Board Orders
653 /2021(KSEB/TRAC/CG/Advocate fee/2021-22
Payment of Advocate fee - Sanction accorded - Orders issued
Date: 2021-09-14654 /2021 (KSEB/TRAC/FSP/29/FY2020-21)
Filing of fuel Surcharge petition for the period from April to June 2021 -sanctioned-Orders issued
Date: 2021-09-14652/2021 (25/AE2/2014/CE(PED))
Erection of Supplied Electro Hydro Mechanical Equipment and Supply and Erection of BOP Equipment of Pallivasal Extension Scheme Hydroelectric Project
Date: 2021-09-14651/2021 (Fin.2(B)/TMB/WCDL/2021-22)
Availing of WCDL of ₹75,00,00,000/- from M/s. Tamilnad Mercantile Bank Limited, Thiruvananthapuram - Sanctioned - Orders issued
Date: 2021-09-14646/2021 (LF.II/LD.I/19345/1998)
OS No. 88/2000 filed before the Hon'ble Subcourt, Thiruvananthapuram by KSEBL against M/s Sam Turbo Industries Pvt. Ltd., Coimbatore
Date: 2021-09-02645/2021(D(T&SO)/PSE/SRPC/SoE/2021-22
Sharing of expenditure of Southern Regional Power Committee (SRPC) Secretariat - Payment of Annual Expenditure for the year 2021-22 - Sanctioned - Orders issued
Date: 2021-09-01644/2021/CML-EE2-AEE-2/AKMP SHEP/2021-22/CE(C&T)
Anakampoil Small Hydro Electric Project (8MW) - Execution of PPA- Sanctioned - Orders issued
Date: 2021-08-31643/2021 (CE(C&P)/KSP-THDCL-Paivalike/2021-22
Procurement of power from THDC India Ltd's Solar PV Project of 50MW capacity at Paivalike in Kasargod Solar Park - Processing of Invoice - Sanctioned
Date: 2021-08-27642/2021 (PS.2 /EWF/GB/2021)
Order issued increasing Board Contribution to KSE Board Employees Welfare Fund (EWF)
Date: 2021-08-25640 /2021(DGC/AEE-II/DRIP/General/2021)
DRIP-"Supply, Installation, Testing, Commissioning, Training and Maintenance of Real Time Structural Health Monitoring & Early Warning System at various dams
Date: 2021-08-25641 /2021 (Sports Cell/VBM/50/2021)
Sports Cell - KSEB Volleyball (Men) team - Engagement of guest player - Sanctioned -Orders issued
Date: 2021-08-25639/2021 (SCM/XT/123/2019-20)
Supply of Towers including hot dipped galvanized bolts, nuts, earthing sets and all required accessories for 220kV & 110kV MC/DC line
Date: 2021-08-24637/2021 (D(D&IT)/D/AEC/Veh/473/2021)
Hiring of vehicle (mini lorry below 5 T) with driver for the use of TFRU, Palakkad under Electrical Circle, Palakkad - Sanctioned - Orders issued
Date: 2021-08-18636/2021 (Soura /Phase II Subsidy Scheme /2021-22)
Inviting tender for empanelment of EPC contractors for Roof Top Solar plants in Soura Phase -II subsidy project for 1,2 and 3 kW plants -Modification in Tender clauses
Date: 2021-08-18635/2021(DGC/AEEIV/PORGL/2014)
Implementation of Poringalkuthu Small Hydro Electric Project ( 1 x 24 MW) - Availing loan from M/s Rural Electrification Corporation Limited
Date: 2021-08-18634 /2021/D(T&SO)/ T3/ Tdpzha/Merolla Steels /2021-22
110kV Sub Station Muvattupuzha- Supply of Power to the extent of 5MVA to M/s Metrolla Steels Pvt. Ltd., Paipra under deposit work basis
Date: 2021-08-18632/ 2021/(DGC/AEEIII/Chinnar/2014)
Execution of Civil Works (Phase I )of Chinnar Small Hydro Electric Project (2x12 MW) -Contract with M/s.PGCCPL - ARYACON Consortium, Aiswarya Towers, Kochi
Date: 2021-08-18633/2021/ D(T&SO)/T3/Koodamkulam/2021-22)
Edamon - Kochi 400kV Transmission Line - Fund requirement for TSA & Line Corridor Compensation as on 30.06.2021 - Sanction accorded
Date: 2021-08-18638/2021/CW/IDP-Training Centre
Consultancy Wing- Upgradation of Industrial Development Plot at Poovanthuruthu, Kottayam under MSE- CDP Scheme
Date: 2021-08-18631/2021 (Soura/Phase II-Subsidy Scheme/2021-22)
Administrative Sanction for procuring Net meters for Soura Phase II subsidy scheme -Order Issued
Date: 2021-08-17628 /2021 (DGC/AEE VI/PSR /2014)
Pazhassi Sagar SHEP-7.5MW (3x2.5MW)-25.16MU- Hiring a vehicle for official purpose for the Project Manager, Pazhassi SHEP- Sanctioned
Date: 2021-08-17623/2021 (CAPs/P2/IPDS & R-APDRP/Performance BG/2021-22)
Relief measures due to Covid Pandemic - Revising Performance Bank Guarantee @3% for supply/work Contracts under Central schemes
Date: 2021-08-17630/2021 (SOR/HTB-6/6759/2021-22)
Request for granting installment facility for the repayment of Electricity charges due - M/s P.V. Sadasiva Cinema with LCN 6/6759 -Sanctioned
Date: 2021-08-17626/2021 (Fin.2(C)/IREDA-STL/2021-22)
Availing of Short Term Loan from M/s IREDA - Rs.300 Crore - Sanctioned - Orders issued
Date: 2021-08-17625/2021 (Fin.1/Credit/Misc/2021-22)
Periodical Surrender of Earned Leave - Deferred - Sanctioned - Orders issued
Date: 2021-08-17629 /2021 (DGE/G3/Generation-SCADA/2021-22)
Implementation of SCADA visibility in all Generating stations - setting up of a centralized data availability - Sanction Accorded
Date: 2021-08-17627 /2021 (DGC/AEEVII/Misc/2021)
KSEB Provision of sanitary facility of offices - Regarding
Date: 2021-08-17624/2021 (No CP/Plg.III/Business Plan - Vision & Mission /2021)
Formulation of Vision & Mission Statement - Constitution of Committee - Sanctioned -Orders issued
Date: 2021-08-17622/2021 (DGC/AEEV/Up-Sen/Gen/2021)
Upper Sengulam HEP(1x24MW) - Hiring of a jeep on contract basis - Sanctioned -Orders issued
Date: 2021-08-16621 /2021(KSEB/TRAC/CG/Advocate fee/2021-22)
Payment of Advocate fee - Sanction accorded - Orders issued
Date: 2021-08-16620/2021/CW/KIIFB/GNL
Consultancy Wing - Urgent requirement of staff - Posting of Employees - Sanctioned - Orders issued
Date: 2021-08-16619/2021 (D(D,IT&HRM)/DCC 19/2021-22/4)
The Electricity (Rights of Consumers) Rules 2020 - Preparation of application form so as to include agreement as part of it (Clause 4 (10)) - Proposal - Sanctioned
Date: 2021-08-13618/2021 (D (D,IT&HRM)/DCC 19/2021-22/2)
The Electricity (Rights of Consumers) Rules 2020 - Enabling a help desk at Corporate level, a single point of contact to facilitate the consumers
Date: 2021-08-13617/2021 (D(D,IT&HRM)/DCC 19/2021-22/3)
The Electricity (Rights of Consumers) Rules 2020 - Constitution of CGRF offices from Subdivision level onwards, appellate forums and monitoring mechanisms
Date: 2021-08-13616 /2021/D(T&SO)/T4/Pugalur-Thrissur compensation/2020-21
320kV HVDC Pugalur- Thrissur transmission line- Compensation to be given as per the Special compensation package for the Tower Standing Area- Sanctioned
Date: 2021-08-13615/2021/D(T&SO)/T6/TransGrid - Gen/2021-22
Testing and commissioning of Substation Automation System and Power system protection systems at newly constructed substations under TransGrid 2.0
Date: 2021-08-13614/2021(D(D&IT)/D5/Cable-Poles/2021-22/0001)
Cable drawal along electric poles of KSEBL – General policy for laying optical fibre cable through the distribution poles of KSEBL
Date: 2021-08-13613/2021 (IT/CU/Start up/Soura Ph II/2021-22)
Engaging Start Ups for the development of Mobile Applications - Implementation of Roof Top Solar project - Development of Mobile application
Date: 2021-08-13606/2021(No.IT/CU/UPI- Ingenico/2021-22)
Online Bill Payment-UPI- Integration with M/s Ingenico Ltd - Sanctioned - Orders issued
Date: 2021-08-13608/2021 (D (D,IT&HRM)/DCC 19/2021-22/1)
Electricity (Rights of Consumers) Rules 2020 - Facility of scanning and uploading hard copy applications and issuing registration numbers (Clauses 4(5) & 4(7))
Date: 2021-08-13