Board Orders
262/2021(DGC/AEE-II/DRIP/KAS/2016)
Dam Rehabilitation and Improvement Project (DRIP) - Improvement of basic facilities under Kuttiady Augmentation Scheme (Part II)
Date: 2021-04-22261/2021(D(GE)/G2/RMU-KTDY/2021-22)
Renovation, Modernisation & Up rating works of the existing Kuttiyadi (3x25 MW) Hydro electric Project - Formation of Technical Committee - Sanctioned
Date: 2021-04-22260/2021 (DGE/G3/General-Transformer oil/2021-22)
Supply of 85.89 KL Transformer oil for the use at Generating stations under Generation Circle Thrissur, Moolamattom, Meencut, Moozhiyar & Kothamangalam
Date: 2021-04-21259/2021(DGC/AEE-II/DRIP/IDK/2015)
Dam Rehabilitation and Improvement Project (DRIP) - Idukki Hydro Electric Project-Rehabilitation including remedial measures and basic facilities
Date: 2021-04-21257/2021(DGC/AEE-II/Dam Safety/2019)
Idukki HEP - Permission to JIO Digital Fiber Pvt Ltd for laying Optical Fiber Cable(OFC) at KSEBL road at Kulamavu - Sanctioned- Orders issued
Date: 2021-04-21254/2021 (EStt.VIII/1216/2021)
National Pension System - Settlement of Terminal Claims and withdrawal of Pension Wealth-Recovery of Liabilities - Government Order regarding guidelines
Date: 2021-04-21258/2021(PR/MC-5/695/2021)
Department of Public Relations - It is an offense for Government servants to solicit money or gratuity from members
Date: 2021-04-21256/2021/(IT/CU/Data Share- Phd/2020-21)
Request for KSEBL data for research purpose from Smt. Jyotsna P, Research scholar - Sanctioned -Orders issued
Date: 2021-04-21255 /2021 (D(GE)/G2/CHKN/2021-22)
Chathankottunada-II SHEP(3 x 2 MW) - Operating & Maintenance staff - Sanctioned - Orders issued
Date: 2021-04-21253/ 2021(D(D,IT&HRM) /D-2/ SOP/ 0001/ 2021-22)
LT service connection to Covid Block of Government District Hospital Aluva- waiving of Security Deposit - Sanction Accorded
Date: 2021-04-17252/2021 (DGC/AEEV/PES/LA/2014)
Construction of an 8-metre wide road through the properties in Sy No. 63/part and 843 to National Academy of Customs
Date: 2021-04-16251/2021 (Fin.2(B)/KGB-OD/2021-22)
Availing Overdraft facility of ₹195Crore from M/s Kerala Gramin Bank - Sanctioned - Orders issued
Date: 2021-04-15250/2021 (Estt.V/CPRCS/2021)
Procurement of commonly used Hardware items such as Desktops, Laptops, Printers, Scanners, Photocopiers, UPS etc through one line portal CPRCS
Date: 2021-04-13249/2021/ REES/ SOLAR/1MW/2020-21
Payment for the extended period of Operation and maintenance of 1MWp Solar PV plant installed at Kanjikkode - sanctioned
Date: 2021-04-13248 /2021 (DGE/G1/Audit/CoPU 91st /2021-22)
Committee on Public Undertakings (2019-21)- 91st Report - Recommendation on para 7 (C& AG Report on 31.03.2013) -Neriamangalam Extension Scheme
Date: 2021-04-12247/2021(DGE/G1/Sabarigiri/Unit 4/2021-22)
Sabarigiri HEP-Report on the vibration analysis of Unit No.4 machine - Constitution of the Committee to conduct detailed enquiry-nomination of new member -ratified
Date: 2021-04-12246/2021(D(D&IT)/D5/PG/2021-22/0001)
Proposal for the re-organization of SCADA Control Room, SCADA Maintenance Team, RMU Maintenance Team and UG Cable Wing- sanctioned - orders issued
Date: 2021-04-08245/2021 (CSC/AEE2/FTD /2020-21)
Minimizing Regulatory Compliance Burden on Industry/Business- Increasing the Periodicity of Inspection to 2 years for HT & EHT Consumers
Date: 2021-04-07244/2021 (CSC/AEE2/FTD /2020-21)
Minimizing Regulatory Compliance Burden on Industry/Business- Designated Person for operation of Electrical Apparatus -Relaxation up to 1 MVA-Ratified
Date: 2021-04-07243/2021 (CE(C&P)/ Solar-SECI/2020-21)
Procurement of Solar Power under ISTS connected Solar tender (Tranche IX) of SECI -ratification orders issued
Date: 2021-04-05242/2021 (No. DGE/G3/LP-Retaining wall/2020-21)
Lower Periyar HEP - Construction of retaining wall along the river side/tail race side of the Power station-entrusting the work to Civil wing - Sanction accorded
Date: 2021-04-03231/2021 (D(D&IT)/D6-AE3/Breakdown Wing/2020-21)
Long Term Settlement 2021- Spread Over Allowance for Workmen in Breakdown Wing – Clarification - Sanctioned - Orders issued
Date: 2021-03-31235/2021(No.IT/CU/EoDB-Solar/2020-21)
Minimizing regulatory compliance burden of Business and citizen - Roof Top Solar- Automating feasibility application-Sanctioned
Date: 2021-03-31230 / 2021 (CE(REES)/AEE8/West Kallada/2020-2021)
West Kallada Floating Solar Power Plant - Streamlining the shareholding of M/s WKNCEPPL and related company regularisation works-Payment
Date: 2021-03-31241 /2021/ CE(REES)/Projects/AE-2/ SPV-Allimooppan/10kWP/off-grid/2020-21/1652)
Installation of 10kWp Off-Grid DDG Solar PV plant at Allimooppan colony-Refund of deposit amount - Orders issued
Date: 2021-03-31233/2021 (SCM/XH-AEE3/eP.44/2020-21/11kv Pin)
Supply of 73,239 sets of 11kV, 5kN Composite Polymeric Pin Insulators with pin set by M/s.Rajeev Industries - Extension of Delivery Schedule sanctioned
Date: 2021-03-31239/2021(D(T&SO)/T7/CUG/2020-21)
Providing Fiber to the Home (FTTH) connection in place of Broad Band connection at various offices in KSEB Ltd - Sanctioned
Date: 2021-03-31240 /2021 (DGC/AEE VI/Galv/2014)
Hot dip galvanization of 6500MT "A" Poles of various length fabricated at the Mechanical Facilities of KSEB Ltd. for the year 2020-21 - re-e-tender invited
Date: 2021-03-31237/2021 (D (D, IT&HRM)/D-1/General/2017-18/0017)
Modification work of Electrical Distribution Network around Sree Padmanabha Swamy Temple (SPST) under 'Swadeshi Darshan Scheme' on Turn Key basis
Date: 2021-03-31238 /2021(D(T&SO)/T7/SR/2020-21)
Cutting and removal of trees standing in the proposed area for the construction of new feeder bays at 66kV Substation Adoor under Transmission Division Pathanamthitta
Date: 2021-03-31236/2021(D (D, IT&HRM)/D-1/ KWA/2020-21/0002)
Request from HT consumer LCN2/3222 (KWA Punalur) with pending arrears, for load enhancement- sanctioned - Orders issued
Date: 2021-03-31234/2021(KSEB/TRAC/R2/Cost Data/2020-21)
Preparation of proposal for service connection charges according to the notification of Ministry of Power on "The Electricity (Rights of Consumers) Rules, 2020"
Date: 2021-03-31232/2021/D(T&SO)/T7/Veh/2020-21
Hiring of Tempo Traveler or equivalent vehicle with driver and fuel for the use of Line Maintenance Section, Malappuram for ten months - Excess rate -Sanctioned
Date: 2021-03-31229/2021/D(T&SO)/T7/SR/2020-21)
Cutting and removing of trees standing in the proposed area for the construction of 3MW Grid Tied Ground Mounted Solar PV Power Plant at 220 kV Substation Palakkad
Date: 2021-03-31226 /2021(KSEBL/TRAC/CG/JPL case/2020-21
Payment of Advocate fee in the Petitions filed by KSEBL - Sanction accorded - Orders issued
Date: 2021-03-29227/2021 (PC/SCM/PSC Poles/2017-18/Additional (PO))
Manufacture and Supply of 8m & 9m PSC Poles to various Electrical Circles - Additional Purchase Order placed - Time Extension - Sanctioned
Date: 2021-03-29224/2021(D(T&SO)/T7/SR/2020-21)
Cutting and removal of 36 nos. trees standing in the proposed site for 220/110kV GIS Substation, Pathanamthitta - Tender cum Auction confirmation
Date: 2021-03-27223/2021 CE (REES)/Re Projects/Vendor-PCU/2020-21/1656)
Empanelment Original Equipment Manufacturer (OEM) of Solar Inverter having capacity up to 30 kVA- ordes issued
Date: 2021-03-27222/2021 (CE (REES)/RE Projects/2020-21/1629)
Grid connected solar power plant - Wheeling & adjustment of excess energy from a solar panel installed premise to another solar panel installed premise
Date: 2021-03-27225/2021 (PSI /498/Pension Revision/2021)
Revision of Pension and allied benefits of the Pensioners /Family Pensioners /PTC Pensioners/Ex-gratia Pensioners of the Kerala State Electricity Board Ltd - Sanctioned
Date: 2021-03-27