Other charges | ||||||||||
Up to 05.12.2024 | from 05.12.2024 to 31.03.2027 |
|||||||||
Transmission Charges | For STOA and Open Access by embedded Consumers from RE sources Within the state -Rs./Unit |
0.47 |
Wheeling Charges Rs./Unit |
0.62 | 0.48 |
Wheeling Charges Rs./Unit |
0.64 | |||
For LTA and MTOA Rs./MW/day | 10565 | 10925 | ||||||||
SLDC charges Rs./MW/day | 101 | 104 | ||||||||
from 05.12.2024 to 31.03.2027 |
||||||||||
Cross Subsidy Charges |
EHT- Industrial (66kV) | 1.41 | HT-I(A)-Industry | 1.58 | ||||||
EHT- Industrial (110kV) | 1.34 | HT-I(B)-Industry | 1.71 | |||||||
EHT- Industrial (220kV) | 1.36 | HT-II(A) | 1.65 | |||||||
EHT-Gen.A | 1.36 | HT-II(B) | 1.92 | |||||||
EHT-Gen.B | 1.89 | HT-III(A) | 1.25 | |||||||
EHT-Gen.C | 2.08 | HT-III(B) | 0.53 | |||||||
Railways | 1.4 | HT-IV(A) | 2.08 | |||||||
HT-IV(B) | 2.17 | |||||||||
KMRL | 1.4 | HT-V | 1.68 | |||||||
HT-VI | 1.38 | |||||||||
Defence Installations | 1.32 | |||||||||
Meter Rent to be levied from the Consumers | from 05.12.2024 to 31.03.2027 |
|||||||||
Single Phase static energy meters with LCD and ToD Facility and with ISI certification- (Rs./meter/month) | 6 | 6 | ||||||||
Three Phase static energy meters with LCD and ToD Facility and with ISI certification. (Rs./meter/month) | 15 | 15 | ||||||||
LT CT operated Three Phase four wire static energy meters (Class 0.5 accuracy) with LCD and ToD Facility and with ISI certification (Rs./meter/month) | 30 | 30 | ||||||||
Three Phase AC static tri-vector energy meters with ABT, ToD Facility and compliant to Device Language Message Specification (DLMS) protocol. (Rs./meter/month) | 1000 | 1000 | ||||||||
Meter Rent for Renewable Energy Meters | from 05.12.2024 to 31.03.2027 |
|||||||||
Net Meter -Single Phase 5-30A Class 1.0 (Rs./meter/month) | 30 | 30 | ||||||||
Net Meter -Three Phase 10-60A Class 1.0 (Rs./meter/month) | 35 | 35 | ||||||||
Net Meter -LTCT meter, Class 0.5S,-/5A (Rs./meter/month) | 70 | 70 | ||||||||
Net Meter -CTPT Operated HTmeter, Class 0.2S (Rs./meter/month) | 435 | 435 | ||||||||
Renewable Energy Meter-Single Phase 2 wire -5-30A ,static LCD meters with ToD Facility (Rs./meter/month) | 10 | 10 | ||||||||
Renewable Energy Meter-Three Phase 10-60A ,static LCD meters with ToD Facility (Rs./meter/month) | 20 | 20 | ||||||||
Renewable Energy Meter-LTCT Meters DLMS Class 0.5 S-/5A (Rs./meter/month) | 25 | 25 | ||||||||
Renewable Energy Meter -Three Phase 4 wire CT-PT operated, HT, static energy meters (Class 0.2S accuracy) +GPRS Modem (Rs./meter/month) | 200 | 200 | ||||||||
Renewable Energy Meter -Three Phase 4 wire CT-PT operated,EHT, static energy meters (Class 0.2S accuracy) +GPRS Modem (Rs./meter/month) | 200 | 200 | ||||||||
Green Tariff | ||||||||||
The consumers voluntarily opting for the purchase of RE power from distribution licensees shall pay green tariff over and above the normal demand charges/fixed charge and energy charge of the respective tariff category in which the consumer belongs to (Rs./unit) over the normal tariff | 0.77 | 0.77 |