Board Orders

555/2023 [D(T&SO)/T4/LandPulikkal/2023-24]

Construction of 110 kV Substation at Pulikkal in Malappuram district - Acquisition of 0.8306 Hectares of land under LARR Act - Sanction accorded - Orders issued

Date: 2023-12-23

554/2023(D(T&SO)/T2/Punalur TSS/2023-24)

Providing connectivity at 110kV level to proposed 110kV Traction Substation at Punalur on deposit work basis for Railways - Issuing Technical Sanction

Date: 2023-12-23

549/2023(SEC-ES-SA3/2023/551)

Establishment - Special Casual Leave to KSEBL employees undergoing dialysis - Adoption of Government Orders- Orders issued

Date: 2023-12-21

548/2023(SOR-SA31/2023/1059)/61

Settlement of current charge arrears of M/s. P.V.Sadasiva Cinema (P) Ltd (LCN.No.6/6759) under OTS Scheme 2023 - Sanctioned - Orders issued

Date: 2023-12-21

542/2023(DGC/AEEV/Up-Sen/2015

Upper Sengulam Hydro Electric Project (24 MW/53.22 MU) - Tender Cum Auction for the sale and disposal of trees (220 Nos) located at various sites

Date: 2023-12-20

539 /2023/Vig/B2/100-182/2017/4601

Acceptance of recommendations of the Committee - Disbursement of pensionary benefits to retired officers against whom disciplinary proceedings are pending

Date: 2023-12-18

538/2023(DIRDIT-AE1/2023/8607)

Sabarimala Festival Season 2023-24 - Contingency expenditure to the staff posted for duty at Sabarimala and Nilakkal - Estimate - Sanctioned - Orders issued

Date: 2023-12-18

965/2023(GPC1/118/2004)

lmplementation of Pasukkadavu Small HEP (2X2 MW - 10.34 MU) by KSEB Ltd. Obtaining Administrative Sanction from the Government

Date: 2023-12-17

534/2023(DIRDIT-AE3/2023/6171)

Karuthalum Kaithangum Adalath 2023 - Petitions with direction of Hon. Ministers and petitions deserving special consideration - Sanction requested to execute the works

Date: 2023-12-14

520/2023(DGC/AEE I/CMD Note/2023)

Standard Operating Procedure (SOP) for investigation of Hydro Electric Projects - "Guidelines for Geological and Geotechnical Investigations of HEPs" - Approved

Date: 2023-12-08

522/2023 (DGC/AEEII/General/PG/2023)

Relaxation in Performance Guarantee for the execution of Public works in the state -Adoption of Government order in KSEBL

Date: 2023-12-08

519/2023(DIRTSO-AE4/2023/4428)

Hiring of vehicle (Diesel Jeep) with driver for the use of Transmission Construction Section, Chengannur under Transmission Circle, Alappuzha - Extension to two more years

Date: 2023-12-08

512/2023(DIRTSO-AE4/2023/4418)

Hiring of vehicle (Tempo Traveller) for the use of Transmission Section (Line Maintenance Section), Malappuram - Tender confirmation

Date: 2023-12-06

511/2023(DGC/AEEII/Seng. Penstock/2022)

Rectification and replacement of penstocks, butterfly valves, gate valves & allied works of Sengulam HEP - Time Extension

Date: 2023-12-06

507/2023(SOR-ST30/2023/1019)/39

Settlement of current charge arrears of M/s.Palappillil Specified Block Rubbers Pvt Ltd, Karukadam P O, Kothamangalam (LCN.No.25/3275) under OTS Scheme 2023

Date: 2023-12-04

508/2023(SOR-ST30/2023/1018)/38

Settlement of current charge arrears of M/s. Palode Paper Mills (P) Ltd, St. Mary's Estate, Kochuvila P O, Peringammala (LCN.No.21/3379) under OTS Scheme 2023

Date: 2023-12-04

501/2023(DGC/AEE IV/Dam Safety/Idukki Dam/2022)

KIFB-HILL HIGHWAY-Improvements to Peerumedu - Devikulam road 19/000 to 40/050 & Thodupuzha-Pulianmala road ch.85/500 to 92/167

Date: 2023-11-20

497/2023(SOR-SA26/2023/983)/142

Settlement of current charge arrears of M/s. Rohit Cots Pvt. Ltd., 'Narayana', Krishna Nagar, Poothole, Thrissur LCN.No.31/3410) under OTS Scheme 2023

Date: 2023-11-17

498/2023(SOR-SA17/2023/1012)

Settlement of current charge arrears of M/s. Pioneer Wood Products, Vengola (LCN.No.26/4760) under OTS Scheme 2023

Date: 2023-11-17

490/2023(SOR-SA31/2023/1007)/51

Settlement of current charge arrears of M/s. Kanprint Offset printers (LCN.No.13/8128) under OTS Scheme 2023

Date: 2023-11-16

488/2023(SOR-SA31/2023/990)/49

Settlement of current charge arrears of M/s. Chidambaram Tea Estate, Peermade (Marikkar Plantations Pvt. Ltd.) (LCN.No.16/1607) under OTS Scheme

Date: 2023-11-16

494/2023(DGC/AEEV/PES-Balance works/2018)

Pallivasal Extension Scheme (2X30 MW) - Balance Civil Works of Tunnel, Surge Shaft, Pressure Shaft, Penstock

Date: 2023-11-16

493/2023(DIRGE-AEE4/2023/327)

Pallivasal Extension Scheme (2x30 MW) HEP - Erection of supplied E&M equipment and supply and erection of BOP equipment - Request for the time extension of contract completion period

Date: 2023-11-16

495/2023(DIRGE-AEE4/2023/200)

Thottiyar 40 (1x10+1x30) MW HEP - Supply, Erection, Testing and Commissioning of Governor, Excitation, DCS and Protection Panels - Request for time extension to M/s. ABB India Limited

Date: 2023-11-16

489/2023(SOR/SA-28/2023/991)

Settlement of current charge arrears of M/s V - Mart Super Market, Vyttila, Ernakulam (LCN 20/4164) under OTS Scheme 2023

Date: 2023-11-16

496/2023(SOR/SA-31/2023/1004)/50

Settlement of current charge arrears of M/s. Thamara Rubbers (LCN.No.12/1247) under OTS Scheme 2023

Date: 2023-11-16

491/2023(SOR-SA31/2023/1014)/48

Settlement of current charge arrears of M/s. Saroj Steel Re Rolling Mill (LCN.No.26/2628) under OTS Scheme 2023

Date: 2023-11-16

486/2023(DIRGE-AEE4/2022/705)

Erection of supplied Electro Hydro Mechanical equipment in Powerhouse of Thottiyar 40(1x10+1x30) MW HEP – Request for time extension to M/s. Fitwell Constructions

Date: 2023-11-15

487/2023(DGE/G3/Enhancing Km limit GSD Malampuzha)

Enhancing monthly ceiling of vehicle attached to Generation Sub Division & Hiring of vehicle for the use at Generation Sub Division, Malampuzha

Date: 2023-11-15

484/2023(DGC/AEE-VI/BRPL/2014)

Barapole SHEP - Rectificaiton work of power canal of Barapole SHEP - Conducting Geophysical Investigation study through M/s PARSAN Overseas Pvt. Ltd., New Delhi

Date: 2023-11-14

482/2023 (TRAC-AEE1/2023/186)

KSERC Interim order in the matter of schedule of tariff and terms and conditions for retail supply of electricity by KSEBL and all other Licensees with effect from 01.11.2023 to 30.06.2024

Date: 2023-11-13

481/2023(SOR-SA31/2023/1001)

Settlement of current charge arrears of M/s.Kaypee Metals & Alloys (P) Ltd (LCN.No.6/3209) under OTS Scheme 2023

Date: 2023-11-13

476/2023(SOR-SA28/2023/1000)

Settlement of current charge arrears of M/s Ponmudi Paper Mills Ltd, Chalakkuzhy Building, Peroorkada, Thiruvananthapuram (LCN 15/1953) under OTS Scheme 2023

Date: 2023-11-13

477/2023(SOR-SA28/2023/988)

Settlement of current charge arrears of M/s Gopika Dairy Farm(LCN 19/3577) under OTS Scheme 2023

Date: 2023-11-13

480/2023(SOR/SA-28/2023/986)

Settlement of current charge arrears of M/s Two in One Storage Extrusions, 2/286D Okkal, Perumbavoor, (LCN 15/7301) under OTS Scheme 2023

Date: 2023-11-13

473/2023(SEC-ES-ST2/2023/476)

Establishment - Compassionate Employment Scheme - Appointment of dependents of KSEBL employees who die-in-harness - Select List for 07/2023 - Approved

Date: 2023-11-10

472/2023(CEREES-AEE4/2023/1772)

Appointment of EPC contractor for design as per site conditions, erection, testing & commissioning of Grid Tied Ground Mounted Solar PV Power plants at Brahmapuram, Kanjikode and Agali

Date: 2023-11-09

471/2023(DGC/AEE IV/Dam Safety/Desiltation/2023)

Desiltation of Reservoirs of KSEBL - Standard Operating procedure for the reservoirs of KSEBL- Modified in line with the SOP published by Government of Kerala

Date: 2023-11-08

468/2023(SCM/XT/AEE1/123/2022-23/Fdr & Tfr C&R Panels)

Bid for the supply of 33 kV Feeder and 33/11 kV Transformer Control & Relay Panels

Date: 2023-11-04

467/2023(Fin2(B)/SBI/e- Trade facility/2023-24)

E-Trade facility for opening LCs/ BGs on-line – Resolution – Sanctioned – Orders issued

Date: 2023-11-01