Board Orders
743 /2020 (D (D, IT&HRM)/ D-1/ Safety /2020-21/0002)
Shifting of unsafe electrical line at the expense of the Board - representations from Smt. Shijitha, Punnalath Veedu, Kalluvathukkal
Date: 2020-12-17746 /2020 (D (D, IT&HRM)/D-1/General/2020-21/0017)
Recommendation of the Deputy Chief Engineer, Electrical Circle, Kattakkada for a good service entry to Sri Sabu F, Sub Engineer
Date: 2020-12-17744 /2020 (D(D,IT&HRM)/D-2/Adalath/0022/2020-21)
Petition received from smt. Sheela George, Popular Marbles, Muringoor in Vydyuthi Adalath 2020-Withdrawal of demand
Date: 2020-12-17742 /2020(D(T&SO)/T7/SR/2020-21)
Construction of 66kV Substation Ambalavayal in 110kV parameter auction of trees in the RoW through the land owned by ITDP
Date: 2020-12-17741/2020 D(G-E&SCM)/GL/2020-21)
Manufacturing of PSC poles - Quality issues - Departmenal Supervision - Sanctioned
Date: 2020-12-17745/2020 (D (D, IT&HRM)/D-1/OTS/2019-20/0002)
Settlement of arrears of Consumer No. 1156241003522, M/s Hotel Maharani, Pala under OTS scheme 2019- ratification
Date: 2020-12-17740/2020 (CE(C&P)/kuzhalmannam-Solar/2020-21)
ANERT - 2 MW Solar plant at Kuzhalmannam- Initialling of Power Purchase Agreement -Sanctioned Orders issued
Date: 2020-12-16739/2020 (PS1/2942/2019)
Sri. Anil Kumar P. Regarding the passing of an order on an application for protection under Section 20 of the Rights of Persons with Disabilities Act, 2016
Date: 2020-12-15738/2020/D(T&SO)/T6/TransGrid/Gl/20-21
Deployment of officers for sanctioned places at the O/o the Chief Engineer, TransGrid, Shoranur- Period of Extension - Sanctioned
Date: 2020-12-15737/2020 (LD.I/LBS/22020/03)
Payment of Professional fees to Sri.S.Raghu, Advocate, Bangalore for having conducted Appeal No. E/509/2009-DB
Date: 2020-12-15736/2020 (SCM/TA/Gl./2020-21)
Validity Period of Type Test(s) conducted on Major Electrical Equipment in Power Transmission System and Extension of validity date of Type Test Certificate
Date: 2020-12-14735 /2020(CE-IT / RITU/DR-Cherthala/20-21)
DR Centre of KSEB Ltd. at Infopark, Cherthala-Expiry of lease agreement -Renewal-Revising of rent and Security Deposit - Sanctioned
Date: 2020-12-11734 /2020 (DGC/AEE VI/CHKN /2014)
Execution of balance civil works of Chathankottunada SHEP Stage II-Contract with M/s K.K.Builders-Excess items
Date: 2020-12-11732/2020(KSEB/TRAC/CT/KFON/2020-21)
Filing of petition in the matter of prior intimation on implementation of KFON in compliance with directions in the Suo motu order
Date: 2020-12-07730/2020 (DGC/AEE VI/Land/2014)
Travel Facility- An order issued by the Chief Coordinator, Land Management Unit raising the travel limit of the vehicle allotted to it
Date: 2020-12-07731 /2020 (DGC/AEE VI/Galv /2014)
Hot dip galvanization of 6800 MT of 'A' poles fabricated at the Mechanical Facilities of KSE Board Ltd. having length up to 14m in single dip or double dip method
Date: 2020-12-07729/2020 (Fin.IVB)/KFC-LT Loan/2020-21
Long Term Loan of ₹500Crore availed from M/s KFC - repayment of interest - Sanctioned Orders issued
Date: 2020-12-04728/2020(D(D&IT)/D5/Scrap/2020-21/0001)
Disposal of unserviceable Teak Wood Pole scrap available at various Electrical Sections under Electrical Circle, Thiruvananthapuram- Single tender
Date: 2020-12-03727/2020/CML-EE2-AEE-2/Deviar MHEP/2020-21/CE(C&T)
Deviyar Micro Hydro Electric Project(50kW) by M/s Hydro Power- Purchase of Power at Interim Tariff-Sanctioned - Orders issued
Date: 2020-12-02726/2020 (CE-IT / RITU/CDAC/20-21)
Implementation of projects under Smart Power Quality Centre (SPQC) for Distribution Grid - Executing Memorandum of Understanding between KSEBL and CDAC
Date: 2020-12-01725/2020(IT/Proj/RAPDRP/KDN/AMC/2020-21)
Implementation of IT projects under Part-A of RAPDRP and Non-RAPDRP in KSEBL - Coninuation of FMS and AMC services for the IT equipments implemented
Date: 2020-12-01724/2020(No.IT/CU/NACH-Bills/2020-21)
Change in NACH debit date - Sanctioned - Orders issued
Date: 2020-12-01723 /2020(KSEB/TRAC/ CG/RGCCP /2020-21)
Annual Fixed charges of RGCCPP, Kayamkulam for 2019-24 - Sanctioned - Orders issued
Date: 2020-11-30722/2020 (SCM/XH-AEE3/eP.44/2019-20/AB Switch)
Supply of 11kV, 400Amp. AB Switches under rate contract basis for one year from Registered Vendors -Bank Guarantee - Sanctioned
Date: 2020-11-3054/ 2020(Soura/ Consumer Agreement/ 2019-20)
Soura Project, Phase I-Authorising Assistant Executive Engineers to sign Soura Consumer agreement and issuing notification regarding subsidy programme- Approved
Date: 2020-01-241579/2015 (Estt.III/CR-Rules/2006)
Promotion of employees in workmen category to officer category - Implementing Performance Appraisal Reporting system - orders issued
Date: 2015-06-27510/2010 (DPC II/AE/T&C of Supply.02/2009)
Guidelines for effecting service connections
Date: 2010-02-24Volume – 1
Board Orders & Circulars Volume – 1
Date: 2010-01-25Volume – 2
Board Orders & Circulars Volume - 2
Date: 2010-01-25259/2010 (LA.V/5751/2009)
ISO Certification - Accreditation of Meter Testing Units of KSE Board with NABL - Engaging Consultancy
Date: 2010-01-253210/2009 (KSEB/TRAC/Comp(R)/20/07)
Tariff applicable to Ready Mix Concrete units
Date: 2009-12-182681/2009 (Plg.Com. 3472/97/09-10)
Interest on arrears accrued prior to 01.11.2008
Date: 2009-10-192624/2009 (PS-I/1027/2009)
Arrears of Dearness Allowance – Crediting to General Provident Fund Account – Extending of time limit
Date: 2009-10-142577/2009(FEMU/CDM/Hydro/2008)
Clean Development Mechanism-Development of H.E Projects- Pre-requisites with respect to PDD submission-Stakeholders meetings at project sites
Date: 2009-10-082448/2009(LAS.1/7791/2009)
Date of retirement of Employees of KSE Board - Government Order – Implementation
Date: 2009-09-222422/2009(Plg.Com 3842/07/KWA/Arrear/09-10)
Settlement of arrears in respect of M/s. Kerala Water Authority – Implementation of the Government Order dated 26.09.2008
Date: 2009-09-192192/2009 (KSEB/TRAC/COMP(R)/14/09)
Tariff applicable to Tea Blending & Packing Units - LT-VII(A) Commercial Tariff
Date: 2009-08-202081/09 (Plg.Com 4576/Waiver of MD/08)
Waiver of minimum demand charges/fixed charges for electricity in respect of all the closed LT/HT Industrial units and plantations - Implementation of the Government Order
Date: 2009-08-111817/2009(Plg.Com 4649/08/SC/09-10)
Realization of marginal cost and thermal surcharge in respect of M/s. Kerala Water Authority
Date: 2009-07-141779/2009 (IT/CU/168/RTIA/09-10)
Accepting applications, complaints etc. at the field offices - Acknowledgement receipt
Date: 2009-07-09