|  Visit Old Website

Other Charges

 

Other charges
Transmission Charges For STOA and Open Access by
embedded Consumers from RE sources
Within the state -Rs./Unit
0.47
For LTA and MTOA Rs./MW/day 10565.00
Wheeling Charges Rs./Unit 0.62
SLDC charges Rs./MW/day 101.00
Cross Subsidy Charges EHT- Industrial (66kV) 1.39
EHT- Industrial (110kV) 1.32
EHT- Industrial (220kV) 1.35
EHT-Gen.A 1.33
EHT-Gen.B 1.87
EHT-Gen.C 2.06
Railways 1.37
KMRL 1.38
HT-I(A)-Industry 1.56
HT-I(B)-Industry 1.67
HT-II(A) 1.63
HT-II(B) 1.89
HT-III(A) 1.31
HT-III(B) 0.48
HT-IV(A) 2.05
HT-IV(B) 2.16
HT-V 1.68
HT-VI 1.34
Meter Rent to be levied from the Consumers
Single Phase static energy meters with LCD and ToD Facility and with ISI certification- (Rs./meter/month) 6
Three Phase static energy meters with LCD and ToD Facility and with ISI certification. (Rs./meter/month) 15
LT CT operated Three Phase four wire static energy meters (Class 0.5 accuracy) with LCD and ToD Facility and with ISI certification (Rs./meter/month) 30
Three Phase AC static tri-vector energy meters with ABT, ToD Facility and compliant to Device Language Message Specification (DLMS) protocol. (Rs./meter/month) 1000
Meter Rent for Renewable Energy Meters
Net Meter -Single Phase 5-30A Class 1.0 (Rs./meter/month) 30
Net Meter -Three Phase 10-60A Class 1.0 (Rs./meter/month) 35
Net Meter -LTCT meter, Class 0.5S,-/5A (Rs./meter/month) 70
Net Meter -CTPT Operated HTmeter, Class 0.2S (Rs./meter/month) 435
Renewable Energy Meter-Single Phase 2 wire -5-30A ,static LCD meters with ToD Facility (Rs./meter/month) 10
Renewable Energy Meter-Three Phase 10-60A ,static LCD meters with ToD Facility (Rs./meter/month) 20
Renewable Energy Meter-LTCT Meters DLMS Class 0.5 S-/5A (Rs./meter/month) 25
Renewable Energy Meter -Three Phase 4 wire CT-PT operated, HT, static energy meters (Class 0.2S accuracy) +GPRS Modem (Rs./meter/month) 200
Renewable Energy Meter -Three Phase 4 wire CT-PT operated, EHT, static energy meters (Class 0.2S accuracy) +GPRS Modem (Rs./meter/month) 200
Green Tariff
The consumers voluntarily opting for the purchase of RE power from distribution licensees shall pay green tariff over and above the normal demand charges/fixed charge and energy charge of the respective tariff category in which the consumer belongs (Rs./unit) over the normal tariff 0.77

 

Rating

Please rate us and give your valuable feedback if you are satisfied with this KSEBL website service.