564 /2021 (PSI /2617/PR/2018/Part XII)

Revision of Pay & Allowances of Officers in KSEB Ltd - Technical Allowances - Clarification -Orders issued

Date: 2021-07-30

563/2021 (LA&DEO/OP (Ele) Cases/2021)

OP (Ele) cases - Formulation of an appropriate compensation plan and other measures - Sanctioned - Orders issued

Date: 2021-07-30

562/2021 CE (C&T)/DBFOO-Jhabua/2021-22)

Dispute in the Station Heat Rate (SHR) in the Power Supply Agreement entered into under DBFOO basis with Jhabua Power Ltd-Judgment of APTEL

Date: 2021-07-29

561/2021 (SCM/L/103/2018-19)

Supply of Towers (MS) including hot dipped galvanized bolts, nuts, earthing sets and all required accessories for 220kV & 110kV MC/DC line - sanction accorded

Date: 2021-07-26

560/2021 (SCM/XT/AEE 4/ 129/2020-21/ACSR Wolf, Moose, Dog)

Petition filed by M/s.Shankar Conductors Pvt. Ltd. before the Hon'ble Kerala State Electricity Regulatory Commission vide OP No.16/2021- Final order implementation

Date: 2021-07-26

558 /2021(DGC/AEE-II/Desiltation/2015)

Desiltation of Reservoirs of KSEBL - Approval for Standard Operating Procedure for reservoirs of KSEBL and obtaining sanction from the Government

Date: 2021-07-19

557/2021(No CP/Plg.III/Restructuring - Corp Planning/2021)

Shifting of one place of Deputy Chief Engineer to Corporate Planning Wing - Sanctioned -Orders issued

Date: 2021-07-19

556/2021 (D(D&IT)/D4/ComplaintsI/20-21/0007)

Re connecting service connections in favour of Smt.Annakutty (Con No1167964003138&3139) dismantled during the flood 2018&2019

Date: 2021-07-16

553/2021(DGC/AEE-1/SHP-EMC/2016)

Kuriarkutty Karappara -Preparation of DPR for Sustainable Alternative Solutions to Kuriarkutty Karappara Irrigation Project (SAKKIP)

Date: 2021-07-16

555/2021 (No.HRD.7/LIB/2021-2022/ 91)

"Digitisation of the library (existing at 6th floor, Vydyuthi Bhavanam, Pattom, Thiruvananthapuram) following the Renovation and Modernisation

Date: 2021-07-16

554/2021 (HRD.25/Trg. PETARC-RPTI/21-22/100)

Training Calendar for Power Engineers' Training and Research Centre (PETARC), Moolamattom, Regional Power Training Institutes, Thiruvananthapuram

Date: 2021-07-16

547 /2021/D(T&SO)/T4/SO/Addn Fibre lease-KCCL/2020-21)

Sanction given to lease out one additional fibre in the Areakode-Kanhirode optic link to M/s Kerala Communicators Cable Ltd (KCCL) - Ratified- Orders issued

Date: 2021-07-15

542/2021(D(D&IT)/D6-AE1/Dyuthi/2020-21)

Dyuthi - Revision of existing plan and extension proposal for the financial year 2021-22 and 2022-23 -Sanctioned - Orders issued

Date: 2021-07-15

552/2021 (D(D&IT)/D-2/SOP/0015/20-21)

Temporary SOP to Adlux Exhibition Centre, Karukutty in favour of the Tahasildar(LR), Aluva Taluk under Electrical Section,Karukutty

Date: 2021-07-15

551/2021 (D (D&IT)/D4/shifting/2021-22/0002)

Shifting of 11kV OH line to facilitate construction of house in favour of Sri.Muhammed Shafeer under Electrical Section, Kalpetta - Sanctioned

Date: 2021-07-15

550/2021(D(D&IT)/D4/shifting/2021-22/0001)

Shifting of HT line for maintaining statutory clearance in favour of Smt.Indira,NGP Colony under Electrical Section, Kozhinjampara- Sanctioned

Date: 2021-07-15

549/2021(D(D&IT)/D4/Adalath/2020-21/0018)

Sandhvanasparsam Adalath 2021-Petitions received at the Sandhvana Sparsham Adalath conducted on 2/02/2021 at Kannur -Sanctioned

Date: 2021-07-15

548 /2021/D(T&SO)/T5/PKD/GIS Shornur/2021-22

Design, manufacture, supply, erection, testing and commissioning of 110kV GIS switchgear at 220kV Substation, Shornur - Work award - Sanction accorded

Date: 2021-07-15

546 /2021 (DGC/AEE VI/Pole Casting /2021)

Setting up of pole casting yard at Pothencode in Thiruvananthapuram district, Kundara in Kollam district and Moolamattom in Idukki District-Works Entrusted

Date: 2021-07-15

545/2021 (DGC/AEE-III/MKLM/LA/2014)

Mankulam HEP(40MW-82.08Mu) - Tendering of Civil Works of the Project- sanctioned-orders issued

Date: 2021-07-15

544/2021 CE (REES)/Filament Free Kerala/2019-20)

Filament Free Kerala Programme- Additional Purchase order for 25% additional quantity of 9W LED bulbs -Reduction in Security Deposit -Sanctioned

Date: 2021-07-15

543/2021 (Fin.2(C)/IREDA-STL/2021-22)

Availing of the Short Term Loan of M/s IREDA - ₹500 Crore - Sanctioned - Orders issued

Date: 2021-07-15

541/2021 (XH-AEE4/2020-21/CE(SCM)/ACSR conductor/eP.59)

Purchase of ACSR Rabbit Conductors from M/s.Traco Cable Company Ltd and Kerala Based MSMEs- Sanctioned - Orders issued

Date: 2021-07-15

540/2021(VIG/A4/2298/2017)/2289

Short Assessment bill issued to M/s King Fisheries Ltd, Neendakara under Electrical Section, Chavara due to wrong multiplication factor - Loss sustained to KSEBL

Date: 2021-07-14

539/2021(VIG/A4/2298/2017)/2290

Short Assessment bill issued to M/s King Fisheries Ltd, Neendakara under Electrical Section, Chavara due to wrong multiplication factor - Loss sustained to KSEBL

Date: 2021-07-14

538/2021(VIG/A4/2298/2017)/2291

Short Assessment bill issued to M/s King Fisheries Ltd, Neendakara under Electrical Section, Chavara due to wrong multiplication factor - Loss sustained to KSEBL

Date: 2021-07-14

537 /2021(VIG/A4/2298/2017)/2293

Short Assessment bill issued to M/s King Fisheries Ltd, Neendakara under Electrical Section, Chavara due to wrong multiplication factor - Loss sustained to KSEBL

Date: 2021-07-14

536/2021(VIG/A4/2298/2017)

Short Assessment bill issued to M/s King Fisheries Ltd, Neendakara under Electrical Section, Chavara due to wrong multiplication factor - Loss sustained to KSEBL

Date: 2021-07-14

535/2021 (D (D&IT)/D6-AE2/Anganwadi/2021-22)

Special Scheme to provide electric connection free of cost to the Un-Electrified Anganwadis in the State -Sanctioned - Orders issued

Date: 2021-07-13

534/2021 (CP/Plg.1/BWCCL/2021-22)

Baitarni West Coal Company Limited (BWCCL)- Change of Nominee Director of KSEBL -sanctioned -orders issued

Date: 2021-07-12

533/2021/CE(REES)/INNOV/T4/PCS/FAME II/2021-22

Establishment of EV Charging Stations in the State under Government of India (FAME II) schemes -Administrative sanction and budget approval- sanctioned

Date: 2021-07-12

532/2021 (VIG/B6/100-1087/2015)

Disciplinary action against Sri.Reghu Nath.P.B, Deputy Chief Engineer(Rtd), Electrical Circle, Irinjalakuda (Former Executive Engineer, Generation Division, Kakkayam)

Date: 2021-07-12

531/2021 (D(D&IT)/D4/Tender/2021-22/0002)

Awarding PMU works - single valid bid on re-tendering- Sanctioned - Orders issued

Date: 2021-07-08

530 /2021(PS 1/2942/2019)

Shri. Jayakumar M.C (Employee Code 1059394), Lineman Grade-1 of Arur Electrical Section, suffered 83%

Date: 2021-07-08

527/2021 (Estt.I/1271/2021)

Establishment - Permission to leave the country for short duration for private purpose - Enhancement of leave period - Sanctioned - Orders issued

Date: 2021-07-08

526/2021 (Estt.I/5886/2018)

Establishment - Extension of Special Disability Leave for the regularization of absence in service in respect of Sri.K.P.Varghese, Lineman Grade I

Date: 2021-07-08

529/2021 (Sports Cell/M/44/2021)

Sports Cell - Selection of new Managers for the KSEB Basketball (Men) team and KSEB Volleyball (Women) team - Orders issued

Date: 2021-07-08

528/2021(PC/SCM/PSC Poles/2017-18/North &South Central/Addl. PO)

Procurement of PSC Poles for various Electrical Circles- Amendment of Additional Purchase Orders already issued - waiving penalty and granting time extension

Date: 2021-07-08

525/2021 (CE(C&P)/KSP-THDCL-Paivalike/2021-22)

Procurement of power from THDC India Ltd's Solar PV Project of 50MW capacity at Paivalike in Kasargod Solar Park - modification of the initialled PSA dated 16.01.2019

Date: 2021-07-06

523/2021 (D(D&IT)/D/AEC/Bldg/370/2021)

Renovation, modification and construction of first floor to the existing building for accommodating Electrical Section, Kannanalloor under Electrical Circle, Kollam

Date: 2021-07-06