Board Orders
460/2020(Soura/Consumer Agreement/2019-20)
Soura Project, Phase- I - Authorising Deputy Chief Engineers to sign consumer agreements of HT consumers (Model I and II) Approved- Orders Issued
Date: 2020-07-03459/2020 (Soura /3/ SOURA-Subsidy-Domestic/2019-20)
Implementation of Make in India SPV Panels, Inverters and other accessories in solar procurement tenders in KSEBL - as implementing agency-Adopting GO
Date: 2020-07-03455/2020(IT/Proj/IPDS/ERP/2020-21)
Implementation of Enterprise Resource Planning (ERP) in KSEB Ltd. under Partial turn key basis /departmental execution as part of IPDS
Date: 2020-07-02456/2020 (D (D&IT)/D6-AE1/Tender /2019-20)
Execution of Dyuthi works- Acceptance of single tender after re-tendering of petty contract works with PAC up to Rs.5 lakhs - Sanctioned
Date: 2020-07-02458/2020 (DGC/AEE-II/ DRIP/General/2018)
DRIP Phase II - constitution of a new DSRP for inspection of dams of KSEBL, with experts from Kerala Water Resources Department, Geological Survey of India
Date: 2020-07-02457/2020(DGC/AEE-III/THYR/2014)
Execution of Balance Civil and Hydro Mechanical Works of Thottiyar Hydro Electric Project (40 MW/ 99 MU) - Contract with M/s PRIL-SSIPL Consortium
Date: 2020-07-02453 /2020 (D(D&IT)/D-2/LV&Int/Tata Coffee/ 2020-21)
Request of Sri. Krant K. James, Sr. Manager, Tata Coffee Ltd, Malakiparai Estate Athirappally Grama Panchayat, Thrissur, an existing HT consumer
Date: 2020-07-01450/2020/D(T&SO)/T4/Veh.20-21
Decommissioning of Departmental vehicle attached to 220kV Substation Sub Division Pothencode - Asset Decommissioning Note and hiring of vehicle- Sanctioned
Date: 2020-07-01449/2020 (DGE/ GI/ Sabarigiri Unit 4/2020-21)
Sabarigiri HEP- Report on vibration analysis of Unit 4 and request for shutdown of Unit 4 of Sabarigiri HEP, Moozhiyar- Sanctioned
Date: 2020-07-01454/2020 (D (D&IT)/D6-AE3/Ease of Doing Business/2018-19)
Special scheme for regularising connected load - extending the scheme period till 31st December 2020 - Sanctioned- Orders issued
Date: 2020-07-01452/2020 (D(D&IT)/D/AEC/Rent/11796/2018)
Extension of agreement period of rent for the building accommodating Electrical Division, Ponnani under Electrical Circle, Tirur - Sanctioned
Date: 2020-07-01451/2020/D(T&SO)/T1/Vilakulam/2020-21
Construction of 33kV outdoor substation at Vilakulam and 6.5Km of 33kV single circuit line from 110kV Substation, Varkala to 33kV Substation, Vilakulam
Date: 2020-07-01446/2020 (Fin 2 (B)/Canara /Covid/WCDL/2020-21)
Availing of Covid loan (WCDL) from M/s Canara Bank Sanctioned - Orders issued
Date: 2020-06-30448/2020 (DGC/AEE V/Ladrum/Land/2015)
Ladrum Small HEP-Land Acquisition- Remittance of contingency charge - Sanctioned -Orders issued
Date: 2020-06-30447/2020(DGC/AEE-III/MKLM/LA/2014)
Mankulam HE Project land acquisition-R & R package for project affected people - allotment of 3 cent plot to 9 Nos beneficiaries- sanctioned
Date: 2020-06-30445/2020(Fin.2(B)/Adhoc/Federal/2020-21)
Availing of Ad-hoc Working Capital Demand Loan of ₹25Crore from M/s Federal Bank -Sanctioned - Orders issued
Date: 2020-06-26444/2020 (EB.4(b)/Ovr (Ele)/Leave/2020-21)/21
Establishment: Conversion of Earned Leave availed against Special Disability Leave (SDL) sanctioned to Sri Ramachandran P (Emp Code 1050786),Overseer
Date: 2020-06-26442/2020/ (KSEBL/CIA/WAD/PPA-1/2019-20)
Constitution of Power Purchase Audit Cell (PPA Cell) in the office of Chief Internal Auditor- Sanction of staff strength - Functions of PPA Cell
Date: 2020-06-25441 /2020 [No. D (D, IT & HRM]/ PAT/ 2019-2020/]
Appreciating the efforts taken by Sri Mohanakumar BV, Deputy Chief Engineer and Sri R Bijuraj, Asst Exe Engineer in matters related to PAT Cycle II
Date: 2020-06-25437/2020/D(T&SO)/T4/ Irinjalakuda Land/20-21
Construction of 220/110kV GIS Substation at Irinjalakuda- purchase of land by negotiation through DLPC - sanctioned- orders issued
Date: 2020-06-25439/2020/D(T&SO)/T6/SO/SAMAST/2019-20
Implementation of SAMAST Framework in Kerala - Revised estimate- Approved- Orders issued
Date: 2020-06-25438/2020 (SOR/AMU 7/HTB 24/7295/2020)
State Public Health and Clinical Laboratory, Thiruvananthapuram (LCN 24/7295) -Compliance of Adalath decision dated 19.02.2020
Date: 2020-06-25443/2020(IT/CU/Covid-19/ACD/2020-21)
Steps to combat the pandemic, COVID 19 - Reassessment of Security Deposit - for LT/HT/EHT consumers - Sanctioned
Date: 2020-06-25440/2020 No.DGC/AEE-III/ 3021/90
Kakkad Hydro Electric Project - Construction of IC tunnel and power tunnel - Contract with M/s. G. Gopinathan - mode of settlement on award amount-Sanctioned
Date: 2020-06-25436 /2020/D(T&SO)/T4/Veh./20-21)
Decommissioning of Departmental vehicle attached to Transmission Sub Division Nedumangad -ADN and hiring of vehicle- Sanctioned
Date: 2020-06-25434 /2020 (KSEB/TRAC-D/Covid Pandemic – Tariff Concession/2020-21)
Granting subsidy to domestic consumers for the electricity charges and allowing installment facility for the bills issued from 20 th April 2020 to 19 th June 2020
Date: 2020-06-25433/2020 (DGC/AEE-II/ Idukki Extension/2019)
Idukki Extension Scheme- Preparation of FSR/DPR including preparation of Bid & Allied documents for selection of an EPC contractor for execution of the project
Date: 2020-06-24432 /2020/D(T&SO)/T2/Pugalur - Trissur /2020-21
Construction of 320 kV Pugalur - Thrissur HVDC line - Superannuation of Sri. George Mathew, Executive Engineer - Request from PGCIL- Sanction accorded
Date: 2020-06-24429/2020 (Fin.2(B)/UBI/CELC/2020-21)
Availing of Covid Emergency Line of Credit of ₹20crore from M/s. Union Bank of India -Sanctioned - Orders issued
Date: 2020-06-23430 / 2020 (PS I /2942/2019)
Mercy petition submitted by Sri. Vijayakrishnan. V, Overseer at Electrical Section, Mulakkuzha -60% Permanent Disability due to Parkinsons disease
Date: 2020-06-23428/2020 (SOR/HTB 6/618/CC Installment/2020-21)
Request for installment by M/s Travancore Cements Limited, Nattakom (LCN 6/618) -Sanctioned- Orders issued
Date: 2020-06-23427/2020 CE (C&P)/Solar Park-Ksd-Cheemeni/2020-21)
Setting up of 100 MW SPV project by SECI at Cheemeni, Kasargod, Kerala - Sanctioned -Orders issued
Date: 2020-06-23431 /2020 (No. CE (REES)/CP/BAK(2019-20)
BDPP-Installation of Ground mounted Solar PV Project at Brahmapuram - Appointment of Engineer in Charge - Sanctioned
Date: 2020-06-23426/2020 (DGC/AEE-II/DRIP/General/2018)
Hands on Training on the software FEAST - Permission for conducting class room training by observing COVID-19 protocol during the month of June 2020
Date: 2020-06-23417 /2020/SOR/Billing/HTB 17/3973/2020-21
Time extension for replacing faulty meter and exemption from imposition of penalty up to 30/06/2020 in respect of Ms.Kerafed, LCN 17/3973
Date: 2020-06-22425/2020 (DGC/AEE-II/DRIP/General/2018)
Developing Dam Break Model utilising in-house expertise in KSEBL - Dam Break Analysis for Poringalkuthu, Sholayar & Idamalayar Dams - Good Service Entry-Sanctioned
Date: 2020-06-22424 /2020(IT/CU/RAPDRP/BWSP/2020-21)
Implementation of IT projects under PART-A of RAPDRP and Non-RAPDRP in KSEBL - Work Contract awarded to M/s. Bharti Airtel Ltd. And M/s BSNL for MPLS/VPN
Date: 2020-06-22421/2020/D(T&SO)/T2/PVTH/Pinnakkanadu 33kV SS /2020-21
Construction of 33kV Substation at Pinnakkanadu and allied line works under Transmission Circle, Poovanthuruthu- Administrative sanction accorded
Date: 2020-06-22423/2020 (D(D&IT)/D/AEC/Rent/337/2020)
Shifting and fixation of rent for the building proposed for accommodating Electrical Section, Ranni Perunad under Electrical Circle, Pathanamthitta - Sanctioned
Date: 2020-06-22422 /2020/D(T&SO)/T1/Decommissioning/2020-21
Decommissioning of PPRA-VELI-TERLS 66kV Line from Locations 36 to 38 and 66kV Tower at Location 37 under Transmission Circle, Thiruvananthapuram
Date: 2020-06-22