Board Orders

493/2023(DIRGE-AEE4/2023/327)

Pallivasal Extension Scheme (2x30 MW) HEP - Erection of supplied E&M equipment and supply and erection of BOP equipment - Request for the time extension of contract completion period

Date: 2023-11-16

495/2023(DIRGE-AEE4/2023/200)

Thottiyar 40 (1x10+1x30) MW HEP - Supply, Erection, Testing and Commissioning of Governor, Excitation, DCS and Protection Panels - Request for time extension to M/s. ABB India Limited

Date: 2023-11-16

489/2023(SOR/SA-28/2023/991)

Settlement of current charge arrears of M/s V - Mart Super Market, Vyttila, Ernakulam (LCN 20/4164) under OTS Scheme 2023

Date: 2023-11-16

496/2023(SOR/SA-31/2023/1004)/50

Settlement of current charge arrears of M/s. Thamara Rubbers (LCN.No.12/1247) under OTS Scheme 2023

Date: 2023-11-16

491/2023(SOR-SA31/2023/1014)/48

Settlement of current charge arrears of M/s. Saroj Steel Re Rolling Mill (LCN.No.26/2628) under OTS Scheme 2023

Date: 2023-11-16

490/2023(SOR-SA31/2023/1007)/51

Settlement of current charge arrears of M/s. Kanprint Offset printers (LCN.No.13/8128) under OTS Scheme 2023

Date: 2023-11-16

488/2023(SOR-SA31/2023/990)/49

Settlement of current charge arrears of M/s. Chidambaram Tea Estate, Peermade (Marikkar Plantations Pvt. Ltd.) (LCN.No.16/1607) under OTS Scheme

Date: 2023-11-16

494/2023(DGC/AEEV/PES-Balance works/2018)

Pallivasal Extension Scheme (2X30 MW) - Balance Civil Works of Tunnel, Surge Shaft, Pressure Shaft, Penstock

Date: 2023-11-16

486/2023(DIRGE-AEE4/2022/705)

Erection of supplied Electro Hydro Mechanical equipment in Powerhouse of Thottiyar 40(1x10+1x30) MW HEP – Request for time extension to M/s. Fitwell Constructions

Date: 2023-11-15

487/2023(DGE/G3/Enhancing Km limit GSD Malampuzha)

Enhancing monthly ceiling of vehicle attached to Generation Sub Division & Hiring of vehicle for the use at Generation Sub Division, Malampuzha

Date: 2023-11-15

484/2023(DGC/AEE-VI/BRPL/2014)

Barapole SHEP - Rectificaiton work of power canal of Barapole SHEP - Conducting Geophysical Investigation study through M/s PARSAN Overseas Pvt. Ltd., New Delhi

Date: 2023-11-14

482/2023 (TRAC-AEE1/2023/186)

KSERC Interim order in the matter of schedule of tariff and terms and conditions for retail supply of electricity by KSEBL and all other Licensees with effect from 01.11.2023 to 30.06.2024

Date: 2023-11-13

481/2023(SOR-SA31/2023/1001)

Settlement of current charge arrears of M/s.Kaypee Metals & Alloys (P) Ltd (LCN.No.6/3209) under OTS Scheme 2023

Date: 2023-11-13

476/2023(SOR-SA28/2023/1000)

Settlement of current charge arrears of M/s Ponmudi Paper Mills Ltd, Chalakkuzhy Building, Peroorkada, Thiruvananthapuram (LCN 15/1953) under OTS Scheme 2023

Date: 2023-11-13

477/2023(SOR-SA28/2023/988)

Settlement of current charge arrears of M/s Gopika Dairy Farm(LCN 19/3577) under OTS Scheme 2023

Date: 2023-11-13

480/2023(SOR/SA-28/2023/986)

Settlement of current charge arrears of M/s Two in One Storage Extrusions, 2/286D Okkal, Perumbavoor, (LCN 15/7301) under OTS Scheme 2023

Date: 2023-11-13

473/2023(SEC-ES-ST2/2023/476)

Establishment - Compassionate Employment Scheme - Appointment of dependents of KSEBL employees who die-in-harness - Select List for 07/2023 - Approved

Date: 2023-11-10

472/2023(CEREES-AEE4/2023/1772)

Appointment of EPC contractor for design as per site conditions, erection, testing & commissioning of Grid Tied Ground Mounted Solar PV Power plants at Brahmapuram, Kanjikode and Agali

Date: 2023-11-09

471/2023(DGC/AEE IV/Dam Safety/Desiltation/2023)

Desiltation of Reservoirs of KSEBL - Standard Operating procedure for the reservoirs of KSEBL- Modified in line with the SOP published by Government of Kerala

Date: 2023-11-08

468/2023(SCM/XT/AEE1/123/2022-23/Fdr & Tfr C&R Panels)

Bid for the supply of 33 kV Feeder and 33/11 kV Transformer Control & Relay Panels

Date: 2023-11-04

467/2023(Fin2(B)/SBI/e- Trade facility/2023-24)

E-Trade facility for opening LCs/ BGs on-line – Resolution – Sanctioned – Orders issued

Date: 2023-11-01

465/2023(CW/GNL/2023)

Guideline in KSEBL to ensure strict adherence to Green Building Protocol - Granting in principle approval

Date: 2023-10-30

462/2023(No.DGC/AEEIII/O&P/2014)

Implementation of Olikkal SHEP (5MW/10.26Mu) - Existing road from Punnakkal to Olikkal -Complaint of local people for repairing the damaged road

Date: 2023-10-25

461/2023(DIRGE-AEE4/2022/936)

Supply of one set of 11kV Isolated Phase Bus Duct (IPBD) and one set of 11kV Segregated Phase Bus Duct (SPBD) for 40 (1x10+1x30) MW Thottiyar Hydro Electric Project

Date: 2023-10-25

460/2023(DIRGE/G2/THEP-UCL/2023)

Supply, Laying, Testing and Commissioning of 220kV, 800 sq.mm XLPE, Under Ground cable for power evacuation

Date: 2023-10-25

459/2023(DIRGE-AEE4/2022/479)

Execution of RMU works of Kuttiyadi (3x25MW) HEP awarded to M/s. BHEL - Request for Time Extension for the period of contract

Date: 2023-10-21

456/2023(DIRGE-AEE4/2022/PED/P.MUZHY)

E &M works of Peruvannamuzhi SHEP (2x3 MW) - Request for Time Extension of the contract up to 30.08.2023

Date: 2023-10-20

455/2023(DIRTSO-AEE3/2022/1864)

Critical Information Infrastructure - Protected systems of SLDC notified - Formation of Information Security Steering Committee (ISSC)

Date: 2023-10-20

457/2023(SCM/XT/AEE7/122/2020-21)20

Purchase of various ratings of Power Transformers – PO’s issued to M/s.TELK Ltd – Request for delivery period extension allowing price variation - Sanction accorded – Orders issued

Date: 2023-10-20

453/2023(D(T&SO)/T4/SO/SAMAST/2019-29)

SAMAST project - Accounting procedure for the installation and testing of ABT meters procured

Date: 2023-10-19

454/2023(DGE/G3/Jaljeevan mission-Ponmudi)

Jaljeevan mission - Rajakkad Baison Valley Rajakumari Senapathy Panchayat drinking water supply scheme

Date: 2023-10-19

451/2023(DIRDIT/AE3/LineShifting/Palakkad/01)

Shifting of LT 3 ph line for statutory clearance in favour of Sri.Murugan, S/o Karuppan under Electrical Section, Velanthavalam - 803/Ord/M(Ele)/2021

Date: 2023-10-18

452/2023(VG/A(4)/4464/2020)

Disciplinary proceedings against Sri. Rafi.S.M., Assistant Executive Engineer, Electrical Sub Division, Veliyam - Re-examination petition against the order of the Chairman & Managing Director

Date: 2023-10-18

445/2023 (FA/AA/Accounts 2022-23)

Statement of accounts of Kerala State Electricity Board Limited as on 31.03.2023 -Confirmation & approval

Date: 2023-10-16

450/2023(D(T&SO)/T4/Pugalur-Thrissur)

Construction of Pugalur - Thrissur HVDC transmission line - Compensation to be given for Line Corridor as per the Special compensation package - Remitting the share of KSEBL

Date: 2023-10-16