intake Structure, Power tunnel, Surge shaft, Valve house, Pressure shaft and steel penstock leading to the machine of 24 MW capacity in the powerhouse. The power generated from this project is fed into the 110KV switchyard for power evacuation to the system grid. The annual generation target is 45.02MU.The PLBAE power project was officially inaugurated on May 04, 2022, by Sri K. Krishnankutty, the Honorable Minister for Electricity of Kerala. The powerhouse is equipped with a single vertical Francis turbine coupled with a 3-phase 24MW generator. The turbine and Generator were designed and manufactured by M/S Hunan Allonward Hydro Generating Co. Ltd, China. The power generated is transmitted to the Chalakudy 110kV grid substation through two 110kV feeders. The third feeder is connected to the Sholayar power station and the fourth feeder is connected to the Malayattoor 110KV substation.  

Featured Articles

Lower Periyar Hydro Electric Project

Lower Periyar Power House is the fourth biggest genrating station of Kerala and one of the most important tie stations in the power grid of Kerala.  The installed capacity of th.. Read More

Sholayar Hydro Electric Project

During 1917 Investigation of power generation possibilities of chalakkudy river started by British Westing House Electrical Manufacturing company. In 1951 Preliminary report on economic power generation by diverting sholayar water.. Read More

Peechi Small Hydro Electric Project

Overview Peechi Small Hydro Electric Project is a dam toe project located in Panancherry village of Thrissur Taluk in Thrissur district in Kerala State. This project is constructed as a dam.. Read More

Rating