|  Visit Old Website

Board Orders

146/2024 (CEIT/RITU/SCADA-PM)

Implementation of RDSS SCADA Projects in KSEBL - Formation of field implementation team with strategical units - Sanctioned - Orders issued

Date: 2024-04-11

148 /2024 (DGE/G2/AEE3/PGL-SHEP/2023-Part (1))

Poringalkuthu Small Hydro Electric Project (1x24MW) Execution of Electro and Hydro Mechanical works - Allonward - SSIPL Consortium - Request for Time Extension

Date: 2024-04-11

147/2024 (CAPs/AEE1/RDSS/PVTG HHs/2023-24)

Electrification of Unelectrified PVTG Households under RDSS - Administrative Sanction issued - Ratified - Orders issued

Date: 2024-04-11

150/2024 (DGC/AEE IV/SAS/2014)

Sengulam Augmentation Scheme (85 Mu) - Construction of a concrete gravity weir across Western Kallar, Intake arrangements, Diversion Tunnel, Exit Channel

Date: 2024-04-11

144/2024 (DGE/G2/AEE3/SHOLAYAR-RMU/2023)

Renovation & Modernization (R&M) Work of Sholayar Hydro Electric Project (3x18 MW): Issues with M/s. FEPL (FLOVEL) - Sanctioned

Date: 2024-04-09

140/2024 (DGC/AEEV/PES-Balance works/2018)

Pallivasal Extension Scheme (2X30 MW) - Balance Civil Works of Tunnel, Surge Shaft, Pressure Shaft, Penstock, Power House and Allied Works

Date: 2024-04-05

139/2024 (DGC/AEEV/Pallivasal/Ext.pipe/2020)

Pallivasal Hydro Electric Scheme (37.5 MW) - Extending 1600mm dia penstock from Anchor Block A9 of PES to the existing Pallivasal Power House

Date: 2024-04-05

138/2024 (E.20219/Fin2(B)/TMB/IB/OD-WCDL/2023-24)

Renewal of Credit limit of ₹75 Crore from M/s Tamilnad Mercantile Bank Limited, Thiruvananthapuram - Sanctioned - Orders issued

Date: 2024-04-05

141/2024 (DGC/AEEV/PES-Intake/2017)

Pallivasal Extension Scheme (2 X 30 MW) - Expression of Interest and Request for Proposal for Engineering design, construction works of intake structure

Date: 2024-04-05

130/2024(E395/KSEBL/FA/AAA/25/2024-S1)

Withdrawal of KWA arrears taken over by the Government as on 31.10.2023 - Sanctioned -Orders issued

Date: 2024-03-30

129/2024 (CS-KSEBL-Independant Director /2015-16)

Appointment of Prof. Arun Kumar in the Board of Directors of KSEBL as Independant Director- Reconstitution of Audit Committee & CSR Committee

Date: 2024-03-30

125 /2024 (No.CML-EE-2-AEE-2/CE(C&T)/Pathamkayam /2023-24)

Pathamkayam SHEP (8MW) by M/s MINAR Energy Projects Pvt. Ltd.-Exit clause-Further decisions - Sanctioned

Date: 2024-03-30

134/2024 (SOR/HTB/31/3805/2023)

Settlement of current charge arrears of M/s. Lausam Steel Rolling Mill (LCN 31/3805) under One Time Settlement Scheme 2023 - Sanctioned

Date: 2024-03-30

127/2024 (No.E.19528/Fin2 (B)/IB Federal Bank/OD/WCDL/2023-24)

Renewal and enhancement of credit facilities to Rs.475 Crores from M/s.Federal bank -Sanctioned - Orders issued

Date: 2024-03-30

132/2024 (SOR/AMU 4/HTB 21/3655/2023)

Settlement of current charge arrears of M/s. BGR Hotels (P) Ltd (LCN. 21/3655) under OTS Scheme 2023 - Sanctioned - Orders issued

Date: 2024-03-30

124/2024 (LAWIII/6398/2023)

WP(C) No.26889/2023 before the Hon'ble High Court of Kerala - Filed by Rojer Mathew and another -Request of the petitioner to remit the arrears in instalments

Date: 2024-03-27

123/2024 (No. CML-EE-2-AEE-2/CE(C&T)/Palakuzhy

Initialing of Power Purchase Agreement (PPA) with Palakkad Small Hydro Company Ltd for procuring power from Palakuzhy SHEP (1MW) - further negotiations reg

Date: 2024-03-27

120/2024 (CE(SCM)/ XH-AEE4/2023-24/ACSR conductor/SD/MSME)

Purchase order for the supply of ACSR Raccoon and Rabbit Conductors - Releasing of Permanent Security Depoist furnished by the local MSMEs - Sanctioned

Date: 2024-03-26

121/2024 (DGC/AEEIV/Dam safety/Vehicle/2023)

Sholayar HEP- Enhancing the monthly ceiling limit of department vehicle attached to Dam Safety Section, Sholayar from 1500 km to 2000 km - Sanction - Accorded

Date: 2024-03-26

118/2024 (No.CML-EE-2-AEE-2/CE(C&T)/Pathamkayam/2023-24)

Pathamkayam SHEP 8MW -KSERC approved PPA -Decision on Exit Clause & releasing difference amount - Sanctioned - Orders issued

Date: 2024-03-23

CS/KSEBL/Independent Director/2015-16

Independent Director Appointment

Date: 2024-03-19

FTD No.91/2024(DIRDIT)/AE5/2023/LOAD

Voluntary Declaration of Connected Load-Extending scheme.

Date: 2024-03-02

90/2024(DIRDIT-AE7/2023/10616)

Sanction for hiring a Contract Jeep with a monthly limit of 1750km from the existing 1500km attached to Electrical Section, Angamaly under Electrical Circle, Perumbavoor

Date: 2024-03-02

82/2024 (KSEBL/TRAC/CG/Co-ordination Committee/2023-24)

Reconstituting the Co-ordination Committee as per Regulation 54 of KSERC (Connectivity and Intra State Open Access) Regulations, 2013 - Sanctioned - Orders issued

Date: 2024-02-23

77/2024(SEC-ES-ST6/2023/326)

Family Pension Arrear from 10/2019 to 04/2023 in respect of Smt. P V Annamma, W/o Late. M V Poulose, Assistant Engineer (Rtd), PPO No.16643 - Sanctioned

Date: 2024-02-17

74/2024 (DTSO/T4/2023-24)

Execution of Monthly Contracts with Power Exchanges for purchase of 300MW power during March 2024 and 50MW during April and May 2024

Date: 2024-02-15

75/2024(DIRDIT-AE3/2023/8325)

Request for approval of Single tender- Outdoor 11 kV 630 A extensible RMU - SCADA and ABB compatible - Sanctioned - Orders Issued

Date: 2024-02-15

71/2024 (CAPS/AE2/RDSS/PVTG HHs/2023-24)

Electrification of Unelectrified PVTG Households under RDSS - Administrative Sanction accorded - Orders issued

Date: 2024-02-15

72/2024 (KSEBL/SEC/ESTT/33/2023-S2)

Establishment - Compassionate Employment Scheme - Appointment of dependants of KSEBL employees who die-in-harness - Select List for 10/2023 - Approved

Date: 2024-02-15

73/2024 (DIRTSO-AE5/2023/1513)

TransGrid 2.0 - Execution of Travancore Lines package I & II - Delay in getting road cutting approvals from NHAI - Releasing payment to the contractor

Date: 2024-02-15

69/2024 (SCM/TA-GI/2023-24)

Material Procurement - Pending issues raised by the Manufacturers and Suppliers in SCM unit -Specific observations and remarks - consolidated

Date: 2024-02-13

70 /2024 (KSEB/SCM/XM/AE(A)/2023-24

Procurement and Supply Chain Management framework for materials and services in KSEBL - Sanctioned - Orders issued

Date: 2024-02-13

68/2024 (DGC/AEEIII/MKLM/2014)

Mankulam HEP (2x20MW) - Land Acquisition - Ex gratia payment for non patta land through negotiated purchase - Sanctioned - Orders issued

Date: 2024-02-12

67/2024 (DIRTSO-AE5/TG/KottayamSS)

Transgrid - GIS package 2 - Construction of 400kV GIS Substation, Kottayam - Request of M/s Toshiba T&D systems (India) Ltd for payment

Date: 2024-02-12

66/2024 (E.11228/Fin2(B)/UBI/OD-WCDL/IB/2023-24)

Renewal of Existing FBWC limit of Rs.200Crore from M/s. Union Bank of India- Sanctioned - Orders issued

Date: 2024-02-12

61/2024 (PS 1(A)/OLGT-2024/GL for Middle Level Officers)

KSEBL - Guidelines for Online General Transfer of the Middle Level Officers – Modifications suggested in connection with certain provisions of the existing Guidelines

Date: 2024-02-02

60/2024 (PS 1(A)/OLGT-2024/Guidelines for Workmen)

KSEBL – Guidelines for Online General Transfer of the Workmen – Modifications – Sanctioned – Orders issued

Date: 2024-02-02

62/2024 (PS 1(A)/OLGT-2024/for Higher Level Officers)

KSEBL - Guidelines for Online General Transfer of the Higher Level Officers - Approved - Orders issued

Date: 2024-02-02

59/2024 (XD/AE3/SCM.70/2022-23)

Supply of 1400 nos of 11kV/ 433V, 100kVA, BEE Energy Efficiency Level 1 (1 star) rated distribution transformers with ISI marking - Arranging purchase

Date: 2024-02-02

48/2024 (SEC-ES-ST2/2023/587

Establishment-Compassionate Employment Scheme-Select list for 09/2023-Approved-Orders- issued

Date: 2024-01-31
Advanced Search