Board Orders
491/2023(SOR-SA31/2023/1014)/48
Settlement of current charge arrears of M/s. Saroj Steel Re Rolling Mill (LCN.No.26/2628) under OTS Scheme 2023
Date: 2023-11-16490/2023(SOR-SA31/2023/1007)/51
Settlement of current charge arrears of M/s. Kanprint Offset printers (LCN.No.13/8128) under OTS Scheme 2023
Date: 2023-11-16488/2023(SOR-SA31/2023/990)/49
Settlement of current charge arrears of M/s. Chidambaram Tea Estate, Peermade (Marikkar Plantations Pvt. Ltd.) (LCN.No.16/1607) under OTS Scheme
Date: 2023-11-16494/2023(DGC/AEEV/PES-Balance works/2018)
Pallivasal Extension Scheme (2X30 MW) - Balance Civil Works of Tunnel, Surge Shaft, Pressure Shaft, Penstock
Date: 2023-11-16486/2023(DIRGE-AEE4/2022/705)
Erection of supplied Electro Hydro Mechanical equipment in Powerhouse of Thottiyar 40(1x10+1x30) MW HEP – Request for time extension to M/s. Fitwell Constructions
Date: 2023-11-15487/2023(DGE/G3/Enhancing Km limit GSD Malampuzha)
Enhancing monthly ceiling of vehicle attached to Generation Sub Division & Hiring of vehicle for the use at Generation Sub Division, Malampuzha
Date: 2023-11-15484/2023(DGC/AEE-VI/BRPL/2014)
Barapole SHEP - Rectificaiton work of power canal of Barapole SHEP - Conducting Geophysical Investigation study through M/s PARSAN Overseas Pvt. Ltd., New Delhi
Date: 2023-11-14482/2023 (TRAC-AEE1/2023/186)
KSERC Interim order in the matter of schedule of tariff and terms and conditions for retail supply of electricity by KSEBL and all other Licensees with effect from 01.11.2023 to 30.06.2024
Date: 2023-11-13481/2023(SOR-SA31/2023/1001)
Settlement of current charge arrears of M/s.Kaypee Metals & Alloys (P) Ltd (LCN.No.6/3209) under OTS Scheme 2023
Date: 2023-11-13476/2023(SOR-SA28/2023/1000)
Settlement of current charge arrears of M/s Ponmudi Paper Mills Ltd, Chalakkuzhy Building, Peroorkada, Thiruvananthapuram (LCN 15/1953) under OTS Scheme 2023
Date: 2023-11-13477/2023(SOR-SA28/2023/988)
Settlement of current charge arrears of M/s Gopika Dairy Farm(LCN 19/3577) under OTS Scheme 2023
Date: 2023-11-13480/2023(SOR/SA-28/2023/986)
Settlement of current charge arrears of M/s Two in One Storage Extrusions, 2/286D Okkal, Perumbavoor, (LCN 15/7301) under OTS Scheme 2023
Date: 2023-11-13473/2023(SEC-ES-ST2/2023/476)
Establishment - Compassionate Employment Scheme - Appointment of dependents of KSEBL employees who die-in-harness - Select List for 07/2023 - Approved
Date: 2023-11-10472/2023(CEREES-AEE4/2023/1772)
Appointment of EPC contractor for design as per site conditions, erection, testing & commissioning of Grid Tied Ground Mounted Solar PV Power plants at Brahmapuram, Kanjikode and Agali
Date: 2023-11-09471/2023(DGC/AEE IV/Dam Safety/Desiltation/2023)
Desiltation of Reservoirs of KSEBL - Standard Operating procedure for the reservoirs of KSEBL- Modified in line with the SOP published by Government of Kerala
Date: 2023-11-08468/2023(SCM/XT/AEE1/123/2022-23/Fdr & Tfr C&R Panels)
Bid for the supply of 33 kV Feeder and 33/11 kV Transformer Control & Relay Panels
Date: 2023-11-04467/2023(Fin2(B)/SBI/e- Trade facility/2023-24)
E-Trade facility for opening LCs/ BGs on-line – Resolution – Sanctioned – Orders issued
Date: 2023-11-01465/2023(CW/GNL/2023)
Guideline in KSEBL to ensure strict adherence to Green Building Protocol - Granting in principle approval
Date: 2023-10-30462/2023(No.DGC/AEEIII/O&P/2014)
Implementation of Olikkal SHEP (5MW/10.26Mu) - Existing road from Punnakkal to Olikkal -Complaint of local people for repairing the damaged road
Date: 2023-10-25461/2023(DIRGE-AEE4/2022/936)
Supply of one set of 11kV Isolated Phase Bus Duct (IPBD) and one set of 11kV Segregated Phase Bus Duct (SPBD) for 40 (1x10+1x30) MW Thottiyar Hydro Electric Project
Date: 2023-10-25460/2023(DIRGE/G2/THEP-UCL/2023)
Supply, Laying, Testing and Commissioning of 220kV, 800 sq.mm XLPE, Under Ground cable for power evacuation
Date: 2023-10-25459/2023(DIRGE-AEE4/2022/479)
Execution of RMU works of Kuttiyadi (3x25MW) HEP awarded to M/s. BHEL - Request for Time Extension for the period of contract
Date: 2023-10-21456/2023(DIRGE-AEE4/2022/PED/P.MUZHY)
E &M works of Peruvannamuzhi SHEP (2x3 MW) - Request for Time Extension of the contract up to 30.08.2023
Date: 2023-10-20455/2023(DIRTSO-AEE3/2022/1864)
Critical Information Infrastructure - Protected systems of SLDC notified - Formation of Information Security Steering Committee (ISSC)
Date: 2023-10-20457/2023(SCM/XT/AEE7/122/2020-21)20
Purchase of various ratings of Power Transformers – PO’s issued to M/s.TELK Ltd – Request for delivery period extension allowing price variation - Sanction accorded – Orders issued
Date: 2023-10-20453/2023(D(T&SO)/T4/SO/SAMAST/2019-29)
SAMAST project - Accounting procedure for the installation and testing of ABT meters procured
Date: 2023-10-19454/2023(DGE/G3/Jaljeevan mission-Ponmudi)
Jaljeevan mission - Rajakkad Baison Valley Rajakumari Senapathy Panchayat drinking water supply scheme
Date: 2023-10-19451/2023(DIRDIT/AE3/LineShifting/Palakkad/01)
Shifting of LT 3 ph line for statutory clearance in favour of Sri.Murugan, S/o Karuppan under Electrical Section, Velanthavalam - 803/Ord/M(Ele)/2021
Date: 2023-10-18452/2023(VG/A(4)/4464/2020)
Disciplinary proceedings against Sri. Rafi.S.M., Assistant Executive Engineer, Electrical Sub Division, Veliyam - Re-examination petition against the order of the Chairman & Managing Director
Date: 2023-10-18445/2023 (FA/AA/Accounts 2022-23)
Statement of accounts of Kerala State Electricity Board Limited as on 31.03.2023 -Confirmation & approval
Date: 2023-10-16450/2023(D(T&SO)/T4/Pugalur-Thrissur)
Construction of Pugalur - Thrissur HVDC transmission line - Compensation to be given for Line Corridor as per the Special compensation package - Remitting the share of KSEBL
Date: 2023-10-16449/2023(D(T,SO&P)/T2/VISL/2023-24)
Construction of 20km of 220/110kV MC/DC Line from 220kV Substation Kattakkada to 220kV GIS Vizhinjam through Balaramapuram and 220kV VISL Substations
Date: 2023-10-16448/2023(No.DGC/AEEIII/Thottiyar/2014)
Thottiyar Hydro Electric Project (40MW) - Execution of Balance Civil and Hydro Mechanical works of Thottiyar Hydro Electric Project (40 MW/ 99 MU) - Contract with M/s PRIL - SSIPL Consortium
Date: 2023-10-16446/2023(PC/SCM/PSC poles/8m-140kg/2023)
Manufacture and supply of 8m/140kg PSC poles - Special Leave Petition No.6908-6909/2022 filed by M/s. Sivasakthi Engineering and Fabricators (P) Ltd.
Date: 2023-10-16443/2023 (DIRDIT/AE5/2023/RENAMING)
Renaming of 'Electrical Section Ayroor' under Electrical Circle Pathanamthitta as 'Electrical section Ayirur Kathakali Gramam'
Date: 2023-10-13