Board Orders

743 /2020 (D (D, IT&HRM)/ D-1/ Safety /2020-21/0002)

Shifting of unsafe electrical line at the expense of the Board - representations from Smt. Shijitha, Punnalath Veedu, Kalluvathukkal

Date: 2020-12-17

746 /2020 (D (D, IT&HRM)/D-1/General/2020-21/0017)

Recommendation of the Deputy Chief Engineer, Electrical Circle, Kattakkada for a good service entry to Sri Sabu F, Sub Engineer

Date: 2020-12-17

744 /2020 (D(D,IT&HRM)/D-2/Adalath/0022/2020-21)

Petition received from smt. Sheela George, Popular Marbles, Muringoor in Vydyuthi Adalath 2020-Withdrawal of demand

Date: 2020-12-17

742 /2020(D(T&SO)/T7/SR/2020-21)

Construction of 66kV Substation Ambalavayal in 110kV parameter auction of trees in the RoW through the land owned by ITDP

Date: 2020-12-17

741/2020 D(G-E&SCM)/GL/2020-21)

Manufacturing of PSC poles - Quality issues - Departmenal Supervision - Sanctioned

Date: 2020-12-17

745/2020 (D (D, IT&HRM)/D-1/OTS/2019-20/0002)

Settlement of arrears of Consumer No. 1156241003522, M/s Hotel Maharani, Pala under OTS scheme 2019- ratification

Date: 2020-12-17

740/2020 (CE(C&P)/kuzhalmannam-Solar/2020-21)

ANERT - 2 MW Solar plant at Kuzhalmannam- Initialling of Power Purchase Agreement -Sanctioned Orders issued

Date: 2020-12-16

739/2020 (PS1/2942/2019)

Sri. Anil Kumar P. Regarding the passing of an order on an application for protection under Section 20 of the Rights of Persons with Disabilities Act, 2016

Date: 2020-12-15

738/2020/D(T&SO)/T6/TransGrid/Gl/20-21

Deployment of officers for sanctioned places at the O/o the Chief Engineer, TransGrid, Shoranur- Period of Extension - Sanctioned

Date: 2020-12-15

737/2020 (LD.I/LBS/22020/03)

Payment of Professional fees to Sri.S.Raghu, Advocate, Bangalore for having conducted Appeal No. E/509/2009-DB

Date: 2020-12-15

736/2020 (SCM/TA/Gl./2020-21)

Validity Period of Type Test(s) conducted on Major Electrical Equipment in Power Transmission System and Extension of validity date of Type Test Certificate

Date: 2020-12-14

735 /2020(CE-IT / RITU/DR-Cherthala/20-21)

DR Centre of KSEB Ltd. at Infopark, Cherthala-Expiry of lease agreement -Renewal-Revising of rent and Security Deposit - Sanctioned

Date: 2020-12-11

734 /2020 (DGC/AEE VI/CHKN /2014)

Execution of balance civil works of Chathankottunada SHEP Stage II-Contract with M/s K.K.Builders-Excess items

Date: 2020-12-11

732/2020(KSEB/TRAC/CT/KFON/2020-21)

Filing of petition in the matter of prior intimation on implementation of KFON in compliance with directions in the Suo motu order

Date: 2020-12-07

730/2020 (DGC/AEE VI/Land/2014)

Travel Facility- An order issued by the Chief Coordinator, Land Management Unit raising the travel limit of the vehicle allotted to it

Date: 2020-12-07

731 /2020 (DGC/AEE VI/Galv /2014)

Hot dip galvanization of 6800 MT of 'A' poles fabricated at the Mechanical Facilities of KSE Board Ltd. having length up to 14m in single dip or double dip method

Date: 2020-12-07

729/2020 (Fin.IVB)/KFC-LT Loan/2020-21

Long Term Loan of ₹500Crore availed from M/s KFC - repayment of interest - Sanctioned Orders issued

Date: 2020-12-04

728/2020(D(D&IT)/D5/Scrap/2020-21/0001)

Disposal of unserviceable Teak Wood Pole scrap available at various Electrical Sections under Electrical Circle, Thiruvananthapuram- Single tender

Date: 2020-12-03

54/ 2020(Soura/ Consumer Agreement/ 2019-20)

Soura Project, Phase I-Authorising Assistant Executive Engineers to sign Soura Consumer agreement and issuing notification regarding subsidy programme- Approved

Date: 2020-01-24

1579/2015 (Estt.III/CR-Rules/2006)

Promotion of employees in workmen category to officer category - Implementing Performance Appraisal Reporting system - orders issued

Date: 2015-06-27

510/2010 (DPC II/AE/T&C of Supply.02/2009)

Guidelines for effecting service connections

Date: 2010-02-24

Volume – 1

Board Orders & Circulars Volume – 1

Date: 2010-01-25

Volume – 2

Board Orders & Circulars Volume - 2

Date: 2010-01-25

259/2010 (LA.V/5751/2009)

ISO Certification - Accreditation of Meter Testing Units of KSE Board with NABL - Engaging Consultancy

Date: 2010-01-25

3210/2009 (KSEB/TRAC/Comp(R)/20/07)

Tariff applicable to Ready Mix Concrete units

Date: 2009-12-18

2681/2009 (Plg.Com. 3472/97/09-10)

Interest on arrears accrued prior to 01.11.2008

Date: 2009-10-19

2624/2009 (PS-I/1027/2009)

Arrears of Dearness Allowance – Crediting to General Provident Fund Account – Extending of time limit

Date: 2009-10-14

2577/2009(FEMU/CDM/Hydro/2008)

Clean Development Mechanism-Development of H.E Projects- Pre-requisites with respect to PDD submission-Stakeholders meetings at project sites

Date: 2009-10-08

2448/2009(LAS.1/7791/2009)

Date of retirement of Employees of KSE Board - Government Order – Implementation

Date: 2009-09-22

2422/2009(Plg.Com 3842/07/KWA/Arrear/09-10)

Settlement of arrears in respect of M/s. Kerala Water Authority – Implementation of the Government Order dated 26.09.2008

Date: 2009-09-19

2192/2009 (KSEB/TRAC/COMP(R)/14/09)

Tariff applicable to Tea Blending & Packing Units - LT-VII(A) Commercial Tariff

Date: 2009-08-20

2081/09 (Plg.Com 4576/Waiver of MD/08)

Waiver of minimum demand charges/fixed charges for electricity in respect of all the closed LT/HT Industrial units and plantations - Implementation of the Government Order

Date: 2009-08-11

1817/2009(Plg.Com 4649/08/SC/09-10)

Realization of marginal cost and thermal surcharge in respect of M/s. Kerala Water Authority

Date: 2009-07-14

1779/2009 (IT/CU/168/RTIA/09-10)

Accepting applications, complaints etc. at the field offices - Acknowledgement receipt

Date: 2009-07-09

1766/2009 (PS1/2398/2009)

Dearness Allowance/Dearness Relief to Board employees/pensioners - Revision with effect from 01.01.2009

Date: 2009-07-07

1498/2009(DPC1/5/2008)

Government Departments and Public Sector Undertakings - Arrears of electricity charges - One Time Settlement - Surcharge - Time extension

Date: 2009-06-05

1396/2009(DPC1/C-GI-11/08)

Supply of power to Cellular towers-sharing of the same tower by different Service Providers - Clarification

Date: 2009-05-27

556/2009 (Plg.Com. 4439/02/08-09)

Cellular Mobile Towers – Providing electric connection under LT III tarif

Date: 2009-03-02

550/ 2009 (KSEB /TRAC /Fuel Surcharge

Withdrawal of thermal surcharge for energy consumption w.e.f. 01.03.2009 - order issued by KSERC- compliance

Date: 2009-03-02

339/09 (No.Plg.Com. 4653/08/LT/GNL/08-09)

Realization of marginal cost and fuel surcharge from consumers under Jalanidhi, Jaladhara, Beneficiary Committees etc. - Clarification requested by field officers