Board Orders

303/2021 (SOR/AMU 8/HTB 32/3542/2021)

M/s. Meenachil Co-Operative Rubber Marketing & Processing Co-Operative Society (LCN 32/3542) - Settlement of current charge arrears - Under OTS Scheme 2021

Date: 2021-05-05

300/2021 (SOR/AMU4/HTB 21/3379/2021)

Palode Paper Mills (LCN 21/3379) - Settlement of Current charge arrears under OTS Scheme 2021 - Sanctioned - Orders issued

Date: 2021-05-05

321/ 2021(D (D&IT)/ D-1/ General / 2020-21/ 0014)

Reducing contract demand from 175 kVA to 145 kVA and enhancing connected load from 479.7 kW to 528.911 kW in favour of M/s Hotel Aida, Kottayam

Date: 2021-05-05

315/2021 (D(D&IT)/D/AEC/Rent/124/2021)

Shifting and fixation of rent for the building accommodating Electrical Section, Tuvvur under Electrical Circle, Nilambur - Sanctioned - Orders issued

Date: 2021-05-05

314/2021 (D(D&IT)/D/AEC/Veh/78/2021)

Hiring a vehicle (Tempo Traveller) for fitting, mounting and transporting the cable fault locator with accessories attached to APDRP Construction Division, Ernakulam

Date: 2021-05-05

313/2021 (D(D&IT)/D/AEC/Tree cutting/197/2021)

Disposal of 121 numbered trees in the site of 1.5 MW solar power project at Nenmara under Electrical Circle, Palakkad - Sanctioned - Orders issued

Date: 2021-05-05

318/2021 (SOR/AMU 7/HTB 25/22/2235/2021-22)

Settlement of current charge arrears of M/s. Kerala Ceramics Ltd. (LCN 25/22/2235) - Under OTS Scheme 2021 – Sanctioned

Date: 2021-05-05

317/2021 (SOR/AMU 7/HTB 11/1104/2021-22

Settlement of current charge arrears of M/s. Kerala Ceramics Ltd. (LCN 11/1104) -Under OTS Scheme 2021 - Sanctioned - Orders issued

Date: 2021-05-05

299/2021 (SOR/AMU 7/HTB 11/1105/2021-22)

Settlement of current charge arrears of M/s. Kerala Ceramics Ltd. (LCN 11/1105) -Under OTS Scheme 2021 - Sanctioned - Orders issued

Date: 2021-05-05

294/2021(D (D& IT) /D-1/ Tender /2021-22/ 0001)

Awarding PMU works under Electrical Section, Marayamuttom - single valid bid on re-tendering - sanctioned

Date: 2021-05-04

289 /2021(D (D, IT&HRM)/D-1/ Arrears /2021-22/0001)

Enhancement of connected load in case of the HT consumer M/s Star Industries, Ayoor (LCN 12/6765) with arrear dispute pending disposal

Date: 2021-05-04

282 /2021(D(T&SO)/T7/Vazhoor Land/21-22)

Construction of 110kV Substation at Vazhoor- procurement of land- sanction accorded for payment

Date: 2021-05-04

292/2021 (VIG/B2/4301/2016)

Disciplinary action initiated against Sri.Joseph.T.X, former Senior Assistant (Removed from Service), Electrical Section, Thengana -Review Petition - Disposed off

Date: 2021-05-04

291 /2021 (VIG/A3/7246/2008)/1041

Disciplinary action initiated against Sri.Santhosh.P.V, Junior Assistant (Removed from Service) Electrical Circle, Thiruvananthapuram - Mercy Petition - Disposed off

Date: 2021-05-04

290/2021(VIG/B2/5045/2019)

Recovery Proceedings initiated against Sri.Radhakrishnan.K.P, Senior Superintendent, Electrical Section, Pallom(formerly Senior Assistant, Poochakkal)

Date: 2021-05-04

296 /2021 (No. DGE/G3/General/2021-22)

Land under Generation Division, Chithirapuram - handing over of responsibility to the Civil wing - Sanction Accorded

Date: 2021-05-04

281/2021/ No. D(T&SO)/PSE/MiPower/2020-21

'MiPower' system study software - Annual Software Support Contract (ASSC) - Sanction accorded- Orders issued

Date: 2021-05-04

287/2021 (PS1/2942/2019)

Shri. Kochukutan who was a lineman of S.L. Puram Electrical Section under Cherthala Electrical Division, met with an accident

Date: 2021-05-04

288/2021 (D (D&IT)/D6-AE3/EoDB/2020-21)

BRAP 2020- Minimizing regulatory compliance burden on industry/ business and on citizens in Power Sector – waiver of conditions for laying of HT cables

Date: 2021-05-04

297/2021 (SOR/AMU 8/HTB 18/7668/2021)

M/s. High-Tech Feed Mixing Plant, (KEPCO), Mala, KSPDC LTD, Kuzhur (LCN 18/7668) - Settlement of current charge arrears - Under OTS Scheme 2021 -Sanctioned

Date: 2021-05-04

285/2021 (SOR/AMU 5/HTB 6/3209/2020-21)

Settlement of current charge arrears of M/s. Kaypee Metals & Alloys (P) Ltd. (HTB 6/3209) - Under OTS Scheme 2021 - Sanctioned - Orders issued

Date: 2021-05-04

293 /2021 (LMU/Technopark-94/2020-21/40)

Land Management Unit (LMU)- Land Transfer Agreement between Techno Park & KSEBL -Remittance of TDS prior to land registration- Execution of Idemnity Bond

Date: 2021-05-04

298/2021 (SOR/AMU 7/HTB 8/802 & 11/1107/2021)

Settlement of current charge arrears of M/s. Travancore Chemicals & Manufacturing Co. Ltd. (HTB 8/802) TCM, Kalamassery (EHT 66 KV Unit) and HT 11/1107

Date: 2021-05-04

286/2021 (SOR/AMU.2/HTB.15/4222/2020-21)

Settlement of current charge arrears of M/s. PNM Hospital (HTB.15/4222), Kattakkada, Thiruvananthapuram - Under OTS Scheme 2021 - Sanctioned

Date: 2021-05-04

284/2021 (SOR/AMU.2/HTB.25/3979/2021-22)

Settlement of current charge arrears of M/s. Sharjah Tower (HTB.25/3979), Guruvayoor -Under OTS Scheme 2021 - Sanctioned

Date: 2021-05-04

283/2021 (SOR/AMU 2/HTB 15/1953/2020-21)

Settlement of current charge arrears of M/s. Ponmudi Paper Mills (P) Ltd. (HTB 15/1953), Chalakuzhy Building, Peroorkada - Under OTS Scheme 2021 -Sanctioned

Date: 2021-05-04

295/2021 (CE/SCM/Trans contract/B&S Din/2018-19)

Clearing of materials for all fabrication works at Angamaly and other MF units from trailers, lorries and low bed vehicles

Date: 2021-05-04

280/2021(CE/SCM/XC/Fab.materials/Tender/2020-21)

Procurement of steel item for the targeted works under K.S.E.Board Limited - Supply at CMF, Pallom, MF1,Angamaly & MF2, Kolathara

Date: 2021-05-04

279 /2021(D(GE)/G2/Adyanpara/2021-22)

Adyanpara SHEP - Retaining the place of Assistant Engineer (Civil) till the completion of flood related works - Sanctioned - Orders issued

Date: 2021-05-03

276/2021(D(D&IT)/D5/PG/2021-­22/0001)

Amendment in the Board Order for the re­organization of SCADA Control Room, SCADA Maintenance Team, RMU Maintenance Team and UG Cable Wing

Date: 2021-04-30

278/2021 (D (D&IT)/D6-AE1/Dyuthi /2020-21)

Entrusting Subdivision AEE's for tendering and award of all PMSU works and entrusting PMU team for monitoring and review of all Dyuthi works

Date: 2021-04-30

273 /2021(KSEB/TRAC/CG/JPL 584 MP 2020/2020-21)

Petition filed by Jhabua Power Limited before the CERC - Engaging Adv.Prabhas Bajaj - Sanction accorded -Orders issued

Date: 2021-04-30

277/2021 (DGE/G1/Kakkad/Unit 1/2021-22)

Kakkad HEP-Replacement/repair and Re-insulation of Stator coil of 25 MW Unit 1 Generator at Kakkad Power Station, Seethathode

Date: 2021-04-30

274 /2021 (No. DGE/G3/Vehicle/2021-22)

IHEP- Procurement of a new vehicle for the use of Water Conducting System Mace. Sub Division, Moolamattom -Sanction Accorded

Date: 2021-04-30

272/2021(IT/Proj/IPDS/ERP/2020-21)

Implementation of Enterprise Resource Planning (ERP) in KSEBL under Partial turnkey basis /departmental execution - Formation of Functional committees

Date: 2021-04-30

275/2021 D(D&IT)/D-1/NHAI/2021-22/0001)

NHAI-Shifting of utilities along both sides of the National Highway in connection with the highway widening works for different reaches under Electrical Circle, Kollam

Date: 2021-04-30

270/2021(DGC/AEE-II/DRIP/IDK/2015)

Idukki HEP-Inaugural Function of new Division Office building, Dam monitoring server and new IB at Vazhathope by Hon'ble Minister for Electricity

Date: 2021-04-28

269/2021(KSEBL/TRAC/G/EV Stations /2020-21)

Electricity tariff for Private charging stations at residences and offices - sanctioned-orders issued

Date: 2021-04-28

271/2021(D(D&IT)/D5/PG/2021-2022/0001)

EMD exemption for Kerala Government Public Sector Undertakings / MSMEs with Udyog Adhar Registration for purchases made through quotations

Date: 2021-04-28

268/2021(IT/CU/CSC/2021-22)

Online payments- M/s CSC - Renewal of Agreement with KSEBL- Reducing threshold limit - Sanctioned - Orders issued

Date: 2021-04-26