Board Orders
691 /2021 [CE(REES)/KSEB EVCS/2020-21]
Replacement of hired vehicles/ SUVs of KSEBL with Electric Vehicles in a phased manner starting with Executive Engineers and Officers
Date: 2021-09-22693/2021 (LF.II/LD.I/4483/2014)
OS No. 81/2014 filed before the Hon'ble Subcourt, Thiruvananthapuram by M/s York Construction Engineers and Contractors against KSEBL
Date: 2021-09-22692/2021 (AO (Law)GI/13441/2016-17)
Conduct of cases involving Kerala State Electricity Board Limited before the Subordinate Courts and other Quasi-Judicial Fora- Appointment of Standing Counsel
Date: 2021-09-22690/2021 (CE-IT/RITU/KFON/OPGW/2021-22)
KFON Project - Replacing the portion of 24 Fibre OPGW already laid / proposed to be laid by KSEBL with 48F OPGW- Sanctioned - Orders issued
Date: 2021-09-22689/2021/D(T&SO)/T2/Klm-Ktiym Interlinking/Road cutting/2021-22
Interlinking 110kV GIS, Kollam with 110kV Substation, Kottiyam with 110kV XLPE UG cable and Optical Fibre Cable under Transmission Circle, Kottarakkara
Date: 2021-09-20688/2021 (D(D&IT)/D4/ Adalath/ 2020-21/ 0022)
Petition received at the Sandhvana Sparsham Adalath conducted on 08/02/2021 at Palakkad -shifting of 11 kV posts and lines
Date: 2021-09-20687 /2021/D(T&SO)/T4/SO/PGCIL-AMC/2020-21)
Arranging Annual Maintenance Contract for SDH and PDH equipments with the OEM- Sanctioned- Orders issued
Date: 2021-09-20686 /2021/D(T&SO)/T7/Kuttikol-land/2021-22
Proposal for 110kV Substation, Kuttikol- Transferring Revenue land on Lease -sanction accorded -Orders issued
Date: 2021-09-20685 /2021/D(T&SO)/T5/Kinfra-Velliyamparamba/2021-22
Deposit work in favour of KINFRA Industrial Park, Mattannur, Kannur- Construction of new 110kV Substation at Velliyamparamba
Date: 2021-09-20684/2021/SCM/XD/AEE2/ABT/2021-22
Constitution of Technical Committee for prequalification of ABT meters - Sanctioned -Orders issued
Date: 2021-09-20683 /2021 (DGE/G3/General /EOT Crane/2021-22)
Training Programme for EOT Crane operators in power stations - Sanction accorded- Orders issued
Date: 2021-09-18682/2021 (DGE/G3/PSDF /2021-22)
PSDF Scheme -Site survey, Planning, Design, Engineering, Manufacturing /Integration, Testing, Supply and commissioning of Centralized Monitoring AMR system
Date: 2021-09-18680 /2021 (DGE/G3/General /2021-22)
Preliminary inquiry report on tripping of all generators at Idukki Power House on 12.08.2021 at 7.28 PM - Circular - Approved - Order issued
Date: 2021-09-18681/2021/D(T&SO)/T3/klsy/KMRL/2021-22
Deposit works in favour of M/s. KMRL for raising the height of EHT line crossing Metro phase 2 alignment
Date: 2021-09-18661/2021 (EB1(a)/AE(Ele)/CCC/2021)
Compliance of the direction of the Honourable High Court of Kerala dated 10.09.2021 in Contempt of Court Cases No. 853/2021, 878 /2021 & 885 /2021
Date: 2021-09-17679/2021 (DGC/AEE VI/Pole Casting /2021)
Pole casting works - setting up of new departmental pole casting yards and maintenance of existing yards -streamlining of operations -Sanctioned
Date: 2021-09-17677/2021 (D(D&IT)/D/AEC/Rent/514/2021)
Shifting and fixation of rent for the building proposed for accommodating Electrical Sub Division and Electrical Section, Muttungal under Electrical Circle, Vatakara
Date: 2021-09-17671/2021(CE(C&T)/CML-EEI-AEEVI/NLC-Talabria/2021-22)
Talabira Pit Head Power Project - New proposal - Sanctioned - Orders issued
Date: 2021-09-17669/2021/D(T&SO)/T2/RKI-Kuttanadu Package-Kavalam/2021-22
Rebuild Kerala Initiative (RKI) of the Government of Kerala - Kuttanad Package - Construction of new 110kV Gas Insulated Substation (GIS)
Date: 2021-09-17666/2021/D(T&SO)/T2/Complaints-TVPM/2021-22
Construction of 110kV Line from Pothencode to Nedumangad - Complaint on Non payment of Compensation amount for Land Diminution Value
Date: 2021-09-17663/2021(DGC/AEE-II/Desiltation/2015)
Desiltation of Reservoirs of KSEBL - Approval for Standard Operating Procedure for reservoirs of KSEBL
Date: 2021-09-17662 /2021 (CSC/ FTD/ Innovation - AE 2/2021-22)
Order issued regarding implementation of Manufacturing unit for Innovative Devices, Equipments & Accessories (MIDEA) scheme
Date: 2021-09-17672 /2021 (Sports Cell/ BBW/92/2021)
Sports Cell - Treatment for injury occurred to Smt.Grima Merlin Varghese, member of the KSEB Basketball (Women) team while participation in the Common Wealth Games
Date: 2021-09-17667/2021/D(T&SO)/T7/SR/2021-22
Cutting and removal of 4Nos of trees standing in the proposed site for the Transgrid down stream work at 110kV Substation premises, Kunnamkulam
Date: 2021-09-17665/2021 (CE-IT/RITU/KFON/MoU/2021-22)
KFON Project - Execution of Tripartite Agreement between KSITIL, KSEBL & M/s. BEL for Package B to avoid double taxation issue - Sanctioned - Orders issued
Date: 2021-09-17676 /2021 (DGE/G3/SCRAP/2021-22)
Disposal of old and unserviceable 18 MW, 11 kV Generator machine 1, 2, 3 available at Sholayar HEP- Survey Reporting - Sanction accorded - Orders issued
Date: 2021-09-17675/2021 (DGE/G3/IHEP/1st stage Spare Runner /2021-22)
IHEP-Procurement of spare runner for 1st stage machines - Administrative Sanction accorded -Orders issued
Date: 2021-09-17670 /2021 (12/AE3/2012/CE(PED))
Purchase of 1 No 36.67 MVA and 1 No. 12.5MVA 11kV/220kV 3 phase Generator transformers for Thottiyar Hydro Electric Project - Extension of delivery period
Date: 2021-09-17664/2021(CE(C&P)/CML-EEI-AEEVI/WTE-Kozhikode/2021-22)
Waste to Energy Project at Kozhikode -PPA-Execution - Sanctioned - Orders issued
Date: 2021-09-17668/2021(CEIT/RITU/DC-DR/2021-22)
Maintaining the physical infrastructure of the Data Centre (DC) and Disaster Recovery Centre of KSEBL at Infopark, Cherthala through OEMs -Orders Issued
Date: 2021-09-17678/2021(PRMC-1/1491/Malayala Manorama/2021)
Public Relations Department – Malayala Manorama Newspaper – Renewal of Tender Advertising rates – order is issued allowing
Date: 2021-09-17673/2021(PR/MC-2/1434/KSRTC/2021)
Department of Public Relations - KSRTC - RFID Card -Sponsorship - Sanctioning order is issued
Date: 2021-09-17674 /2021(DGC/AEE-III/MKLM/LA/2014)
Mankulam HEP (2x20MW) - Land Acquisition - Payment for land and structures-Sanctioned- Orders issued
Date: 2021-09-17658/2021/Fin.2(B)/BOB/WCDL/2021-22
Availing of Working Capital Demand Loan of ₹200Crore from Bank of Baroda - Sanctioned -Orders issued
Date: 2021-09-16657/2021(D(D&IT)/D5/CablePoles/2021-22/0003)
Request of M/s. Jio Digital Fibre Pvt Ltd for extension of cable drawal permission over 45,449 numbers of KSEBL poles and permission for drawing cables
Date: 2021-09-16655/2021 (DGE/G1/Sabarigiri Unit 4/2021-22)
Sabarigiri HEP - Revival of 60 MW Unit No.4 Hydro Turbine Generator under shut down due to inherent problems - Entrusting M/s NHPC as Owner's Engineer
Date: 2021-09-16660 /2021 (DGE/G3/EMSD-Vehicle/2021-22)
Procurement of a 17 seat Traveler type vehicle for the use of Equipment Monitoring Sub Division (EMSD), Moolamattom - Sanction Accorded
Date: 2021-09-16653 /2021(KSEB/TRAC/CG/Advocate fee/2021-22
Payment of Advocate fee - Sanction accorded - Orders issued
Date: 2021-09-14654 /2021 (KSEB/TRAC/FSP/29/FY2020-21)
Filing of fuel Surcharge petition for the period from April to June 2021 -sanctioned-Orders issued
Date: 2021-09-14652/2021 (25/AE2/2014/CE(PED))
Erection of Supplied Electro Hydro Mechanical Equipment and Supply and Erection of BOP Equipment of Pallivasal Extension Scheme Hydroelectric Project
Date: 2021-09-14