231/2024 (DGC/AEEIV/Dam Safety/Staff/2022-Part (2))

DRIP II - Hiring an Environmental Specialist in SPMU on contract basis, to assist in Environment Studies, and implementation of Environmental

Date: 2024-05-14

229 /2024 (DGE/G2/AEE3/ Pazhassi Sagar/2023)

Execution of E&M works of Pazhassi Sagar Small Hydro Electric Project (3x2.5MW) - Storage space for E&M equipment - Revision of storage period

Date: 2024-05-10

225 /2024 (DGC/AEE II/Sengulam Penstock/2024)

Execution of rectification/replacement of Penstock, Butterfly valves, Gate valves & allied works of Sengulam HE Project- Request for time extension up to 31.03.2024

Date: 2024-05-10

226 /2024 (DGE/G2/AEE3/Tender modifications/2024-25)

Review and Refinement of General Conditions of Contract and Pre-Qualification conditions applied to Electro mechanical works of Hydro projects (Balance items)

Date: 2024-05-10

216 /2024 [(T&SO)/T4/Power Crisis/2024-25]

Power crisis - Efforts to manage peak demand - Proposal for running two diesel generator units of KDPP for 3 hours in a day during May 2024

Date: 2024-05-10

220/2024 (DGE/G2/AEE3/THEP/2023 - Part (2))

Supply, installation, testing and commissioning of firefighting systems at Thottiyar 40(1x10+1x30) MW Hydro Electric Project - Request for time extension

Date: 2024-05-10

223/2024(CE/SCM/Trans.contract/Mfs/2022-24)

Transportation, loading & unloading of raw materials for fabrication works from suppliers and transportation, loading and unloading of finished line materials

Date: 2024-05-10

221/2024 (DIRTSO-AE5/NSIP III/2024)

TransGrid 2.0 - North South Interlink package III - Upgradation of 66kV Aluva-Chalakkudy Double Circuit line to 110kV DC line - Administrative Sanction accorded

Date: 2024-05-10

218 /2024(CEIT/RITU/KFON/OFFICERS /2024-25)

KFON Project-Deputation of Officers-Effecting the change from KSITIL to KFON Ltd-Sanctioned - Orders issued

Date: 2024-05-10

214 /2024 (DGE/G1/KDPP License/2024-25)

KDPP- Renewal of integrated licence of Kerala state pollution control Board (KPCB) Sanction request - Sanctioned - Orders issued

Date: 2024-05-07

212 /2024 [D(T&SO)/T4/SO/OpticFibreLeasing/2024-25]

Leasing of OPGW dark fibres of KSEBL to various agencies - Extension of lease agreement -Sanctioned - Orders issued

Date: 2024-05-07

207 /2024 [D(T&SO)/T2/Lulu/2024-25]

Providing connectivity at 33kV voltage level to an extent of 12 MVA to M/s LULU Mall, Aakkulam on work deposit basis - Revised Administrative - Sanction Accorded

Date: 2024-05-06

211 /2024 (DGE/G2/AEE3/GCC-E&M/2024 - Part (1))

Review and refinement of General Conditions of Contract and Pre-Qualification conditions applied to Electro mechanical works of Hydro projects - Sanctioned

Date: 2024-05-06

208 /2024 [ D(T,SO&P)/T1/Filter Plant/CETN/24-25]

Purchase of one mobile transformer filtration plant of capacity 6000 LPH as additional order to the existing contract with M/s CEE DEE Vacuum Equipments Pvt Ltd

Date: 2024-05-06

190/2024 (KSEBL/TRAC-R1/solar Penetration)

Formation of Committee for studying the impact of soaring solar penetration on the grid -Sanctioned - Orders issued

Date: 2024-04-29

191/2024 (DGC/AEE-II/Pumped Storage/2022)

Implementation of Pumped Storage Projects(PSPs) - Seeking in Principle approval from Government -Sanctioned - Orders issued

Date: 2024-04-29

183/2024 (PS-ST1/2023/1921)

Order is issued in implementation of the order issued by the Government of Kerala re-regulating the working hours of part-time contingent service employees

Date: 2024-04-27

146/2024 (CEIT/RITU/SCADA-PM)

Implementation of RDSS SCADA Projects in KSEBL - Formation of field implementation team with strategical units - Sanctioned - Orders issued

Date: 2024-04-11

130/2024(E395/KSEBL/FA/AAA/25/2024-S1)

Withdrawal of KWA arrears taken over by the Government as on 31.10.2023 - Sanctioned -Orders issued

Date: 2024-03-30

CS/KSEBL/Independant Director/2015-16

Independant Director Appointment

Date: 2024-03-19

90/2024(DIRDIT-AE7/2023/10616)

Sanction for hiring a Contract Jeep with a monthly limit of 1750km from the existing 1500km attached to Electrical Section, Angamaly under Electrical Circle, Perumbavoor

Date: 2024-03-02

FTD No.91/2024(DIRDIT)/AE5/2023/LOAD

Voluntary Declaration of Connected Load-Extending scheme.

Date: 2024-03-02

82/2024 (KSEBL/TRAC/CG/Co-ordination Committee/2023-24)

Reconstituting the Co-ordination Committee as per Regulation 54 of KSERC (Connectivity and Intra State Open Access) Regulations, 2013 - Sanctioned - Orders issued

Date: 2024-02-23

77/2024(SEC-ES-ST6/2023/326)

Family Pension Arrear from 10/2019 to 04/2023 in respect of Smt. P V Annamma, W/o Late. M V Poulose, Assistant Engineer (Rtd), PPO No.16643 - Sanctioned

Date: 2024-02-17

74/2024 (DTSO/T4/2023-24)

Execution of Monthly Contracts with Power Exchanges for purchase of 300MW power during March 2024 and 50MW during April and May 2024

Date: 2024-02-15

71/2024 (CAPS/AE2/RDSS/PVTG HHs/2023-24)

Electrification of Unelectrified PVTG Households under RDSS - Administrative Sanction accorded - Orders issued

Date: 2024-02-15

75/2024(DIRDIT-AE3/2023/8325)

Request for approval of Single tender- Outdoor 11 kV 630 A extensible RMU - SCADA and ABB compatible - Sanctioned - Orders Issued

Date: 2024-02-15

72/2024 (KSEBL/SEC/ESTT/33/2023-S2)

Establishment - Compassionate Employment Scheme - Appointment of dependants of KSEBL employees who die-in-harness - Select List for 10/2023 - Approved

Date: 2024-02-15

73/2024 (DIRTSO-AE5/2023/1513)

TransGrid 2.0 - Execution of Travancore Lines package I & II - Delay in getting road cutting approvals from NHAI - Releasing payment to the contractor

Date: 2024-02-15

69/2024 (SCM/TA-GI/2023-24)

Material Procurement - Pending issues raised by the Manufacturers and Suppliers in SCM unit -Specific observations and remarks - consolidated

Date: 2024-02-13

70 /2024 (KSEB/SCM/XM/AE(A)/2023-24

Procurement and Supply Chain Management framework for materials and services in KSEBL - Sanctioned - Orders issued

Date: 2024-02-13

67/2024 (DIRTSO-AE5/TG/KottayamSS)

Transgrid - GIS package 2 - Construction of 400kV GIS Substation, Kottayam - Request of M/s Toshiba T&D systems (India) Ltd for payment

Date: 2024-02-12

68/2024 (DGC/AEEIII/MKLM/2014)

Mankulam HEP (2x20MW) - Land Acquisition - Ex gratia payment for non patta land through negotiated purchase - Sanctioned - Orders issued

Date: 2024-02-12

66/2024 (E.11228/Fin2(B)/UBI/OD-WCDL/IB/2023-24)

Renewal of Existing FBWC limit of Rs.200Crore from M/s. Union Bank of India- Sanctioned - Orders issued

Date: 2024-02-12

59/2024 (XD/AE3/SCM.70/2022-23)

Supply of 1400 nos of 11kV/ 433V, 100kVA, BEE Energy Efficiency Level 1 (1 star) rated distribution transformers with ISI marking - Arranging purchase

Date: 2024-02-02

60/2024 (PS 1(A)/OLGT-2024/Guidelines for Workmen)

KSEBL – Guidelines for Online General Transfer of the Workmen – Modifications – Sanctioned – Orders issued

Date: 2024-02-02

62/2024 (PS 1(A)/OLGT-2024/for Higher Level Officers)

KSEBL - Guidelines for Online General Transfer of the Higher Level Officers - Approved - Orders issued

Date: 2024-02-02

61/2024 (PS 1(A)/OLGT-2024/GL for Middle Level Officers)

KSEBL - Guidelines for Online General Transfer of the Middle Level Officers – Modifications suggested in connection with certain provisions of the existing Guidelines

Date: 2024-02-02

48/2024 (SEC-ES-ST2/2023/587

Establishment-Compassionate Employment Scheme-Select list for 09/2023-Approved-Orders- issued

Date: 2024-01-31

55/2024 (DIRDIT/AE5/2023/METER READING)

Shifting of LT meter readings of Centralized billed Government consumers and consumers with grid connected solar connections from Sub Engineers to meter readers