Board Orders
332/2021(No.IT/CU/Online Promotion/2021-22)
Promotion of Digital transactions in KSEBL - Extension for waiver of application fee of new service connection applications submitted online- Sanctioned
Date: 2021-05-06330 /2021 (No. DGE/G3/IHEP-Excitation Transformer/2021-22)
IHEP- Design, Engineering, Manufacturing and Supply at site 4 Nos. of dry type cast resin exciter transformers for the first & second stage units at Moolamattom
Date: 2021-05-06329 /2021 (No. DGE/G3/Idamalayar-Battery/2020-21)
Idamalayar HEP - Supply, installation and commissioning of 220V(110 cells),400AH Plante type Lead acid battery set -proprietary item of M/s Exide Industries Ltd.
Date: 2021-05-06328/2021 (Estt.v/925/2021)
Order issued by the Government of Kerala dated 11.02.2021 increasing the wages of daily wage/ contract employees
Date: 2021-05-06339/2021(DGC/AEE V/Keerithodu/2019)
Keerithodu SHEP (2x6 MW- 27.65 MU)- Administrative Sanction - Accorded - Orders issued
Date: 2021-05-06338/2021 (DGC/AEEV/Marmala/2014)
Marmala Small Hydro Electric Project (7 MW/23.02 Mu) - Land acquisition - Remittance of contingency charge - Sanctioned - Orders issued
Date: 2021-05-06336/2021 (Estt.II/25/2019)
Establishment - Revision of qualification for recruitment to the post of Sub Engineer (Electrical) under 30% direct recruitment quota - Sanctioned - Orders issued
Date: 2021-05-06326/2021 (Estt.I/5789/2020)
Establishment - Conversion of Earned Leave against Special Disability Leave in respect of Sri.Premachandran. N, Lineman Grade I, Electrical Section, Kutiady
Date: 2021-05-06324/2021 (Estt.II/4290/2019)
Establishment - Appointment to the post of Assistant Engineer (Civil) under 10% in-service quota - Enhancing the upper age limit for appointment to 50 years
Date: 2021-05-06323 /2021 (KSEB/TRAC/FSP/29/FY2020-21)
Filing of fuel Surcharge petition for the period from January to March 2021 -sanctioned-Orders issued
Date: 2021-05-06342/2021 (IT/CU/FMS-RAPDRP/2020-21)
RFP for providing FMS with AMC for the Data Centre, DR Centre and MPLS Network- Issue of Letter of Award- Sanctioned- Orders issued
Date: 2021-05-06331 /2021(IT/CU/Data Dump/2020-21)
Requirement of Data Dump for Data Analysis-Request from Resident Audit Officer of Accountant General - Sanctioned - Order issued
Date: 2021-05-06335/2021 (SOR/AMU 3/5/5812/OTS 2021/2020-21)
Settlement of current charge arrears of M/s. Ashiyana Filament & Ropes (LCN 5/5812) under OTS Scheme 2021 – Sanctioned - Orders issued
Date: 2021-05-06333/2021 (SOR/AMU 3/5/521/OTS2021/2020-21)
Settlement of current charge arrears under OTS Scheme 2021 - M/s. Meenachil Rubber Marketing & Processing Co-operative Society Ltd. (LCN 5/521) - Sanctioned
Date: 2021-05-06322/2021(VIG/B3/3097/2020)
Disciplinary action initiated against Sri. Mohandas.S, Senior Assistant, Electrical Section, Thottabhagam (formerly Electrical Section, Mallappally) -Review petition
Date: 2021-05-05319 /2021/D(T&SO)/T4/SO/Optic Fibre Leasing/2019-20)
Leasing of dark fibre - Extension of lease agreement- Sanctioned - Orders issued
Date: 2021-05-05311 /2021/D(T&SO)/T4/SO/Appreciation-Mobile App/21-22
Introduction of indigenously developed Mobile App for real time monitoring of grid- Award of Good Service Entry- Approved
Date: 2021-05-05310/2021/D(T&SO)/T2/NHAI/2021-22
Shifting of Utilities / Providing UG cables for EHT lines coming under the package corridor of National Highway Authority - Consent for according Administrative Sanction
Date: 2021-05-05308 /2021(D(T&SO)/T7/Kavalam Land/21-22)
Rebuild Kerala Initiative -110kV Substation Kavalam- Procurement of land for the construction of new 110kV GIS Substation at Kavalam
Date: 2021-05-05304 /2021(IT/CU/Ongrid Solar Refund/2020-21)
Refund to consumer of applicant - settlement of banked energy, registration fees and other eligible refunds - process automation-Sanctioned
Date: 2021-05-05312/2021 (D(D&IT)/D-2/Santhwanasparsham/0001/2021-22)
Petition received from Sri.Gayan T.S, Thilayaparambil H, Eloor, Aluva, for shifting of line passing through his property, in the Adalath 2020
Date: 2021-05-05309/2021 (D(D&IT)/D-2/Santhwanasparsham/0003/2021-22)
Petition received from Sri. Abdul Rasheed, Chittothayil House, Pallam, Thrissur in Santhwanasparsham Adalath - Shifting of line - Sanction Accorded
Date: 2021-05-05305/2021 (D(D&IT)/D-2/Santhwanasparsham/0004/2021-22)
Petition received from Sri.Umar Mukthar, Kaaruvilli House, Vengola in the Santhwanasparsham Adalath - Shifting of line - Sanction Accorded - Orders issued
Date: 2021-05-05320/ 2021(D(D&IT)/D5/Cable-Poles/2020-21/0001)
Cable drawal along electric poles of KSEBL by Cable TV Operators/ Others-clarification in interest for installment and delayed payments
Date: 2021-05-05307/2021(GPC1 /118/2004)
Pasukkadavu Small Hydro Electric Project (2x2 MW- 10.34 MU) - Administrative Sanction -Accorded - Orders issued
Date: 2021-05-05306 /2021 (DGC/AEE VI/CHKN- 1 /2014)
Chathankottunada Stage I SHEP (2x2.5MW,12.06 MU)- Administrative Sanction Accorded-Orders issued
Date: 2021-05-05302/2021/D(T&SO)/T5/Reliance/2020-21
Extension of period of retaining ADSS for further period of 1 year (24-3-2021 to 23-3-2022) along Nallalam - Kaniyabetta 220kV EHT line
Date: 2021-05-05301/2021/D(T&SO)/T6/Sabari Package/2020-21
TransGrid 2.0 - Sabari Substation Package - Construction of 220kV GIS Substations at Pathanamthitta and Kakkad - Awarding of work - Sanction Accorded
Date: 2021-05-05316/2021 (SOR/AMU 8/HTB 3/3693/2021)
M/s. Trivandrum International Health Service Ltd. (LCN 3/3693) - Settlement of Current charge arrears - Under OTS Scheme 2021 - Sanctioned - Orders issued
Date: 2021-05-05303/2021 (SOR/AMU 8/HTB 32/3542/2021)
M/s. Meenachil Co-Operative Rubber Marketing & Processing Co-Operative Society (LCN 32/3542) - Settlement of current charge arrears - Under OTS Scheme 2021
Date: 2021-05-05300/2021 (SOR/AMU4/HTB 21/3379/2021)
Palode Paper Mills (LCN 21/3379) - Settlement of Current charge arrears under OTS Scheme 2021 - Sanctioned - Orders issued
Date: 2021-05-05321/ 2021(D (D&IT)/ D-1/ General / 2020-21/ 0014)
Reducing contract demand from 175 kVA to 145 kVA and enhancing connected load from 479.7 kW to 528.911 kW in favour of M/s Hotel Aida, Kottayam
Date: 2021-05-05315/2021 (D(D&IT)/D/AEC/Rent/124/2021)
Shifting and fixation of rent for the building accommodating Electrical Section, Tuvvur under Electrical Circle, Nilambur - Sanctioned - Orders issued
Date: 2021-05-05314/2021 (D(D&IT)/D/AEC/Veh/78/2021)
Hiring a vehicle (Tempo Traveller) for fitting, mounting and transporting the cable fault locator with accessories attached to APDRP Construction Division, Ernakulam
Date: 2021-05-05313/2021 (D(D&IT)/D/AEC/Tree cutting/197/2021)
Disposal of 121 numbered trees in the site of 1.5 MW solar power project at Nenmara under Electrical Circle, Palakkad - Sanctioned - Orders issued
Date: 2021-05-05318/2021 (SOR/AMU 7/HTB 25/22/2235/2021-22)
Settlement of current charge arrears of M/s. Kerala Ceramics Ltd. (LCN 25/22/2235) - Under OTS Scheme 2021 – Sanctioned
Date: 2021-05-05317/2021 (SOR/AMU 7/HTB 11/1104/2021-22
Settlement of current charge arrears of M/s. Kerala Ceramics Ltd. (LCN 11/1104) -Under OTS Scheme 2021 - Sanctioned - Orders issued
Date: 2021-05-05299/2021 (SOR/AMU 7/HTB 11/1105/2021-22)
Settlement of current charge arrears of M/s. Kerala Ceramics Ltd. (LCN 11/1105) -Under OTS Scheme 2021 - Sanctioned - Orders issued
Date: 2021-05-05294/2021(D (D& IT) /D-1/ Tender /2021-22/ 0001)
Awarding PMU works under Electrical Section, Marayamuttom - single valid bid on re-tendering - sanctioned
Date: 2021-05-04289 /2021(D (D, IT&HRM)/D-1/ Arrears /2021-22/0001)
Enhancement of connected load in case of the HT consumer M/s Star Industries, Ayoor (LCN 12/6765) with arrear dispute pending disposal
Date: 2021-05-04