Board Orders
119/2023 [LAII.5014/2018]
Arbitration Case No. 76/ 2019 before the Court of the Additional District Judge (Commercial) Dehradun, Uttarakhand Filed by M/ s Mahavir Transmission Ltd -Conduct of case
Date: 2023-03-09118/2023(Fin2(B)/IB/Federal Bank/OD/WCDL/2022-23)
Renewal of credit facilities from M/s Federal bank
Date: 2023-03-09120/2023 (GBII/Gen/Cataract/HRM/22-23)
Rates for cataract surgery and implants followed by State health Agency for reimbursement of medical claims — Adopted in KSEBL
Date: 2023-03-09117/2023(CE/SCM/XC/AE3/PSC Poles/8m/2021-22)
Manufacture and Supply of 8m/200kg PSC poles for the Electrical Circles under Southern, Central, Northern and North Malabar Regions for a period of 2 years
Date: 2023-03-08116/2023(DGC/AEE V/PES/General/2021)
Pallivasal Extension Scheme (2x30MW) - Repair work of the road to Surge Shaft of Pallivasal Extension Scheme
Date: 2023-03-08114/2023(D(T,SO,P&S)/T1/Material/Transformer Oil/22-23)
Procurement of Transformer oil- Arranging purchase from oil companies both PSUs and Private, having own refineries- Entrusting Chief Engineer (SCM) to arrange the purchase
Date: 2023-03-08108/2023 (LAS.I/4551/2022)
Compliance of the Common Judgment dated 03.06.2022 of the Hon'ble High Coutt of Kerala in WPC No.11449/202I filed by Sri. Rajesh. S and others and WP (C) No.21293/2022
Date: 2023-03-06112/CW/GNL/2023
Revamping of Consultancy Wing, KSEBL
Date: 2023-03-06111/2023(DIRTSO-AE6/2022/1272)
Execution of new MOU with M/s BPCL-KR for enhancing contract demand - Clarification needed in the Board Order issued on 28.07.2022
Date: 2023-03-06110/2023 (Estt.II/4322/2022)
Establishment — Compassionate Employment Scheme — Selection of Sri. Abhiram M P as Office Attendant II in Select List for 09/2020
Date: 2023-03-06106/2023(Fin2(B)/TMB/IB/OD-WCDL/2022-23)
Renewal of credit limit of Rs.75 Crore from M/s Tamilnad Mercantile Bank Limited Thiruvananthapuram
Date: 2023-03-04103/2023(DGC/AEE IV/Dam Safety/DRIP Works/2022)
Dam Rehabilitation and lmprovement Project (DRIP) Phase ll - Modernization of the existing OTIS make elevator installed at Idamalayar dam
Date: 2023-03-02105/2023(DIRGE-AEE1/2023/68)/1428
Procurement of a new Vehicle MAHINDRA BOLERO-B6 for the Executive Engineer, Generation Division, Kozhikode and survey reporting the existing vehicle
Date: 2023-03-02104/2023(DIRTSO-AE5/2022/1146)
Adoption of PRICE software for transmission works in KSEBL - Incorporating transmission data in the PRICE software - Details to be submitted to Government
Date: 2023-03-0299/2023(D(D&IT)/D6-AE1/General/Colony Electrification/2021-22)
Tribal Colony Electrification - Fund requirement - Further action
Date: 2023-03-01102/2023(D(T&SO)/T7/Land BSES/22-23)
Repossession of 20 acres of land at Pathalam at Eloor Village received from M/s TCCL -Issuing notice to M/s BSES Kerala Power Ltd
Date: 2023-03-01100/2023 (CAPS/AE2/RAPDRP/TVM City/2022-23)
RAPDRP Part B Thiruvanathapuram city scheme - issues with M/ s Leena Power Tech Engineers Pvt Ltd - Direction from Government for settling the issues
Date: 2023-03-0186/2023 (KSEB/TRAC / FSP /Implementation/2022-23)
KSERC order dated 25.01.2023 on Fuel Price Adjustment Charges applicable to all consumers including Bulk Consumers and other Licensees in the State for consumption
Date: 2023-02-2791/2023(DGE/G3/Hiring Jeep -CM Section Poringal)/1427
Hiring Jeep /Multi-utility vehicle (above 1500cc) having taxi permit and driver on contract basis for the use of Civil Maintenance Section, Poringalkuthu
Date: 2023-02-2796/2023(DGC/AEE VI/Design Clinic/2022)
Cost Effective Design of Hydro Projects-Entrusting Design Vetting through M/s NHPC & Nomination of Nodal Offcers
Date: 2023-02-2789/2023(DGE/G3/Kanjikkode land)
Kanjikode land (4 Acre) - dispute with DIC - joint meeting conducted - conducting land survey
Date: 2023-02-2784/2023 [PS1 (A)/OLGT-2023/GL for Middle Level Officers]
KSEBL - Guidelines for Online General Transfer of the Middle-Level Officers - Modifications suggested in connection with certain provisions of the existing Guidelines
Date: 2023-02-2783/2023 [PS1 (A)/OLGT-2023/Guidelines for Workmen]
Guidelines for the Online General Transfer of the Workmen
Date: 2023-02-2794/2023(D(T,SO,P&S)/T2/Kota/2022-23)
Proposal for construction of a new 110 kV Substation at Kotta, Chengaannur in the land owned by KSTCL in the premises of M/s. Prabhuram Mills
Date: 2023-02-2795/2023(D(T&SO)/T7/Land Kottathara/2022-23)
TransGrid 2.0 - Implementation of Attappady Green Corridor project - Construction of 220kV Substation at Kottathara - Acquisition of land through LARR Act
Date: 2023-02-2793/2023(DIRTSO-AE2/2022/2648)
Capacity enhancement and construction of new control room building at 33kV Substation Urumi - Transfer of 15 cents of land from Generation wing
Date: 2023-02-2790/2023(D(T&SO)/T7/Land Thimir/2021-22)
Construction of new 110 kV Substation at Thimiri in Kannur District - Acquisition of 150 cents of land
Date: 2023-02-2779/2023(DIRDIT-AE3/2023/61)
Petition from Sri.Aadeeswaramoorthy, Palakkad for installments in respect of his Agricultural service Connection application
Date: 2023-02-2080/2023(No. DGC/AEE IV/VBTVM/2014)
Essential modernization/ providing modern modular work amenities in Vydyuthi Bhavanam, Thiruvananthapuram- Modifcations & Time Extension
Date: 2023-02-2077/2023(DGC/AEEII/PAP/2022)
PAP Agreement - Review of the agreement- Constitution of an internal Committee
Date: 2023-02-1775 /2023 (KSEBL/Soura/RTS/Model III/22-23/TVPM)
lmplementation of Roof Top Solar Plants by KSEBL as an executing agency on deposit work basis -Approved
Date: 2023-02-1571/2023(DGE/Idamalayar Crane)/1287
Idamalayar HEP - Procurement of Multi Activity Crane having 21 meter (69 feet) height with man lift for using at ldamalayar Power Station through GeM portal
Date: 2023-02-1370/2023(DGE/G3/PallivasalShutdown)/1286
Pallivasal HEP - Request for total shutdown from 10.02.2023 to 03.03.2023
Date: 2023-02-1369/2023(DIRTSO-AE6/2023/200)
Enhancing the kilometer ceiling limit of the vehicle attached to the Quality Control Unit, Transgrid South, Kalamassery - Sanction accorded - Orders issued
Date: 2023-02-1372/2023 (IT/Proj/RDSS/Smart Meter/2022-23)
Revamped Distribution Sector Scheme (RDSS) – Implementation of Prepaid Smart meter in KSEBL without Project Implementation Agency (PIA) - Sanctioned – Orders issued
Date: 2023-02-1368/2023(DIRGE-AEE4/2022/936)
Thottiyar HEP - Supply of one set of 11 kV Isolated Phase Bus Duct (IPBD) and one set of 11 kV Segregated Phase Bus Duct (SPBD) - Request for time extension
Date: 2023-02-1362/2023(D(T,SO,P&S)/T2/Chethala - Tree Cutting/2022-23
Tender cum Auction for the sale of trees in the compound of the proposed 110kV Substation, Cherthala - Tender cum Auction confirmation - Sanction accorded - Orders issued
Date: 2023-02-1061/2023(D(T&SO)/T4/SO/KFON/20-21)
KFON Project - OPGW - Acceptance of deviation in splice loss during post installation SAT / link commissioning - Sanctioned - Orders issued
Date: 2023-02-1060/2023(DIRTSO-AE4/2022/3981)
Request to hand over KSEBL land to NHAI for widening/construction of National Highwy 66 -Construction of Bypass road along the boundary of 66kV Substation, Karunagapally
Date: 2023-02-0759/2023(D(T,SO,P&S)/T2/EDPN-Tree Cutting/2022-23)
Sale of trees inside the compound of 220kV Substation, Edappon under Transmission Circle Alappuzha - Tender cum Auction - Confirmation - Sanction accorded - Orders issued
Date: 2023-02-07