|  Visit Old Website

9496001912
IVR | | | SMS

9496010101
Emergency/Accidents

0471-2555544
Landline

1912
Toll free number

The Facts
Newsletter

Apply for LT connection

Power Voice Youtube Channel

Green Channel for HT/EHT

Electricity Bill Calculator

Register Mobile/E-mail for alerts

View Power System Statistics

Thanal - Pension Portal

Apply for Internship

Register for Centralized Billing

Project Tracker

E-Kiran

Pay HT/EHT Bills

VIEW YOUR LT BILL

Newsletter - The Facts

Important Forms

Power House Visit

FUNCTIONAL UNITS

FEATURED DOWNLOADS

  • Applications are invited by Center for Management Development(CMD) from qualified and experienced candidates for appointment on contract basis for a 24x7 Centralized Call Centre 1 File

    NO:CRA/01/2024 | Date: 2024-10-23

  • Ad Hoc Select List of Officers in the Electrical Wing for the year 2024 -Approved 1 File

    KSEBL/SEC/ESTT/S15/2024- S3 | Date: 2024-10-05

  • Transfer and posting of Executive Engineers(Ele) Grievance Redressal 1 File

    B.O. (FTD) No.422/2024 (Est.IIT&P/EE (Ele)2024) | Date: 2024-10-05

  • Transfer and posting of Executive Engineers(Ele) 1 File

    ESTT IIIOLGTH-2024/T&P/EE-Ele | Date: 2024-09-13

  • Public hearing on tariff revision 1 File

    KSEBL/TRAC /G/Tariff Revision / 2024-25/656 | Date: 2024-09-07

  • Tariff revision proposal for the FY 2024-25 to FY 2026-27 1 File

    1 | Date: 2024-08-02

  • Power Availability Report 1 File

    1 | Date: 2024-05-31

  • Actions taken to cope with heavy fall in power demand due to unexpected rains in May 1 File

    Vol II Issue 9 | Date: 2024-05-25

  • Annual Administration Report 7 Files

    Annual Administration Report | Date: 2024-05-25

  • Negative propaganda on media regarding KSEBL EV Charging Station 1 File

    Volume II - Issue 3 | Date: 2024-03-25

  • Selected List - Customer Relation Assistant at CCC 3 Files

    Selection list/OCRA | Date: 2024-03-23

  • Distribution Cost Data 4 Files

    Cost data | Date: 2024-02-08

  • Operation and Maintenance Manual for KULAMAVU SADDLE DAMS 1 File

    O&M - 24 | Date: 2024-01-30

  • Operation and Maintenance Manual for VELLATHOOVAL DIVERSION WEIR 1 File

    O&M - 23 | Date: 2024-01-30

  • Operation and Maintenance Manual for KUTTIYAR DIVERSION WEIR 1 File

    O&M - 25 | Date: 2024-01-27

LATEST TENDERS

05/EDH/2024-25/20.11.2024

Supplying Jeep /Equivalent vehicle (below 15 years old, 1500 CC or above) with driver for the use of Electrical Section,Arattupuzha for a period of Nine months

Date: 2024-11-20

Normal Tender Vehicle Hiring Tender
PAC below 5 Lakhs

KSEB/SCM/eP- 61/2024-25 dated 20/ 11/2024

Supply of 5MVA,33kV/11kV 3Phase Transformer-8 nos (6 nos under Normal scheme & 2 nos under RKI scheme)

Date: 2024-11-20

E-Tender Supply Tender
PAC between 5 Crores and 50 Crores

42/24-25/EE/PMU/KSD dtd 20-11-2024

LAYING 11KV UG CABLE BETWEEN ANGAKALARI TO KOTTIKULAM UNDER ELECTRICAL SECTION, UDMA

Date: 2024-11-20

E-Tender Work Tender
PAC between 5 Lakhs and 50 Lakhs

PRESS RELEASE

FEATURED ARTICLES

What is fuel surcharge ?

Central Electricity Act, 2003, Section 62(4), provides for levying fuel surcharge on variations in electricity prices due to fluctuations in fuel prices. The National Tariff Policy stipulates that the uncontrollable..

What is Additional Cash Deposit (ACD)?

According to Section IV, Clause 67 of the Kerala Electricity Supply Code 2014, rules for maintaining  Security Deposit for electricity charges and meter are described as follows: Clause 67. Security..

Pay your electricity bills using Consumer number as Account number

KSEBL has introduced a new payment system where low tension electricity consumers can pay their electricity bill using their 13-digit consumer number as a virtual account number. This system has..

MILESTONES

Commissioning of Tottiyar Hydro Electric Project.

The 40 MW Tottiyar Hydroelectric Project was inaugurated on October 28, 2024, at the Lower Periyar Hydroelectric Project Courtyard by Honorable Chief Minister Mr. Pinarayi Vijayan, who dedicated it to the nation. The project utilizes water from the Deviyar, a tributary of the Periyar River. It consists of two electric generators with capacities of 30 MW and 10 MW, respectively. The plant is expected to generate 99 million units of electricity annually.

The power source for this project is a dam constructed across the Deviyar at Walara, along with an associated reservoir. The dam, which is 222 meters long and 7.5 meters high, stores water that flows through a 60-meter-long canal and then through a 199-meter-long tunnel to reach a 1,252-meter-long penstock. Water rushing through the penstock from a height of 474.3 meters drives the vertical shaft Pelton turbines located in the powerhouse.

The Thottiyar Powerhouse is situated on the banks of the Periyar River in Mannakandam village, within the Devikulam taluk of Neendapara. The construction is designed so that the water, after generating electricity, is discharged back into the Periyar River. The total construction cost of the Tottiyar project is Rs 188 crores. The electricity generated from the two generators at Tottiyar is at a voltage of 11 kV, which is then transformed to 220 kV before being transmitted to the switchyard and subsequently to the Lower Periyar-Chalakkudy 220 kV line.

2024

Commissioning of Peruvannamoozhi Small Hydropower Project

The Peruvannamoozhi Small Hydropower Project was presented to the nation by Hon. Chief Minister Mr. Pinarayi Vijayan on February 26, 2024. This project, with a capacity of 6 MW, has been constructed in the Chakkittapara and Chempanoda villages of Koyilandi taluk in the Kozhikode district. The objective of the project is to generate 24.70 million units of electricity per year by utilizing the excess water from the Peruvannamoozhi reservoir of the Kuttyadi Irrigation Project, following the fulfillment of irrigation and drinking water needs. The Peruvannamoozhi project, which was constructed with an investment of Rs 81.47 crore, is also the 10th small hydropower project in the Kozhikode district.

2024

Implementation of Cloud Telephony Services

Revolutionizing Customer Service with Cloud Telephony at KSEBL.

2023

Setting up of RE Data Centre


For Monitoring and Scheduling of Renewable Energy in the State KSEBL established a Renewable Energy Data Centre at CE (REES) Office. It was established on 03.08.2021.The Project cost is Rupees Seventy Lakhs only.

2021

Introduction of Service At Doorsteps

As part of improving the ease of life and customer service,KSEBL has introduced a flagship project ““Services at doorsteps” as a pilot project under Electrical Circle, Palakkad from 01.10.2020 onwards.

2021

Commissioning of first Floating Solar Project in Banasura Sagar

The first Floating Solar Project was commissioned in Banasurasagar on 31.03.2019 which has a capacity of 500 KWp.

2019

Kerala becomes India's first state to have 100% households, electrified.

Kerala became India's first 100% households electrified state, with Chief Minister Pinarayi Vijayan declaring the state as 100% electrified on 29th day of may in 2017.

2017

Commissioning of first Ground Mounted Solar Power Plant at Kanjikode

The first Ground Mounted Solar Power Plant of KSEBL was commissioned on 20.08.2015 at Kanjikkode. It has a capacity of 1MWp.

2015

Formation of Centralised Customer Care and attached 24x7 Call Center

A Centralised Customer Care Centre (CCC) with an attached Call Centre was established under RAPDRP scheme Part A, started functioning at Vydyuthi Bhavanam, Pattom with a single BSNL PRI line.

2014

Formation of KSEB Limited:

The Kerala State Electricity Board Limited is the successor entity of Kerala State Electricity Board. As per section 172 (a) of the Electricity Act 2003 and as mutually decided by the Government of India and Government of Kerala, KSEB had continued as Transmission utility and Distribution licensee till 24-09-2008.

2013

Formation of Model sections:

In order to transform KSEB into a customer-oriented organization and to facilitate a face-lift in the operation of Electrical Section offices, KSEB decided to implement 75 model sections, one in each Electrical Division with effect from 01.06.2009.

2009

Formation of Transmission and Distribution Coordination Committee

To minimize the supply interruption, effective utilization of transmission capacity (lines as well as substation), system improvement and to ensure proper cooperation between the Distribution and Transmission wings, the Board has constituted a Circle level Coordination Committee of Transmission and Distribution wings vide B.O.(FM)No.869/2008(DPCIII/T&DCC/2008-09) dtd 05.04.2008.

2008

Implementation of new LT billing software - ORUMA

Computerisation Unit has successfully completed the development of new application software for LT billing based on open-source technology.

2008

Formation of Consumer Grievance Redressal Forums (CGRF)

The Kerala State Electricity Board Ltd constituted as per BO dated 16.03.2006 -  Consumer Grievance Redressal Forums(CGRFs) for each region namely - Southern, Central & Northern.

2006

Formation of Transformer Field Repair Unit

Kerala State Electricity Board Ltd formed a district-wise Transformer Field Repair unit on 28.10.2005.

2005

View More

Commissioning of Tottiyar Hydro Electric Project.

2024-10-28

Milestone

The 40 MW Tottiyar Hydroelectric Project was inaugurated on October 28, 2024, at the Lower Periyar Hydroelectric Project Courtyard by Honorable Chief Minister Mr. Pinarayi Vijayan, who dedicated it to the nation. The project utilizes water from the Deviyar, a tributary of the Periyar River. It consists of two electric generators with capacities of 30 MW and 10 MW, respectively. The plant is expected to generate 99 million units of electricity annually.

The power source for this project is a dam constructed across the Deviyar at Walara, along with an associated reservoir. The dam, which is 222 meters long and 7.5 meters high, stores water that flows through a 60-meter-long canal and then through a 199-meter-long tunnel to reach a 1,252-meter-long penstock. Water rushing through the penstock from a height of 474.3 meters drives the vertical shaft Pelton turbines located in the powerhouse.

The Thottiyar Powerhouse is situated on the banks of the Periyar River in Mannakandam village, within the Devikulam taluk of Neendapara. The construction is designed so that the water, after generating electricity, is discharged back into the Periyar River. The total construction cost of the Tottiyar project is Rs 188 crores. The electricity generated from the two generators at Tottiyar is at a voltage of 11 kV, which is then transformed to 220 kV before being transmitted to the switchyard and subsequently to the Lower Periyar-Chalakkudy 220 kV line.

Poll

Rate the Online services provided by KSEBL


Which Online Service do you find the most satisfying?


Rating

Please rate us and give your valuable feedback if you are satisfied with this KSEBL website service.