|  Visit Old Website

Board Orders

249 /2020(D(D&IT)/D6-AE3/Ease of doing Business/2018-19)

Special Scheme for regularising connected load for LT consumers- extending the Scheme period till 30th June 2020 - Sanctioned

Date: 2020-03-31

259/2020 (D(D&IT)/D-1/Minister-Complaint/2019-20/0162)

M/s. Quilon Co-operative Spinning Mills Ltd - LCN18/336 under Electrical Section, Chathanoor -Current charge arrears pending

Date: 2020-03-31

258/2020/CE(REES)/Projects/AEE2/West Kallada/2019-20

50MW Floating solar project at West Kallada- Sanctioned - Orders issued

Date: 2020-03-31

247/2020 (D(D&IT)/D/AEC/Bldg/100/2020)

Construction of building for accommodating Electrical Section, Mulleria under Electrical Circle, Kasaragod - Revised Administrative Sanction accorded

Date: 2020-03-30

243/2020 (DGC/AEE-II/HT/General/2014)

Kerala Hydel Tourism Centre - Permissive Sanction to KHTC to use KSEBL's land on monthly revenue sharing basis as agreed

Date: 2020-03-30

246/2020 (CEIT&CR/ RITU/KFON/2019-20)

Kerala Fibre Optic Network (KFON) Project- Ratification of actions taken for KFON project-Entering MoU with KSITIL for Package-B project - Sanctioned

Date: 2020-03-30

245/2020(DGC/AEE-I/CHMBKDV/2017)

Chembukadavu SHEP-Stage III(3X2.50 MW)-Sanctions for Private Land acquisition-Sanctioned -Orders issued- Regarding

Date: 2020-03-30

244/2020/CE(REES)/SPV-MYLTY/2019-20

Installation and Commissioning of 1MW Grid tied solar PV power project at 220kv substation,Mylatty-Time extension- Sanctioned

Date: 2020-03-30

240/2020 (D(D&IT)/D/AEC/Veh/106/2020)

Hiring of vehicle (mini lorry 5 T) with driver for the use of TFRU, Palakkad under Electrical Circle, Palakkad - Sanctioned - Orders issued

Date: 2020-03-27

241/2020 [PS1 (A)/3214/GT/Guidelines for Officers]

KSEBL - Modifications suggested in connection with certain provisions of the ‘Guidelines for Online General Transfer of the Officers, dated: 22-02-2020’ – Sanctioned

Date: 2020-03-27

242/2020 [PS1 (A)/3214/GT/Guidelines for Workmen]

KSEBL - Modifications suggested in connection with certain provisions of the ‘Guidelines for Online General Transfer of the Workmen, dated: 22-02-2020’

Date: 2020-03-27

238/2020/D(T,SO&S)/T4/LA-Thumboor /2019-20

Construction of 33kV Substation at Thumboor under Transmission Circle, Thrissur- purchase of land by negotiation through DLPC- Correction in the B.O

Date: 2020-03-26

237/2020 (No. DGC/AEE-III/BKSHEP/2014)

Bhoothathankettu SHE Project (24 MW/83.5 Mu) - Contract with M/s Sree Saravana Engineering Bhavani Pvt Ltd - M/s. RPP Infra Projects Ltd Joint Venture

Date: 2020-03-26

236/2020/D(T&SO)/T5/2019-20/T&P

Protection from General Transfer 2020 to Employees working in Transgrid - Sanctioned

Date: 2020-03-26

235 /2020 (CE (REES)/ Filament Free Kerala/2019-20)

Procurement of one crore number of Nine Watts Light Emitting Diode (9W, LED) bulbs under Filament Free Kerala

Date: 2020-03-26

234/2020/D(T,SO&S)/T6/KLSY/Cherai-Njarackal/2019-20

Construction of 110kV Cherai-Njarakkal 'DC line for providing reliable power supply in Vyppin constituency-Floating tender on turn key basis-sanction accorded

Date: 2020-03-26

233/2020(D(T,SO&S)/T4/Veh/2019-20

Enhancing monthly ceiling limit of hired vehicles attached to Meter Testing Sub Division, Kozhenchery and Kundara - Sanctioned

Date: 2020-03-26

239 /2020/D(T,SO&S)/T4/LA-Madakkathara/2019-20

Land purchased by KSEBL for the construction of 400kV Substation at Madakkathara-Compensation paid by KSEBL as per Court Verdicts

Date: 2020-03-26

232 /2020 (D(GE)/G2/PGL/2019-20)

Execution of Electro mechanical works of Poringalkuthu 1 x 24 MW SHEP - Contract with M/s. Allonward - SSIPL Consortium

Date: 2020-03-25

230/2020 (DGC/AEE II / KAS/LAR/2014)

Establishment charges payable to the Revenue Department for Acquisition of land for KA Scheme for avoiding Revenue recovery by the District Collector, Kozhikode

Date: 2020-03-23

229 /2020 (DGC/AEE VI/Fab-Angly /2014)

Request of M/s TELK, Angamaly for using weigh-bridge at the KSEB Ltd premises under B&S Division, Angamaly- Extending the facility for one year

Date: 2020-03-23

228 /2020 (HRD.7/Trg. 243/19-20/535)

Four Weeks Switch Yard Maintenance training Programme using Live Line Maintenance Techniques using Hot Stick Method

Date: 2020-03-23

227 /2020 (Soura/Phase II- Subsidy /2019-20)

Tender Documents for Soura Phase - II Subsidy Scheme - Approved

Date: 2020-03-23

231/2020(CAPs/P1/RAPDRP/Kannur/Skipper/2019-20)

Supplying, laying, testing and commissioning of 46.95 kM of 11 kV 3X300 Sqmm XLPE Aluminium UG Cable on Turnkey basis at various locations

Date: 2020-03-23

225/2020(No.HRD.7/ISTP AE-SE/PETARC/2019-20/534)

Induction cum Statutory Training Programme (ISTP) for a combined batch of newly recruited Assistant Engineers (Ele.) and Sub Engineers (Ele.)

Date: 2020-03-20

224/2020 (VIG/B3/2096/2017)/659

Disciplinary action against Sri. Mohammedali Manu.F, Superintendent, O/o the Financial Adviser

Date: 2020-03-20

223/2020/D(T&SO)/T7/TransGrid/400 kV Kottayam/2019-20

TransGrid 2.0 - GIS Package 2 - Construction of 400 kV GIS Substation, Kottayam - Awarding of the work - Sanction accorded

Date: 2020-03-20

226/2020 (SOR/RG.II/SD-Bank Guarantee/Railway/2019-20)

Acceptance of 'Letter of Mandate' issued by Reserve Bank of India in lieu of the Bank Guarantee from Southern Railway against Security Deposit

Date: 2020-03-20

222 /2020 (No. CE(C&T)/DBFOO/LT/2014-15)

Long term procurement of power on DBFOO basis - Non approval of fuel surcharge in respect of 350 MW DBFOO contracts under Bid-2- filing of review petition

Date: 2020-03-20

221 /2020 (D(GE)/G2/PES /2019-20)

Pallivasal Extension Scheme (2x30MW) - Erection of Supplied Electro Hydro Mechanical Equipment and Supply and Erection of eBOP Equipment

Date: 2020-03-19

218/2020 (D(D&IT)/D/AEC/Bldg/91/2020)

Construction of Office complex at Sreekandapuram for accommodating offices of the Regional Audit Officer, Nodal Officer, Electrical Section and Sub Division

Date: 2020-03-19

217 /2020 (D(D&IT)/D6-AE 3/Innovation Fund/2018-19)

Innovation and ESCOT fund 2018-19-Implementation of High Voltage Distribution System (HVDS) in Tirur town -Revised Administrative Sanction Accorded

Date: 2020-03-19

220/2020 (D(D&IT)/D-4/General-Adalath 2020/2019-20)

KSEB Limited - Vydyuthi Adalath 2020 - Concession in the estimate rate - Collection of GST amount - Sanctioned

Date: 2020-03-19

216/2020/(D(T&SO&S/T1/Palode)

Upgradation of 66 kV Substation, Palode to 110 kV with 2 nos. of 110 kV feeder bays and installation of 2 nos. 12.5 MVA 110 / 11 kV transformers

Date: 2020-03-19

215 /2020/D(T&SO)/T3/ Kainatty-Sulthanbathery/2019-20

Upgradation and Conversion of 20.46km 66kV Kainatty-Sulthanbathery SC line to 110kV DC line - Tender excess sanctioned

Date: 2020-03-19

214/2020 (Estt.II/5674/2019)

Establishment - Sri. Biju Paul V, appointed as Electricity Worker from among Petty Contract Workers/Contract Line Workers

Date: 2020-03-19

212/2020 (D(D&IT)/D-1/General/2019-20/0030)

Shifting lines & UG cable in connection with the reconstruction of Puthukkurichi Bridge across Kadinamkulam Lake

Date: 2020-03-18

207/2020 (PC/SCM/Tender/Poles/19-20/S, C, N & NM)

Manufacture and supply of 8m and 9m PSC poles to various Electrical Circles in Northern Region, North Malabar Region, Central Region & Southern Region

Date: 2020-03-18

206/2020 (PC/SCM/PSC poles/17-18/North &South Central/Addl PO)

Procurement of PSC Poles for various Electrical Circles for the year 2019-20 - Placing additional orders - Sanctioned - Orders issued

Date: 2020-03-18

204/2020/D(T&SO)/T7/TransGrid/Sabari-TLP/2019-20

TransGrid 2.0 - Sabari Lines Package and Thrissivaperur line strengthening (Phase II) package -Awarding of the work - Sanction accorded

Date: 2020-03-18
Advanced Search

logo

Rating

Please rate us and give your valuable feedback if you are satisfied with this KSEBL website service.