Board Orders
501/2023(DGC/AEE IV/Dam Safety/Idukki Dam/2022)
KIFB-HILL HIGHWAY-Improvements to Peerumedu - Devikulam road 19/000 to 40/050 & Thodupuzha-Pulianmala road ch.85/500 to 92/167
Date: 2023-11-20497/2023(SOR-SA26/2023/983)/142
Settlement of current charge arrears of M/s. Rohit Cots Pvt. Ltd., 'Narayana', Krishna Nagar, Poothole, Thrissur LCN.No.31/3410) under OTS Scheme 2023
Date: 2023-11-17498/2023(SOR-SA17/2023/1012)
Settlement of current charge arrears of M/s. Pioneer Wood Products, Vengola (LCN.No.26/4760) under OTS Scheme 2023
Date: 2023-11-17493/2023(DIRGE-AEE4/2023/327)
Pallivasal Extension Scheme (2x30 MW) HEP - Erection of supplied E&M equipment and supply and erection of BOP equipment - Request for the time extension of contract completion period
Date: 2023-11-16495/2023(DIRGE-AEE4/2023/200)
Thottiyar 40 (1x10+1x30) MW HEP - Supply, Erection, Testing and Commissioning of Governor, Excitation, DCS and Protection Panels - Request for time extension to M/s. ABB India Limited
Date: 2023-11-16489/2023(SOR/SA-28/2023/991)
Settlement of current charge arrears of M/s V - Mart Super Market, Vyttila, Ernakulam (LCN 20/4164) under OTS Scheme 2023
Date: 2023-11-16496/2023(SOR/SA-31/2023/1004)/50
Settlement of current charge arrears of M/s. Thamara Rubbers (LCN.No.12/1247) under OTS Scheme 2023
Date: 2023-11-16491/2023(SOR-SA31/2023/1014)/48
Settlement of current charge arrears of M/s. Saroj Steel Re Rolling Mill (LCN.No.26/2628) under OTS Scheme 2023
Date: 2023-11-16490/2023(SOR-SA31/2023/1007)/51
Settlement of current charge arrears of M/s. Kanprint Offset printers (LCN.No.13/8128) under OTS Scheme 2023
Date: 2023-11-16488/2023(SOR-SA31/2023/990)/49
Settlement of current charge arrears of M/s. Chidambaram Tea Estate, Peermade (Marikkar Plantations Pvt. Ltd.) (LCN.No.16/1607) under OTS Scheme
Date: 2023-11-16494/2023(DGC/AEEV/PES-Balance works/2018)
Pallivasal Extension Scheme (2X30 MW) - Balance Civil Works of Tunnel, Surge Shaft, Pressure Shaft, Penstock
Date: 2023-11-16486/2023(DIRGE-AEE4/2022/705)
Erection of supplied Electro Hydro Mechanical equipment in Powerhouse of Thottiyar 40(1x10+1x30) MW HEP – Request for time extension to M/s. Fitwell Constructions
Date: 2023-11-15487/2023(DGE/G3/Enhancing Km limit GSD Malampuzha)
Enhancing monthly ceiling of vehicle attached to Generation Sub Division & Hiring of vehicle for the use at Generation Sub Division, Malampuzha
Date: 2023-11-15484/2023(DGC/AEE-VI/BRPL/2014)
Barapole SHEP - Rectificaiton work of power canal of Barapole SHEP - Conducting Geophysical Investigation study through M/s PARSAN Overseas Pvt. Ltd., New Delhi
Date: 2023-11-14482/2023 (TRAC-AEE1/2023/186)
KSERC Interim order in the matter of schedule of tariff and terms and conditions for retail supply of electricity by KSEBL and all other Licensees with effect from 01.11.2023 to 30.06.2024
Date: 2023-11-13481/2023(SOR-SA31/2023/1001)
Settlement of current charge arrears of M/s.Kaypee Metals & Alloys (P) Ltd (LCN.No.6/3209) under OTS Scheme 2023
Date: 2023-11-13476/2023(SOR-SA28/2023/1000)
Settlement of current charge arrears of M/s Ponmudi Paper Mills Ltd, Chalakkuzhy Building, Peroorkada, Thiruvananthapuram (LCN 15/1953) under OTS Scheme 2023
Date: 2023-11-13477/2023(SOR-SA28/2023/988)
Settlement of current charge arrears of M/s Gopika Dairy Farm(LCN 19/3577) under OTS Scheme 2023
Date: 2023-11-13480/2023(SOR/SA-28/2023/986)
Settlement of current charge arrears of M/s Two in One Storage Extrusions, 2/286D Okkal, Perumbavoor, (LCN 15/7301) under OTS Scheme 2023
Date: 2023-11-13473/2023(SEC-ES-ST2/2023/476)
Establishment - Compassionate Employment Scheme - Appointment of dependents of KSEBL employees who die-in-harness - Select List for 07/2023 - Approved
Date: 2023-11-10472/2023(CEREES-AEE4/2023/1772)
Appointment of EPC contractor for design as per site conditions, erection, testing & commissioning of Grid Tied Ground Mounted Solar PV Power plants at Brahmapuram, Kanjikode and Agali
Date: 2023-11-09471/2023(DGC/AEE IV/Dam Safety/Desiltation/2023)
Desiltation of Reservoirs of KSEBL - Standard Operating procedure for the reservoirs of KSEBL- Modified in line with the SOP published by Government of Kerala
Date: 2023-11-08468/2023(SCM/XT/AEE1/123/2022-23/Fdr & Tfr C&R Panels)
Bid for the supply of 33 kV Feeder and 33/11 kV Transformer Control & Relay Panels
Date: 2023-11-04467/2023(Fin2(B)/SBI/e- Trade facility/2023-24)
E-Trade facility for opening LCs/ BGs on-line – Resolution – Sanctioned – Orders issued
Date: 2023-11-01465/2023(CW/GNL/2023)
Guideline in KSEBL to ensure strict adherence to Green Building Protocol - Granting in principle approval
Date: 2023-10-30462/2023(No.DGC/AEEIII/O&P/2014)
Implementation of Olikkal SHEP (5MW/10.26Mu) - Existing road from Punnakkal to Olikkal -Complaint of local people for repairing the damaged road
Date: 2023-10-25461/2023(DIRGE-AEE4/2022/936)
Supply of one set of 11kV Isolated Phase Bus Duct (IPBD) and one set of 11kV Segregated Phase Bus Duct (SPBD) for 40 (1x10+1x30) MW Thottiyar Hydro Electric Project
Date: 2023-10-25460/2023(DIRGE/G2/THEP-UCL/2023)
Supply, Laying, Testing and Commissioning of 220kV, 800 sq.mm XLPE, Under Ground cable for power evacuation
Date: 2023-10-25459/2023(DIRGE-AEE4/2022/479)
Execution of RMU works of Kuttiyadi (3x25MW) HEP awarded to M/s. BHEL - Request for Time Extension for the period of contract
Date: 2023-10-21456/2023(DIRGE-AEE4/2022/PED/P.MUZHY)
E &M works of Peruvannamuzhi SHEP (2x3 MW) - Request for Time Extension of the contract up to 30.08.2023
Date: 2023-10-20455/2023(DIRTSO-AEE3/2022/1864)
Critical Information Infrastructure - Protected systems of SLDC notified - Formation of Information Security Steering Committee (ISSC)
Date: 2023-10-20457/2023(SCM/XT/AEE7/122/2020-21)20
Purchase of various ratings of Power Transformers – PO’s issued to M/s.TELK Ltd – Request for delivery period extension allowing price variation - Sanction accorded – Orders issued
Date: 2023-10-20453/2023(D(T&SO)/T4/SO/SAMAST/2019-29)
SAMAST project - Accounting procedure for the installation and testing of ABT meters procured
Date: 2023-10-19454/2023(DGE/G3/Jaljeevan mission-Ponmudi)
Jaljeevan mission - Rajakkad Baison Valley Rajakumari Senapathy Panchayat drinking water supply scheme
Date: 2023-10-19451/2023(DIRDIT/AE3/LineShifting/Palakkad/01)
Shifting of LT 3 ph line for statutory clearance in favour of Sri.Murugan, S/o Karuppan under Electrical Section, Velanthavalam - 803/Ord/M(Ele)/2021
Date: 2023-10-18