|  Visit Old Website

Board Orders

353/2021(EB7(e)/AE/(Ele)/Leave/3/2020)

Estt - Application for Leave Without Allowances on Medical Certificate in respect of Smt. Geetha S S, Assistant Engineer (Electrical) - Sanction accorded

Date: 2021-05-11

348/2021 (PS8/CW/NFA/Santhosh Abraham/2588/77/2020)

On 26.06.2018 - Non-fatal accident to Mr.Santosh Abraham due to fall from house while clearing rubber tree which fell on HT line

Date: 2021-05-10

347 /2021(KSEB/TRAC/R2/Ele.Rules 2020/20-21)

Implementation of the Electricity (Rights of Consumers) Rules 2020-Authorising Offices/Officials -Sanctioned- Orders issued

Date: 2021-05-10

351/2021 (EB3/Cashier/KPSC/2021)

Estt - Appointment of Junior Assistants/Cashiers through Kerala Public Service Commission -Execution of Indemnity bond - Sanction accorded

Date: 2021-05-10

350 /2021 (DGC/AEE VI/LAND /2014)

Appointment of Sri.S.Rejeeve as Chief Co-ordinator, Land Management Unit-Extension of period of appointment - Sanctioned

Date: 2021-05-10

349/2021 (CE(C&P)/Solar-THDCIL/2021-22)

PSA initialled between THDCIL and KSEBL for 5 MW capacity Solar PV project at Nellithadam in Ambalathara village of Kasargod District - Termination of Agreement

Date: 2021-05-10

346 /2021(KSEB/TRAC/CG/OA Billing methodology/2021-22)

Adopting new billing methodology for open access consumers - Sanction accorded - Orders issued

Date: 2021-05-07

345/2021 - Soura/Phase 1/20-21 /156

In order to ensure maximum capacity of KSEBL's plants included in Solar Phase 1 Model 1

Date: 2021-05-07

344/2021 (DGE/G3/General/2021-22)

Draft policy to be implemented on transfer of common place in manufacturing plants / plants under construction - Apporved

Date: 2021-05-06

343/2021(CML-EE1-AEE1/Wind-SECI-Tranche-VI/2021-22)

Provisional invoice raised by SECI for wind energy supplied for the month of March 2021-Effecting payment -Sanctioned-Orders issued

Date: 2021-05-06

337/2021 (Estt.II/1419/2021)

Establishment - Request for appointment under Compassionate Employment Scheme in respect of Sri. Anandhu Vinod

Date: 2021-05-06

334 /2021(SOR/AMU 6 LCN 2/226 / 2021)

M/s. Poisha Industrial Company Ltd.(LCN 2/226)-Settlement of Current charge arrears-Under OTS scheme 2021-Sanctioned-Orders issued

Date: 2021-05-06

325/2021 (Estt.II/5315/2020)

Establishment - Compassionate Employment Scheme - Appointment of dependants of KSEBL employees who die-in-harness - Revised Select List for 09/2020 - Approved

Date: 2021-05-06

341 /2021 (D(D,IT&HRM)/D-2/Service Connection/0039/2021-22)

Effecting service connection to a BPL consumer Smt. Lakshmikutty, Karukunnel, Kuzhoor under Electrical Section, Valayanchirangara - Sanction Accorded

Date: 2021-05-06

327/2021 (Estt.II/837/2021)

Establishment - Request for appointment under Compassionate Employment Scheme in respect of Sri. Manu Mohan M.S

Date: 2021-05-06

340/2021 (No. DGE/G3/PSDF/2020-21)

PSDF scheme -Supply, installation and Commissioning of various Testing equipment at various Power Houses of KSEBL- Purchase from the lone bidder

Date: 2021-05-06

332/2021(No.IT/CU/Online Promotion/2021-22)

Promotion of Digital transactions in KSEBL - Extension for waiver of application fee of new service connection applications submitted online- Sanctioned

Date: 2021-05-06

330 /2021 (No. DGE/G3/IHEP-Excitation Transformer/2021-22)

IHEP- Design, Engineering, Manufacturing and Supply at site 4 Nos. of dry type cast resin exciter transformers for the first & second stage units at Moolamattom

Date: 2021-05-06

329 /2021 (No. DGE/G3/Idamalayar-Battery/2020-21)

Idamalayar HEP - Supply, installation and commissioning of 220V(110 cells),400AH Plante type Lead acid battery set -proprietary item of M/s Exide Industries Ltd.

Date: 2021-05-06

328/2021 (Estt.v/925/2021)

Order issued by the Government of Kerala dated 11.02.2021 increasing the wages of daily wage/ contract employees

Date: 2021-05-06

339/2021(DGC/AEE V/Keerithodu/2019)

Keerithodu SHEP (2x6 MW- 27.65 MU)- Administrative Sanction - Accorded - Orders issued

Date: 2021-05-06

338/2021 (DGC/AEEV/Marmala/2014)

Marmala Small Hydro Electric Project (7 MW/23.02 Mu) - Land acquisition - Remittance of contingency charge - Sanctioned - Orders issued

Date: 2021-05-06

336/2021 (Estt.II/25/2019)

Establishment - Revision of qualification for recruitment to the post of Sub Engineer (Electrical) under 30% direct recruitment quota - Sanctioned - Orders issued

Date: 2021-05-06

326/2021 (Estt.I/5789/2020)

Establishment - Conversion of Earned Leave against Special Disability Leave in respect of Sri.Premachandran. N, Lineman Grade I, Electrical Section, Kutiady

Date: 2021-05-06

324/2021 (Estt.II/4290/2019)

Establishment - Appointment to the post of Assistant Engineer (Civil) under 10% in-service quota - Enhancing the upper age limit for appointment to 50 years

Date: 2021-05-06

323 /2021 (KSEB/TRAC/FSP/29/FY2020-21)

Filing of fuel Surcharge petition for the period from January to March 2021 -sanctioned-Orders issued

Date: 2021-05-06

342/2021 (IT/CU/FMS-RAPDRP/2020-21)

RFP for providing FMS with AMC for the Data Centre, DR Centre and MPLS Network- Issue of Letter of Award- Sanctioned- Orders issued

Date: 2021-05-06

331 /2021(IT/CU/Data Dump/2020-21)

Requirement of Data Dump for Data Analysis-Request from Resident Audit Officer of Accountant General - Sanctioned - Order issued

Date: 2021-05-06

335/2021 (SOR/AMU 3/5/5812/OTS 2021/2020-21)

Settlement of current charge arrears of M/s. Ashiyana Filament & Ropes (LCN 5/5812) under OTS Scheme 2021 – Sanctioned - Orders issued

Date: 2021-05-06

333/2021 (SOR/AMU 3/5/521/OTS2021/2020-21)

Settlement of current charge arrears under OTS Scheme 2021 - M/s. Meenachil Rubber Marketing & Processing Co-operative Society Ltd. (LCN 5/521) - Sanctioned

Date: 2021-05-06

322/2021(VIG/B3/3097/2020)

Disciplinary action initiated against Sri. Mohandas.S, Senior Assistant, Electrical Section, Thottabhagam (formerly Electrical Section, Mallappally) -Review petition

Date: 2021-05-05

319 /2021/D(T&SO)/T4/SO/Optic Fibre Leasing/2019-20)

Leasing of dark fibre - Extension of lease agreement- Sanctioned - Orders issued

Date: 2021-05-05

311 /2021/D(T&SO)/T4/SO/Appreciation-Mobile App/21-22

Introduction of indigenously developed Mobile App for real time monitoring of grid- Award of Good Service Entry- Approved

Date: 2021-05-05

310/2021/D(T&SO)/T2/NHAI/2021-22

Shifting of Utilities / Providing UG cables for EHT lines coming under the package corridor of National Highway Authority - Consent for according Administrative Sanction

Date: 2021-05-05

308 /2021(D(T&SO)/T7/Kavalam Land/21-22)

Rebuild Kerala Initiative -110kV Substation Kavalam- Procurement of land for the construction of new 110kV GIS Substation at Kavalam

Date: 2021-05-05

304 /2021(IT/CU/Ongrid Solar Refund/2020-21)

Refund to consumer of applicant - settlement of banked energy, registration fees and other eligible refunds - process automation-Sanctioned

Date: 2021-05-05

312/2021 (D(D&IT)/D-2/Santhwanasparsham/0001/2021-22)

Petition received from Sri.Gayan T.S, Thilayaparambil H, Eloor, Aluva, for shifting of line passing through his property, in the Adalath 2020

Date: 2021-05-05

309/2021 (D(D&IT)/D-2/Santhwanasparsham/0003/2021-22)

Petition received from Sri. Abdul Rasheed, Chittothayil House, Pallam, Thrissur in Santhwanasparsham Adalath - Shifting of line - Sanction Accorded

Date: 2021-05-05

305/2021 (D(D&IT)/D-2/Santhwanasparsham/0004/2021-22)

Petition received from Sri.Umar Mukthar, Kaaruvilli House, Vengola in the Santhwanasparsham Adalath - Shifting of line - Sanction Accorded - Orders issued

Date: 2021-05-05

320/ 2021(D(D&IT)/D5/Cable-Poles/2020-21/0001)

Cable drawal along electric poles of KSEBL by Cable TV Operators/ Others­-clarification in interest for installment and delayed payments

Date: 2021-05-05
Advanced Search

logo

Rating

Please rate us and give your valuable feedback if you are satisfied with this KSEBL website service.